Infirmary
New York Eye and Ear Infirmary of Mount Sinai
310 EAST 14TH STREET · East Village · BIN 1006511
💬 Discuss this project
1967Year Built
9Stories
I2Building Class
C1-7AZoning
102,314 sfGross Floor Area
1Units
LL97 Covered4 Active Violations 1 unresolved · 3 paperwork only 2 old, status unconfirmed ▸FISP: UNSAFE
Infirmary · 20,707 sf lot · 4.94 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofNew York Eye & Ear Jrgent Care1p · 1 filing · 20 docs
Floor 7New York Eye And Ear Infirmary6p · 1 filing · 9 docs
Floor 6New York Eye And Ear Infirmary5p · 1 filing · 9 docs
Floor 5Mount Sinai Health System, Beth Israel Medical Center22p · 2 filings · 19 docs
Floor 4Mount Sinai Health System, Beth Israel Medical Center22p · 2 filings · 19 docs
Floor 3New York Eye & Ear Jrgent Care8p · 1 filing · 20 docs
Floor 2New York Eye & Ear Jrgent Care8p · 2 filings · 20 docs
Floor 1New York Eye & Ear Jrgent Care, Beth Israel Medical Center +48p · 4 filings · 20 docs
CellarBeth Israel Medical Center, Mount Sinai Health System19p · 2 filings · 20 docs
Site & exteriorTemporary heavy duty sidewalk shed19p · 4 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Mount Sinai Health System1807/08/2026
New York Eye & Ear Hospital603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
R.G. Vanderweil Engineers303/27/2025
Studio A+T Architects202/24/2025
KZ Engineering210/01/2024
JC. Professionals112/01/2020
Timothy E. Krawetz1007/10/2020
Tohfaz Uddin PE303/11/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outsource Consultants1003/21/2026
Municipal Expediting2003/21/2026
Synergy Building Consultants203/21/2026
Green Light Expediting203/21/2026
Spring Scaffolding603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold2107/08/2026
Ceprine ConstructionScaffold1007/08/2026
Unity Construction ServicesGeneral Contractor507/08/2026
Gilbane Building CompanyGeneral Contractor403/21/2026
Current Fire ProtectionFire Protection307/08/2026
J T & T Air Conditioningspecialty_contractor203/21/2026
PSI PlumbingPlumbing107/08/2026
T.D. Electrical ServiceElectrical103/21/2026
R.C.M. ElectricElectrical103/22/2026
Par Plumbing CoPlumbing107/08/2026
PSI PartnersFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Outsource Special Inspection2827503/27/2025
J C Professionals1431112/01/2020
Special Inspection Services12001007/10/2020
Building Lifecycle
All (179)Filed (21)Permit Issued (27)Signed Off (12)Facade (FISP) (17)Violation (60)Inspection (6)Objection (6)Special Inspection (30)
05/18/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/12/2026
Permit issued — Sidewalk Shed
M00827310-I1-SH
08/06/2025
Cycle 9 facade report submitted
08/06/2025
Cycle 9 facade report signed — UNSAFE
07/28/2025
Signed off — Alteration
Sprinkler modifications on 1st Floor as shown on plans filed herewith. No change in egress, occupancy, or use.
M01158883-S4
07/15/2025
Signed off — Alteration
Sprinkler modifications on 1st Floor as shown on plans filed herewith. No change in egress, occupancy, or use.
M01158883-S3
07/15/2025
Signed off — Alteration
Sprinkler modifications on 1st Floor as shown on plans filed herewith. No change in egress, occupancy, or use.
M01158883-S1
07/15/2025
Cycle 9 facade inspection completed
07/14/2025
Signed off — Alteration
Sprinkler modifications on 1st Floor as shown on plans filed herewith. No change in egress, occupancy, or use.
M01158883-I1
07/14/2025
Signed off — Alteration
Sprinkler modifications on 1st Floor as shown on plans filed herewith. No change in egress, occupancy, or use.
M01158883-S2
07/10/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/01/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/02/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/24/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/07/2025
Permit issued — Sprinklers
M01158883-S4-EW-SP
04/04/2025
Permit issued — Plumbing
M01158883-S2-PL
03/27/2025
Filed — Alteration
Sprinkler modifications on 1st Floor as shown on plans filed herewith. No change in egress, occupancy, or use.
M01158883-S2
03/27/2025
Permit issued — Mechanical Systems
M01158883-S1-MS
03/21/2025
Filed — Alteration
Sprinkler modifications on 1st Floor as shown on plans filed herewith. No change in egress, occupancy, or use.
M01158883-S1
03/20/2025
Filed — Alteration
Sprinkler modifications on 1st Floor as shown on plans filed herewith. No change in egress, occupancy, or use.
M01158883-S4
03/05/2025
Permit issued — General Construction
M01158883-I1-GC
03/05/2025
Permit issued — Structural
M01158883-S3-ST
02/24/2025
Filed — Alteration
Sprinkler modifications on 1st Floor as shown on plans filed herewith. No change in egress, occupancy, or use.
M01158883-S3
02/20/2025
Filed — Alteration
Sprinkler modifications on 1st Floor as shown on plans filed herewith. No change in egress, occupancy, or use.
M01158883-I1
02/04/2025
Permit issued — Sidewalk Shed
M00827310-I1-SH
01/29/2025
Violation issued (ECB, open)
Construction
12/23/2024
Special inspection requirement — Sprinkler Systems
JONAR MADRIAGA
12/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
12/23/2024
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
12/23/2024
Special inspection requirement — Structural Steel - Details
JONAR MADRIAGA
12/20/2024
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
12/20/2024
Special inspection requirement — Interior lighting power
JONAR MADRIAGA
12/20/2024
Special inspection requirement — Final
JONAR MADRIAGA
12/20/2024
Special inspection requirement — Final
JONAR MADRIAGA
12/20/2024
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
12/20/2024
Special inspection requirement — Final
JONAR MADRIAGA
12/20/2024
Special inspection requirement — Maintenance information
JONAR MADRIAGA
12/20/2024
Special inspection requirement — Shutoff dampers
JONAR MADRIAGA
12/20/2024
Special inspection requirement — Duct leakage testing, insulation and design
JONAR MADRIAGA
12/20/2024
Special inspection requirement — Electrical motors and elevators
JONAR MADRIAGA
12/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
12/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
12/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
JONAR MADRIAGA
12/20/2024
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
10/01/2024
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00827310-P1
02/08/2024
Permit issued — Sidewalk Shed
M00827310-I1-SH
11/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/20/2023
Cycle 9 facade report submitted
04/20/2023
Cycle 9 facade report signed — UNSAFE
04/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/17/2023
Cycle 9 facade inspection completed
02/15/2023
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00827310-I1
02/15/2023
Permit issued — Sidewalk Shed
M00827310-I1-SH
12/20/2022
Violation issued (ECB, open)
Local Law
11/07/2022
Violation issued (ECB, open)
Construction
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/09/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/11/2021
Signed off — Alteration
Installing three Air conditioning systems, one in first floor and two in 6th floor as per plans and specifications included. No change in use egress or occupancy.
M00428149-I1
04/02/2021
Signed off — Alteration
PLYWOOD FENCE PROPOSED INSTALLATION OF PLYWOOD FENCE AS PER PLAN NO CHANGE IN USE, OCCUPANCY OF EGRESS UNDER THIS APPLICATION.
M00102956-I1
Latest 60 of 179 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedCeprine Construction01/12/2026
DOB NOWSprinklersSigned-offMora Fire Protection04/07/2025
DOB NOWPlumbingSigned-offPSI Plumbing04/04/2025
DOB NOWMechanical SystemsSigned-offUnity Construction Services03/27/2025
DOB NOWGeneral ConstructionSigned-offUnity Construction Services03/05/2025
DOB NOWStructuralSigned-offUnity Construction Services03/05/2025
DOB NOWSidewalk ShedPermit IssuedCeprine Construction02/04/2025
DOB NOWSidewalk ShedPermit IssuedCeprine Construction02/08/2024
DOB NOWSidewalk ShedPermit IssuedCeprine Construction02/15/2023
DOB NOWConstruction FenceSigned-offSpring Scaffolding03/02/2021
DOB NOWMechanical SystemsSigned-offJTT Air Conditioning12/05/2020
DOB NOWConstruction FenceSigned-offSpring Scaffolding11/17/2020
DOB NOWSprinklersSigned-offCurrent Fire Protection I08/19/2020
DOB NOWMechanical SystemsSigned-offGilbane Building Company07/31/2020
DOB NOWSprinklersSigned-offCurrent Fire Protection I06/16/2020
DOB NOWSprinklersSigned-offCurrent Fire Protection I03/13/2020
DOB NOWConstruction FenceSigned-offSpring Scaffolding03/02/2020
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/28/2020
DOB NOWSidewalk ShedSigned-offSpring Scaffolding01/07/2020
DOB NOWMechanical SystemsSigned-offGilbane Building Company12/28/2019
DOB NOWConstruction FenceSigned-offSpring Scaffolding12/16/2019
DOB NOWPlumbingSigned-offPar Plumbing Co12/12/2019
DOB NOWConstruction FenceSigned-offSpring Scaffolding10/16/2019
DOB NOWSidewalk ShedSigned-offSpring Scaffolding03/11/2019
DOB NOWSidewalk ShedSigned-offSpring Scaffolding12/27/2018
DOB NOWConstruction FenceSigned-offSpring Scaffolding11/26/2018
DOB NOWSidewalk ShedSigned-offSpring Scaffolding11/26/2018
BISOTISSUEDGilbane Building Company09/16/2020
BISOTISSUEDGilbane Building Company09/10/2020
BISPLISSUEDAce-Atlas Plbing & Heating03/12/2020
BISOTISSUEDPower Cooling04/02/2019
BISOTISSUEDPower Cooling04/02/2019
BISOTISSUEDPower Cooling04/02/2019
BISPLISSUEDAce-Atlas Plbing & Heating03/18/2019
BISOTISSUEDPower Cooling02/08/2019
BISOTISSUEDPower Cooling02/08/2019
BISOTISSUEDPower Cooling02/08/2019
BISOTISSUEDEmpire General Contracting06/15/2018
BISSPISSUEDAJC Sprinkler01/28/2015
BISPLISSUEDA.M.N07/30/2014
+ 37 more permits on file
1 project · most recent 07/10/2020
FiledStatusContractorScope
07/10/2020Signed-offCurrent Fire Protection I20 heads
1 project · most recent 07/10/2020
Water/Sanitary
FiledStatusContractorScope
07/10/2020——Water/Sanitary
15 projects · most recent 08/13/2026
General Wiring
FiledStatusContractorScope
08/13/2026Permit IssuedHigh Quality Electric of NYC—
08/13/2026Permit IssuedHigh Quality Electric of NYC—
08/08/2025CompleteOff Shore ElectricGeneral Wiring
05/18/2023Permit IssuedBorowide Elect'l Contractors—
04/04/2023CompleteThe Metro Group ElectricGeneral Wiring
03/16/2021CompleteLowy & DonnathGeneral Wiring
01/31/2020CompleteR.C.M. Electric—
12/27/2019CompleteHugh O'Kane Electric CoGeneral Wiring
09/03/2019CompleteLowy & DonnathGeneral Wiring
06/21/2019Permit IssuedStanco System Electrical ContGeneral Wiring
03/19/2019Permit IssuedNee ElectricalGeneral Wiring
03/15/2019CompleteStanco System Electrical Cont—
02/26/2019CompleteTop Shelf Electric—
12/05/2018Permit IssuedLowy & Donnath—
11/26/2018CompleteTop Shelf Electric—
1 project · most recent 10/01/2024
Sidewalk Shed
FiledStatusContractorScope
10/01/2024Permit IssuedCeprine ConstructionSidewalk Shed
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/18/2026Pass-Final General Construction Non-Directive 14PassView ↗
07/10/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
12/23/2024Sprinkler SystemsJONAR MADRIAGAspecial
12/23/2024Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
12/23/2024Post-installed AnchorsJONAR MADRIAGAspecial
12/23/2024Structural Steel - DetailsJONAR MADRIAGAspecial
12/20/2024Post-installed AnchorsJONAR MADRIAGAspecial
12/20/2024Interior lighting powerJONAR MADRIAGAenergy_progress
12/20/2024FinalJONAR MADRIAGAprogress
12/20/2024FinalJONAR MADRIAGAprogress
12/20/2024Mechanical SystemsJONAR MADRIAGAspecial
12/20/2024FinalJONAR MADRIAGAprogress
12/20/2024Maintenance informationJONAR MADRIAGAenergy_progress
12/20/2024Shutoff dampersJONAR MADRIAGAenergy_progress
12/20/2024Duct leakage testing, insulation and designJONAR MADRIAGAenergy_progress
12/20/2024Electrical motors and elevatorsJONAR MADRIAGAenergy_progress
12/20/2024Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
12/20/2024Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
12/20/2024Fire-Resistance Rated ConstructionJONAR MADRIAGAprogress
12/20/2024Energy Code Compliance InspectionsJONAR MADRIAGAprogress
11/20/2020HVAC and service water heating system controls OSAM GAYEDenergy_progress
11/20/2020HVAC and service water heating equipment OSAM GAYEDenergy_progress
11/20/2020Maintenance informationOSAM GAYEDenergy_progress
11/13/2020Mechanical SystemsOSAM GAYEDspecial
11/13/2020FinalOSAM GAYEDprogress
06/17/2020FinalChristopher Drutjonsprogress
06/17/2020Mechanical SystemsChristopher Drutjonsspecial
Latest 25 of 35.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
New York Eye & Ear Jrgent CareMedical / HealthcareFloors 1–3
Project M01158883 Alteration · LOC Issued · 02/20/2025
Beth Israel Medical CenterMedical / HealthcareCellar, Floors 4, 5
Project M00232259 Alteration · LOC Issued · 10/23/2019
Project M00232812 Alteration · LOC Issued · 10/21/2019
Mount Sinai Health SystemMedical / HealthcareCellar, Floors 1, 4, 5
Project M00232223 Alteration · Permit Issued · 10/10/2019
Project M00232810 Alteration · LOC Issued · 10/10/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 734 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch9
09/06/2026M00102956-I1Request digital key ↗
09/06/2026M00102124-I1Request digital key ↗
08/26/2026M00827310-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler6
09/05/2026M00232810-I1Request digital key ↗
09/05/2026M00232223-I1Request digital key ↗
08/15/2026M00232223-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00232810-I1Request digital key ↗
09/05/2026M00232223-I1Request digital key ↗
08/15/2026M00232223-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/05/2026M00232812-I1Request digital key ↗
09/05/2026M00232259-I1Request digital key ↗
09/04/2026M00428149-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00134680-I1Request digital key ↗
▸Applications & Permits147
▸BISPLAN / WORK APPROVAL APPLICATION82
01/26/2021123811731Open ↗
01/26/2021123811731Open ↗
11/30/2020123811731Open ↗
Showing 3 of 82 on file for this type
▸BISWORK PERMIT APPLICATION53
09/16/2020123811731Open ↗
09/10/2020123811731Open ↗
12/11/2019140870314Open ↗
Showing 3 of 53 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
09/02/2020123811731Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications163
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION93
12/27/2019123792057Open ↗
09/04/2019123503592Open ↗
09/04/2019123503592Open ↗
Showing 3 of 93 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/01/2026M00102956-I1Open ↗
09/01/2026M01158883-I1Open ↗
09/01/2026M01158883-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/06/2026M00102956-I1Open ↗
09/05/2026M00232810-I1Open ↗
09/05/2026M00232223-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026M00232810-P2Open ↗
09/01/2026M01158883-S4Open ↗
09/01/2026M01158883-S4Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
06/07/2018123395655Open ↗
05/16/2018123503592Open ↗
Showing 2 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/07/2018123395655Open ↗
Showing 1 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
10/15/2019140870314Open ↗
07/05/2019140857259Open ↗
▸Trade Schedules & Equipment61
▸BISSELF-CERT PLUMBING NOTICE26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISSCHEDULE B - PLUMBING15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
05/17/2019123554527Open ↗
05/10/2019123554527Open ↗
12/07/2018123554527Open ↗
Showing 3 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
05/10/2022123554527Open ↗
Showing 1 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection1
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
12/26/2019123792057Open ↗
▸Environmental & Asbestos40
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/05/2026M00232223-I1Open ↗
09/05/2026M00232259-I1Open ↗
08/24/2026M01158883-S1Open ↗
Showing 3 of 12 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
06/14/2018123503592Open ↗
Showing 1 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
03/12/2020123395655Open ↗
12/13/2019123811731Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
09/02/2020123811731Open ↗
02/08/2019123554527Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026M00232810-I1Open ↗
08/13/2026M00232812-I1Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
12/27/2019123792057Open ↗
11/06/2019123811731Open ↗
02/08/2019123554527Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
02/10/2021123811731Open ↗
09/02/2020123811731Open ↗
09/02/2020123811731Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
02/10/2021123811731Open ↗
07/13/2020140870314Open ↗
07/13/2020140870314Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/27/2020123554527Open ↗
▸Inspections & Test Reports27
▸BISTECHNICAL REPORT: RESPONSIBILITY14
02/10/2021123811731Open ↗
02/10/2021123811731Open ↗
01/19/2021123811731Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
11/27/2020123554527Open ↗
07/13/2020140870314Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
11/27/2020123554527Open ↗
▸BISCONCRETE - PRECAST1
11/27/2020123554527Open ↗
▸BISPOST-INSTALLED ANCHORS1
11/27/2020123554527Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
11/27/2020123554527Open ↗
▸Approvals, Objections & Sign-offs76
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST22
02/10/2021123811731Open ↗
07/13/2020140870314Open ↗
09/04/2019123503592Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
09/05/2026M00232810-I1Open ↗
09/05/2026M00232223-I1Open ↗
09/05/2026M00232259-I1Open ↗
Showing 3 of 18 on file for this type
▸BISADMINISTRATIVE OBJECTIONS16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
12/26/2019123792057Open ↗
11/25/2019123395655Open ↗
Showing 2 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
06/07/2018123395655Open ↗
Showing 1 of 5 on file for this type
▸BISMEDICAL GAS INST CERT : LETTER-MED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL2
11/27/2020123554527Open ↗
07/13/2020140870314Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
03/10/2020123811731Open ↗
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership61
▸BISCOST AFFIDAVIT57
11/18/2021123554527Open ↗
11/18/2021123554527Open ↗
11/18/2021123554527Open ↗
Showing 3 of 57 on file for this type
▸BISDEPT OF FINANCE VERIFICATION3
11/25/2019123395655Open ↗
11/25/2019123395655Open ↗
11/25/2019123395655Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
09/10/2020123811731Open ↗
▸Filing & Intake Forms64
▸BISEFILING COVER SHEET32
12/26/2019123792057Open ↗
11/04/2019123811731Open ↗
10/22/2019123811731Open ↗
Showing 3 of 32 on file for this type
▸BISADDITIONAL INFORMATION25
09/01/2020123811731Open ↗
08/18/2020123554527Open ↗
08/11/2020123811731Open ↗
Showing 3 of 25 on file for this type
▸BISBOROUGH INTAKE FORM5
03/24/2020123554527Open ↗
01/21/2020123395655Open ↗
11/13/2019123554527Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
10/15/2019140870314Open ↗
07/05/2019140857259Open ↗
▸Other Documents23
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION16
10/22/2019123811731Open ↗
10/22/2019123811731Open ↗
06/25/2019123811731Open ↗
Showing 3 of 16 on file for this type
▸BISUnknown4
11/04/2019123811731Open ↗
11/04/2019123811731Open ↗
11/04/2019123811731Open ↗
Showing 3 of 4 on file for this type
▸BISSupporting Document: Fee Exempt2
11/04/2019140870314Open ↗
Showing 1 of 2 on file for this type
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type