← Back
Elevator apt, fireproof without stores
310 EAST 24 STREET
MANHATTAN · Gramercy · BIN 1020598
💬 Discuss this project
1975Year Built
6Stories
D3Building Class
R8Zoning
44,835 sfGross Floor Area
70Units
LL97 CoveredRent Stabilized5 Open Violations ▸FISP: SAFE
Elevator apt, fireproof without stores · Owner of record: BETH ISRAEL MEDICAL CTR INC · 9,875 sf lot · 4.54 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbingGeneral
Floor 411p · 2 filings · 13 docs
Floor 3
Floor 24p · 1 filing · 4 docs
Floor 1
Filed — no permit issued5p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MSMC RESIDENTIAL REALTY2809/13/2026
ST LUKES HOSPITAL203/21/2026
BETH ISRAEL MEDICAL CTR INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURAL PRESERVATION STUDIO,103/16/2026
CUSTODIO CONSULTING, LLC503/03/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DJH ARCHITECTURE P C203/21/2026
DOMANI CONSULTING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STRUCTURE ENTERPRISE INCGeneral Contractor203/21/2026
WATER DYNAMIC P & H CORPPlumbing207/08/2026
MPS PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OUTSOURCE SPECIAL INSPECT2827103/16/2026
Building Lifecycle
All (103)Filed (7)Permit Issued (5)Signed Off (2)Facade (FISP) (18)Violation (60)Inspection (4)Objection (2)Special Inspection (5)
08/11/2026
Permit issued — Suspended Scaffold
M01440718-I1-SC
08/10/2026
Objection raised — Other
08/10/2026
Objection resolved — Addressed
08/04/2026
Filed — Alteration
Use of Material hoist to facilitate roof replacement at the property.
M01440718-I1
03/16/2026
Filed — Alteration
Roof Replacement as shown on plans filed herewith. No change in egress, occupancy or use.
M01294948-I1
03/06/2026
Cycle 10 facade report signed — SAFE
03/04/2026
Cycle 10 facade report submitted
02/05/2026
Cycle 10 facade inspection completed
01/30/2026
Violation issued (HPD, open)
B
01/30/2026
Violation issued (HPD, open)
B
01/30/2026
Violation issued (HPD, open)
C
10/03/2025
Special inspection requirement — Masonry
JONAR MADRIAGA
10/03/2025
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
10/03/2025
Special inspection requirement — Final
JONAR MADRIAGA
10/03/2025
Special inspection requirement — Air barrier - visual inspection
JONAR MADRIAGA
09/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
02/19/2025
Violation issued (HPD, open)
C
01/29/2025
Violation issued (HPD, closed)
B
01/29/2025
Violation issued (HPD, closed)
C
01/29/2025
Violation issued (HPD, closed)
C
01/29/2025
Violation issued (HPD, closed)
C
01/29/2025
Violation issued (HPD, closed)
C
02/21/2024
Violation issued (HPD, closed)
C
01/23/2024
Violation issued (HPD, closed)
C
01/23/2024
Violation issued (HPD, closed)
C
01/17/2024
Violation issued (HPD, closed)
C
01/17/2024
Violation issued (HPD, closed)
C
01/06/2024
Violation issued (HPD, closed)
C
01/06/2024
Violation issued (HPD, closed)
C
08/24/2022
Signed off — Alteration
GENERAL CONSTRUCTION ON THE 4TH FLOOR TO INCLUDE THE COMBINATION OF APARTMENTS 4D, 4E, AND 4F . WORK INCLUDES MODIFICATIONS TO PARTITIONS, DOORS, CEILING, MILL WORK AND FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00596266-I1
06/07/2022
Permit issued — Plumbing
M00305585-I1-PL
03/09/2022
Signed off — Alteration
PLUMBING FIXTURE MODIFICATIONS ON THE 4TH FLOOR FOR THE COMBINATION OF APARTMENTS 4D, 4E, AND 4F. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00596294-I1
03/03/2022
Filed — Alteration
PLUMBING FIXTURE MODIFICATIONS ON THE 4TH FLOOR FOR THE COMBINATION OF APARTMENTS 4D, 4E, AND 4F. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00596294-P2
02/15/2022
Violation issued (HPD, closed)
A
02/07/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/03/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/20/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/10/2021
Filed — Alteration
PLUMBING FIXTURE MODIFICATIONS ON THE 4TH FLOOR FOR THE COMBINATION OF APARTMENTS 4D, 4E, AND 4F. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00596294-P1
12/08/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/26/2021
Permit issued — Plumbing
M00596294-I1-PL
11/16/2021
Permit issued — General Construction
M00596266-I1-GC
10/05/2021
Filed — Alteration
GENERAL CONSTRUCTION ON THE 4TH FLOOR TO INCLUDE THE COMBINATION OF APARTMENTS 4D, 4E, AND 4F . WORK INCLUDES MODIFICATIONS TO PARTITIONS, DOORS, CEILING, MILL WORK AND FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00596266-I1
10/05/2021
Filed — Alteration
PLUMBING FIXTURE MODIFICATIONS ON THE 4TH FLOOR FOR THE COMBINATION OF APARTMENTS 4D, 4E, AND 4F. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00596294-I1
05/19/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/17/2021
Cycle 9 facade report signed — SAFE
05/04/2021
Cycle 9 facade report submitted
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/26/2021
Cycle 9 facade inspection completed
12/11/2020
Permit issued — Plumbing
M00305585-I1-PL
12/02/2020
Filed — Alteration
Plumbing Workon the 2nd Floor to modifications of plumbing fixtures in Apartments 2D, 2E, 2F and 2G. No change to use, egress or occupancy is involved.
M00305585-I1
03/13/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/05/2018
Violation issued (HPD, closed)
I
09/17/2018
Cycle 8 facade report submitted
09/16/2018
Cycle 8 facade report signed — SAFE
08/24/2018
Cycle 8 facade inspection completed
04/23/2018
Violation issued (ECB, closed)
Construction
04/23/2018
Violation issued (ECB, closed)
Construction
04/23/2018
Violation issued (ECB, closed)
Construction
03/24/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/17/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSPECIALTY CONSTR SYST INC08/11/2026
DOB NOWPlumbingPermit IssuedHYDRO PLBG & HTG CORP06/07/2022
DOB NOWPlumbingSigned-offMPS PLUMBING & HEATING IN11/26/2021
DOB NOWGeneral ConstructionSigned-offSTRUCTURE ENTERPRISE INC11/16/2021
DOB NOWPlumbingPermit IssuedHYDRO PLBG & HTG CORP12/11/2020
BISOTISSUEDOLYMPIC TORCH CONTRACTING12/02/2020
BISEQISSUEDSPRING SCAFFOLDING LLC04/02/2018
BISOTISSUEDSKYLINE RESTORATION INC02/25/2018
BISOTISSUEDSKYLINE RESTORATION INC01/23/2018
BISEQISSUEDSPRING SCAFFOLDING LLC04/27/2017
BISOTISSUEDSTANDARD WATERPROOFING C08/22/2006
BISEQISSUEDPERIMETER BRIDGE & SCAFFOLD07/11/2006
1 project · most recent 12/02/2020
Water/Sanitary
FiledStatusContractorScope
12/02/2020Permit IssuedWATER DYNAMIC P & H CORPWater/Sanitary
2 projects · most recent 03/30/2022
General Wiring
FiledStatusContractorScope
03/30/2022Permit IssuedCENTENNIAL ELEVATOR INDUSGeneral Wiring
04/14/2021CompleteFUSION ELECTL CONTRNG LLCGeneral Wiring
1 project · most recent 08/04/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/04/2026Permit IssuedSPECIALTY CONSTR SYST INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/03/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/20/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/03/2025MasonryJONAR MADRIAGAspecial
10/03/2025Post-installed AnchorsJONAR MADRIAGAspecial
10/03/2025FinalJONAR MADRIAGAprogress
10/03/2025Air barrier - visual inspectionJONAR MADRIAGAenergy_progress
09/29/2025Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
09/03/2026M00596294-I1Request digital key ↗
09/03/2026M00596294-P2Request digital key ↗
09/03/2026M00596294-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00305585-I1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION4
05/29/2020123922915Open ↗
04/26/2017140633768Open ↗
02/27/2017122994117Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION4
12/02/2020123922915Open ↗
04/09/2018140633768Open ↗
09/01/2017122994117Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications22
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
05/29/2020123922915Open ↗
01/07/2019140633768Open ↗
11/27/2018122994117Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026M00596294-I1Open ↗
09/03/2026M00596294-P2Open ↗
09/03/2026M00596294-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/23/2026M01294948-I1Open ↗
08/23/2026M01294948-I1Open ↗
08/23/2026M01294948-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/29/2020123922915Open ↗
04/26/2017140633768Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026M01294948-I1Open ↗
08/23/2026M01294948-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/29/2020123922915Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/26/2017140633768Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/26/2017140633768Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
05/29/2020123922915Open ↗
01/30/2017122994117Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00305585-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/03/2026M00596294-P2Open ↗
09/03/2026M00596294-P1Open ↗
09/03/2026M00596294-I1Open ↗
Showing 3 of 5 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
09/01/2017122994117Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/29/2020123922915Open ↗
11/27/2018122994117Open ↗
01/30/2017122994117Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/08/2022123922915Open ↗
▸BISLIGHTING CONTROLS1
06/08/2022123922915Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/26/2017140633768Open ↗
▸BISINTERIOR LIGHTING POWER1
06/08/2022123922915Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/27/2018122994117Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/08/2022123922915Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00596266-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/26/2017140633768Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
06/09/2022123922915Open ↗
01/07/2019140633768Open ↗
11/27/2018122994117Open ↗
▸BISFINAL1
06/08/2022123922915Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/09/2018140633768Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/15/2026M01440718-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
05/29/2020123922915Open ↗
11/27/2018122994117Open ↗
01/30/2017122994117Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/09/2022123922915Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET2
05/29/2020123922915Open ↗
01/30/2017122994117Open ↗
▸BISBOROUGH INTAKE FORM2
01/07/2019140633768Open ↗
11/27/2018122994117Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/26/2017140633768Open ↗
▸Other Documents3
▸BISSupporting Document: Fee Deferment1
01/30/2017122994117Open ↗
▸DOB NOWManufacturer's Specifications1
08/15/2026M01440718-I1Open ↗
▸DOB NOWCalculations1
08/15/2026M01440718-I1Open ↗