← Back
BuildNYC
Elevator apt, fireproof without stores
310 EAST 24TH STREET
MANHATTAN · Gramercy · BIN 1020598
💬 Discuss this project
1975Year Built
6Stories
D3Building Class
R8Zoning
44,835 sfGross Floor Area
70Units
LL97 CoveredRent Stabilized4 Active Violations 1 old, status unconfirmed ▸FISP: SAFE
Elevator apt, fireproof without stores · Owner of record: Beth Israel Medical CTR · 9,875 sf lot · 4.54 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMsmc Residential Realty LLC1 filing · 7 docs
Floor 4Unit 4D, Unit 4E11p · 2 filings · 13 docs
Floor 3
Floor 2Unit 2D, Unit 2E, Unit 2F +14p · 1 filing · 4 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MSMC Residential Realty2809/13/2026
St Lukes Hospital203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Architectural Preservation Studio103/16/2026
Custodio Consulting503/03/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DJH Architecture P C203/21/2026
Custodio Consulting803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Structure EnterpriseGeneral Contractor203/21/2026
Water Dynamic P & HPlumbing207/08/2026
MPS Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Outsource Special Inspection2827103/16/2026
Building Lifecycle
All (103)Filed (7)Permit Issued (5)Signed Off (2)Facade (FISP) (18)Violation (60)Inspection (4)Objection (2)Special Inspection (5)
08/11/2026
Permit issued — Suspended Scaffold
M01440718-I1-SC
08/10/2026
Objection raised — Other
08/10/2026
Objection resolved — Addressed
08/04/2026
Filed — Alteration
Use of Material hoist to facilitate roof replacement at the property.
M01440718-I1
03/16/2026
Filed — Alteration
Roof Replacement as shown on plans filed herewith. No change in egress, occupancy or use.
M01294948-I1
03/06/2026
Cycle 10 facade report signed — SAFE
03/04/2026
Cycle 10 facade report submitted
02/05/2026
Cycle 10 facade inspection completed
01/30/2026
Violation issued (HPD, open)
B
01/30/2026
Violation issued (HPD, open)
B
01/30/2026
Violation issued (HPD, open)
C
10/03/2025
Special inspection requirement — Masonry
JONAR MADRIAGA
10/03/2025
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
10/03/2025
Special inspection requirement — Final
JONAR MADRIAGA
10/03/2025
Special inspection requirement — Air barrier - visual inspection
JONAR MADRIAGA
09/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
02/19/2025
Violation issued (HPD, open)
C
01/29/2025
Violation issued (HPD, closed)
B
01/29/2025
Violation issued (HPD, closed)
C
01/29/2025
Violation issued (HPD, closed)
C
01/29/2025
Violation issued (HPD, closed)
C
01/29/2025
Violation issued (HPD, closed)
C
02/21/2024
Violation issued (HPD, closed)
C
01/23/2024
Violation issued (HPD, closed)
C
01/23/2024
Violation issued (HPD, closed)
C
01/17/2024
Violation issued (HPD, closed)
C
01/17/2024
Violation issued (HPD, closed)
C
01/06/2024
Violation issued (HPD, closed)
C
01/06/2024
Violation issued (HPD, closed)
C
08/24/2022
Signed off — Alteration
GENERAL CONSTRUCTION ON THE 4TH FLOOR TO INCLUDE THE COMBINATION OF APARTMENTS 4D, 4E, AND 4F . WORK INCLUDES MODIFICATIONS TO PARTITIONS, DOORS, CEILING, MILL WORK AND FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00596266-I1
06/07/2022
Permit issued — Plumbing
M00305585-I1-PL
03/09/2022
Signed off — Alteration
PLUMBING FIXTURE MODIFICATIONS ON THE 4TH FLOOR FOR THE COMBINATION OF APARTMENTS 4D, 4E, AND 4F. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00596294-I1
03/03/2022
Filed — Alteration
PLUMBING FIXTURE MODIFICATIONS ON THE 4TH FLOOR FOR THE COMBINATION OF APARTMENTS 4D, 4E, AND 4F. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00596294-P2
02/15/2022
Violation issued (HPD, closed)
A
02/07/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/03/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/20/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/10/2021
Filed — Alteration
PLUMBING FIXTURE MODIFICATIONS ON THE 4TH FLOOR FOR THE COMBINATION OF APARTMENTS 4D, 4E, AND 4F. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00596294-P1
12/08/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/26/2021
Permit issued — Plumbing
M00596294-I1-PL
11/16/2021
Permit issued — General Construction
M00596266-I1-GC
10/05/2021
Filed — Alteration
GENERAL CONSTRUCTION ON THE 4TH FLOOR TO INCLUDE THE COMBINATION OF APARTMENTS 4D, 4E, AND 4F . WORK INCLUDES MODIFICATIONS TO PARTITIONS, DOORS, CEILING, MILL WORK AND FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00596266-I1
10/05/2021
Filed — Alteration
PLUMBING FIXTURE MODIFICATIONS ON THE 4TH FLOOR FOR THE COMBINATION OF APARTMENTS 4D, 4E, AND 4F. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00596294-I1
05/19/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/17/2021
Cycle 9 facade report signed — SAFE
05/04/2021
Cycle 9 facade report submitted
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/26/2021
Cycle 9 facade inspection completed
12/11/2020
Permit issued — Plumbing
M00305585-I1-PL
12/02/2020
Filed — Alteration
Plumbing Workon the 2nd Floor to modifications of plumbing fixtures in Apartments 2D, 2E, 2F and 2G. No change to use, egress or occupancy is involved.
M00305585-I1
03/13/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/05/2018
Violation issued (HPD, closed)
I
09/17/2018
Cycle 8 facade report submitted
09/16/2018
Cycle 8 facade report signed — SAFE
08/24/2018
Cycle 8 facade inspection completed
04/23/2018
Violation issued (ECB, closed)
Construction
04/23/2018
Violation issued (ECB, closed)
Construction
04/23/2018
Violation issued (ECB, closed)
Construction
03/24/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/17/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSpecialty Construction Systems08/11/2026
DOB NOWPlumbingPermit IssuedHydro Plumbing & Heating06/07/2022
DOB NOWPlumbingSigned-offMPS Plumbing & Heating11/26/2021
DOB NOWGeneral ConstructionSigned-offStructure Enterprise11/16/2021
DOB NOWPlumbingPermit IssuedHydro Plumbing & Heating12/11/2020
BISOTISSUEDOlympic Torch Contracting12/02/2020
BISEQISSUEDSpring Scaffolding04/02/2018
BISOTISSUEDSkyline Restoration02/25/2018
BISOTISSUEDSkyline Restoration01/23/2018
BISOTISSUEDSkyline Restoration08/30/2017
BISEQISSUEDSpring Scaffolding04/27/2017
BISOTISSUEDStandard Waterproofing08/22/2006
BISEQISSUEDPerimeter Bridge & Scaffold07/11/2006
1 project · most recent 12/02/2020
Water/Sanitary
FiledStatusContractorScope
12/02/2020Permit IssuedWater Dynamic P & HWater/Sanitary
2 projects · most recent 03/30/2022
General Wiring
FiledStatusContractorScope
03/30/2022Permit IssuedCentennial Elevator IndustriesGeneral Wiring
04/14/2021CompleteFusion Electl ContrngGeneral Wiring
1 project · most recent 08/04/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/04/2026Permit IssuedSpecialty Construction SystemsSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/03/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/20/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/03/2025MasonryJONAR MADRIAGAspecial
10/03/2025Post-installed AnchorsJONAR MADRIAGAspecial
10/03/2025FinalJONAR MADRIAGAprogress
10/03/2025Air barrier - visual inspectionJONAR MADRIAGAenergy_progress
09/29/2025Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Mount Sinai Health SystemMedical / Healthcare—
Project M01440718 Alteration · Permit Entire · 08/04/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
09/03/2026M00596294-I1Request digital key ↗
09/03/2026M00596294-P2Request digital key ↗
09/03/2026M00596294-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00305585-I1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION4
05/29/2020123922915Open ↗
04/26/2017140633768Open ↗
02/27/2017122994117Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION4
12/02/2020123922915Open ↗
04/09/2018140633768Open ↗
09/01/2017122994117Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications22
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
05/29/2020123922915Open ↗
01/07/2019140633768Open ↗
11/27/2018122994117Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026M00596294-I1Open ↗
09/03/2026M00596294-P2Open ↗
09/03/2026M00596294-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/23/2026M01294948-I1Open ↗
08/23/2026M01294948-I1Open ↗
08/23/2026M01294948-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/29/2020123922915Open ↗
04/26/2017140633768Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026M01294948-I1Open ↗
08/23/2026M01294948-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/29/2020123922915Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/26/2017140633768Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/26/2017140633768Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
05/29/2020123922915Open ↗
01/30/2017122994117Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00305585-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/03/2026M00596294-P2Open ↗
09/03/2026M00596294-P1Open ↗
09/03/2026M00596294-I1Open ↗
Showing 3 of 5 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
09/01/2017122994117Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/29/2020123922915Open ↗
11/27/2018122994117Open ↗
01/30/2017122994117Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/08/2022123922915Open ↗
▸BISLIGHTING CONTROLS1
06/08/2022123922915Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/26/2017140633768Open ↗
▸BISINTERIOR LIGHTING POWER1
06/08/2022123922915Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/27/2018122994117Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/08/2022123922915Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00596266-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/26/2017140633768Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
06/09/2022123922915Open ↗
01/07/2019140633768Open ↗
11/27/2018122994117Open ↗
▸BISFINAL1
06/08/2022123922915Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/09/2018140633768Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/15/2026M01440718-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
05/29/2020123922915Open ↗
11/27/2018122994117Open ↗
01/30/2017122994117Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/09/2022123922915Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET2
05/29/2020123922915Open ↗
01/30/2017122994117Open ↗
▸BISBOROUGH INTAKE FORM2
01/07/2019140633768Open ↗
11/27/2018122994117Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/26/2017140633768Open ↗
▸Other Documents3
▸BISSupporting Document: Fee Deferment1
01/30/2017122994117Open ↗
▸DOB NOWManufacturer's Specifications1
08/15/2026M01440718-I1Open ↗
▸DOB NOWCalculations1
08/15/2026M01440718-I1Open ↗