← Back
BuildNYC
Elevator apt, semi-fireproof without stores
310 WEST 80TH STREET
MANHATTAN · BIN 1033722
💬 Discuss this project
1901Year Built
6Stories
D1Building Class
R8BZoning
22,728 sfGross Floor Area
36Units
Rent Stabilized0 Active Violations
Elevator apt, semi-fireproof without stores · Owner of record: 310 West 80th Street Owner · 5,108 sf lot · 4.45 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 6Unit 6B, Unit 6F23p · 4 filings · 20 docs
Floor 5Cap gas ranges and replace plumbing fixtures23p · 4 filings · 20 docs
Floor 4Unit 4D17p · 3 filings · 20 docs
Floor 3Unit 3B, Unit 3C, Unit 3D23p · 4 filings · 20 docs
Floor 2Unit 2A, Unit 2E, Unit 2F23p · 4 filings · 20 docs
Floor 1Unit 1A, Unit 1E, Unit 1F22p · 4 filings · 20 docs
CellarResidential renovationUnder Construction17p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
310 West 80th Street Owner103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/14/2024$11.2M—FONTENOY, LLC → 310 WEST 80TH STREET OWNER LLC$495/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Grasso-Menziuso Architects604/10/2026
Konoski Engineering204/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Premier Expediting Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Napoli Construction of NYGeneral Contractor1207/08/2026
Infiniti Esc PlumbingPlumbing309/12/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Grasso-Menziuso Architect1279604/10/2026
Konoski Engineering9111104/09/2025
Building Lifecycle
All (76)Filed (8)Permit Issued (9)Signed Off (4)Violation (23)Inspection (2)Objection (6)Special Inspection (24)
09/10/2026
Permit issued — Plumbing
M01207084-I1-PL
07/09/2026
Signed off — Alteration
M01130721-I1
07/09/2026
Signed off — Alteration
Minor partition work with general carpentry in apts 1a,,1b,,1c,,1d, 2b, 2c, 2d, 3f, 5a & 6d. No change to use, bulk or egress.
M01030789-I1
07/09/2026
Signed off — Alteration
Minor partition work with general carpentry in apts 1E, 1F, 2E, 2F, 3B,3D,, 4B,,4C,4F,5B, 5C, 5D, 5E, 5F, 6C & 6E. No change to use, bulk or egress.
M01054103-I1
05/14/2026
Signed off — Alteration
Cap and remove 36 gas ranges, Replace , relocate and add new plumbing fixture. No change to use, bulk or egress
M01138392-I1
04/29/2026
Violation issued (HPD, closed)
A
04/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Menziuso
04/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Menziuso
04/10/2026
Filed — Alteration
Cap and remove 36 gas ranges, Replace , relocate and add new plumbing fixture. No change to use, bulk or egress
M01138392-P1
03/03/2026
Violation issued (HPD, closed)
C
03/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Menziuso
12/26/2025
Special inspection requirement — Lighting in dwelling units
Christopher Menziuso
12/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Menziuso
12/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Menziuso
12/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Menziuso
12/26/2025
Special inspection requirement — Final
Christopher Menziuso
12/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Menziuso
12/18/2025
Filed — Alteration
Minor partition work with general carpentry in apts 1a,,1b,,1c,,1d, 2b, 2c, 2d, 3f, 5a & 6d. No change to use, bulk or egress.
M01030789-P1
12/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Menziuso
12/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Menziuso
12/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Menziuso
12/16/2025
Special inspection requirement — Final
Christopher Menziuso
12/16/2025
Special inspection requirement — Lighting in dwelling units
Christopher Menziuso
07/28/2025
Permit issued — General Construction
M01054103-I1-GC
07/25/2025
Permit issued — General Construction
M01030789-I1-GC
07/24/2025
Permit issued — General Construction
M01130721-I1-GC
07/10/2025
Permit issued — Plumbing
M01207084-I1-PL
04/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
christopher konoski
04/23/2025
Filed — Alteration
Filing herewith for Oil to Gas conversion for existing Boiler installed under application 101379688
M01207084-P1
04/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/09/2025
Filed — Alteration
Filing herewith for Oil to Gas conversion for existing Boiler installed under application 101379688
M01207084-I1
02/13/2025
Permit issued — General Construction
M01130721-I1-GC
02/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/04/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/31/2025
Permit issued — Plumbing
M01138392-I1-PL
12/04/2024
Objection raised — Inspections
12/04/2024
Objection resolved — Addressed
12/04/2024
Objection raised — Fire_Protection
12/04/2024
Objection resolved — Addressed
12/04/2024
Objection raised — Other
12/04/2024
Objection resolved — Addressed
11/26/2024
Filed — Alteration
Cap and remove 36 gas ranges, Replace , relocate and add new plumbing fixture. No change to use, bulk or egress
M01138392-I1
11/26/2024
Permit issued — General Construction
M01054103-I1-GC
11/25/2024
Permit issued — General Construction
M01030789-I1-GC
10/29/2024
Filed — Alteration
M01130721-I1
06/17/2024
Filed — Alteration
Minor partition work with general carpentry in apts 1E, 1F, 2E, 2F, 3B,3D,, 4B,,4C,4F,5B, 5C, 5D, 5E, 5F, 6C & 6E. No change to use, bulk or egress.
M01054103-I1
05/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Menziuso
05/20/2024
Special inspection requirement — Final
Christopher Menziuso
05/20/2024
Special inspection requirement — Energy Code Compliance Inspections
Christopher Menziuso
05/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Menziuso
05/20/2024
Special inspection requirement — Lighting in dwelling units
Christopher Menziuso
05/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Menziuso
04/24/2024
Filed — Alteration
Minor partition work with general carpentry in apts 1a,,1b,,1c,,1d, 2b, 2c, 2d, 3f, 5a & 6d. No change to use, bulk or egress.
M01030789-I1
12/10/2021
Violation issued (HPD, closed)
C
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/19/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedInfiniti Esc Plumbing09/10/2026
DOB NOWGeneral ConstructionSigned-offNapoli Construction of NY07/28/2025
DOB NOWGeneral ConstructionSigned-offNapoli Construction of NY07/25/2025
DOB NOWGeneral ConstructionSigned-offNapoli Construction of NY07/24/2025
DOB NOWPlumbingPermit IssuedInfiniti Esc Plumbing07/10/2025
DOB NOWGeneral ConstructionSigned-offNapoli Construction of NY02/13/2025
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing01/31/2025
DOB NOWGeneral ConstructionSigned-offNapoli Construction of NY11/26/2024
DOB NOWGeneral ConstructionSigned-offNapoli Construction of NY11/25/2024
BISBLISSUEDNeal M. Rudikoff09/09/1996
BISPLISSUEDCalray Gas Heat09/09/1996
2 projects · most recent 04/10/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/10/2026Signed-offInfiniti Esc PlumbingGas, Water/Sanitary
04/23/2025Permit IssuedInfiniti Esc PlumbingGas
1 project · most recent 01/29/2025
FiledStatusContractorScope
01/29/2025Permit IssuedInfiniti Electric36 meters
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
04/17/2026Tenant Protection Plan ComplianceChristopher Menziusospecial
04/17/2026Fire-Resistant Penetrations and JointsChristopher Menziusospecial
03/02/2026Tenant Protection Plan Compliance—special
03/02/2026Fire-Resistant Penetrations and JointsChristopher Menziusospecial
12/26/2025Lighting in dwelling unitsChristopher Menziusoenergy_progress
12/26/2025Tenant Protection Plan ComplianceChristopher Menziusospecial
12/26/2025Fire-Resistant Penetrations and JointsChristopher Menziusospecial
12/26/2025Energy Code Compliance InspectionsChristopher Menziusoprogress
12/26/2025FinalChristopher Menziusoprogress
12/26/2025Fire-Resistance Rated ConstructionChristopher Menziusoprogress
12/16/2025Fire-Resistance Rated ConstructionChristopher Menziusoprogress
12/16/2025Tenant Protection Plan Compliance—special
12/16/2025Fire-Resistant Penetrations and JointsChristopher Menziusospecial
12/16/2025Energy Code Compliance InspectionsChristopher Menziusoprogress
12/16/2025FinalChristopher Menziusoprogress
12/16/2025Lighting in dwelling unitsChristopher Menziusoenergy_progress
04/24/2025Tenant Protection Plan Compliancechristopher konoskispecial
04/22/2025Tenant Protection Plan Compliance—special
05/20/2024Tenant Protection Plan ComplianceChristopher Menziusospecial
05/20/2024FinalChristopher Menziusoprogress
05/20/2024Energy Code Compliance InspectionsChristopher Menziusoprogress
05/20/2024Fire-Resistance Rated ConstructionChristopher Menziusoprogress
05/20/2024Lighting in dwelling unitsChristopher Menziusoenergy_progress
05/20/2024Fire-Resistant Penetrations and JointsChristopher Menziusospecial
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026M01054103-I1Request digital key ↗
08/25/2026M01130721-I1Request digital key ↗
08/24/2026M01207084-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits5
▸DOB NOWLPC Approval/Permit4
08/20/2026M01030789-I1Open ↗
08/13/2026M01054103-I1Open ↗
08/13/2026M01130721-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION1
09/06/2024101379688Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/20/2026M01030789-I1Open ↗
08/17/2026M01138392-I1Open ↗
08/13/2026M01207084-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
10/04/2026M01138392-I1Open ↗
10/04/2026M01138392-I1Open ↗
09/02/2026M01030789-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026M01030789-P1Open ↗
09/02/2026M01030789-P1Open ↗
08/24/2026M01054103-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/20/2026M01030789-I1Open ↗
08/17/2026M01138392-I1Open ↗
08/13/2026M01030789-P1Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/05/2024101379688Open ↗