310 WEST 85 STREET
MANHATTAN · Upper West Side (Central) · BIN 1033860
💬 Discuss this project
1923Year Built
9Stories
D4Building Class
R8BZoning
48,184 sfGross Floor Area
36Units
LL97 CoveredRent Stabilized2 Open Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: MIMOSA EQUITIES CORP · 7,663 sf lot · 6.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof2p · 2 filings · 7 docs
Bulkhead1p · 1 filing · 18 docs
Floor 91 filing · 3 docs
Floor 8Under Construction2 filings · 14 docs
Floor 71 filing · 3 docs
Floor 61 filing · 3 docs
Floor 51 filing · 3 docs
Floor 43p · 3 filings · 17 docs
Floor 31 filing · 3 docs
Floor 21 filing · 3 docs
Floor 11 filing · 3 docs
Cellar1p · 1 filing · 12 docs
Sub-Basement1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MIDBORO MANAGEMENT1007/08/2026
RUDD REALTY MGMT1707/08/2026
TOPLINE NYC CONTRACTING307/08/2026
MIMOS A EQITIES CORP3603/22/2026
MIMOSA EQUITIES CORP MIDB103/22/2026
ROCKLEDGE SCAFFOLD CORP103/22/2026
MIMOSU EQUITIES C/O ARCO103/22/2026
MINOSA & EQUITIES CORP203/22/2026
THE OWNER OF103/22/2026
CHARTER COMMUNICATIONS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TROTH CONTRACTING INCGeneral Contractor303/21/2026
POFI CONSTRUCTION CORPGeneral Contractor203/21/2026
CALRAY GAS HEAT CORPPlumbing207/08/2026
ODYSSIA GLOBAL COMM. CORPGeneral Contractor203/21/2026
TOPLINE NYC CONTRACTINGGeneral Contractor107/08/2026
ROBERT CHIMENTIElectrical103/22/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
SENAD MEHOVICElectrical103/21/2026
CEPRINE CONSTRUCTION INCGeneral Contractor107/08/2026
STARCOM CONSTRUCTION COGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP PROF. ENG. PC9709104/20/2026
KZ ENGINEERING, P.C.4665104/20/2026
SCHERER DESIGN GROUP7921101/08/2025
LEO Y LEE ASSOCIATES2481305/20/2024
XENGINEERING D.P.C.6896210/05/2021
NEW YORK ENGINEERING ASSO851204/09/2021
Building Lifecycle
All (119)Filed (11)Permit Issued (9)Signed Off (3)Facade (FISP) (13)Violation (46)Inspection (3)Objection (4)Special Inspection (30)
08/26/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/11/2026
Permit issued — Structural
M01368880-I1-GC-CX
04/20/2026
Filed — Alteration
Interior and Exterior alterations throughout apartment and new through the wall a/c units. Structural work/partial demo-new openings as per plans submitted. Plumbing work filed under LAA# M01365791-I1-LA
M01368880-I1
03/07/2026
Special inspection requirement — Mechanical Systems
Eric Nixon
03/07/2026
Special inspection requirement — Interior lighting power
GIOVANNI COELLO
03/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
GIOVANNI COELLO
03/07/2026
Special inspection requirement — Lighting controls
GIOVANNI COELLO
03/07/2026
Special inspection requirement — Energy Code Compliance Inspections
GIOVANNI COELLO
03/07/2026
Special inspection requirement — Final
GIOVANNI COELLO
03/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Karol Zdancewicz
03/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
Eric Nixon
03/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Nixon
04/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/05/2025
Permit issued — Antenna
M01110058-I1-AN
01/22/2025
Objection resolved — Addressed
01/10/2025
Objection resolved — Addressed
01/09/2025
Objection raised — Scope
01/09/2025
Objection raised — Cost
01/08/2025
Filed — Alteration
Installation of new DISH telecom site on the roof. Install of 3 sectors (5 antennas) with associated parts, 6 RRH units, 1 GPS antenna, and 1 platform with related cabinets. Related conduits on the facade and service connection in the basement.
M01110058-I1
07/01/2024
Signed off — Alteration
Application filed for exterior/facade repairs as per drawings filed herewith. no change to use, egress or occupancy as a part of this application.
M00803507-I1
06/03/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Leo Lee
06/03/2024
Special inspection requirement — Post-installed Anchors
Leo Lee
06/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
Leo Lee
06/03/2024
Special inspection requirement — Masonry
Leo Lee
06/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Leo Lee
06/03/2024
Special inspection requirement — Preliminary
Michael Notaro
06/03/2024
Special inspection requirement — Final
Michael Notaro
05/20/2024
Filed — Alteration
Application filed for exterior/facade repairs as per drawings filed herewith. no change to use, egress or occupancy as a part of this application.
M00803507-P2
02/29/2024
Signed off — Alteration
M00878792-I1
05/25/2023
Filed — Alteration
M00878792-I1
05/25/2023
Permit issued — Sidewalk Shed
M00878792-I1-SH
04/10/2023
Permit issued — General Construction
M00803507-I1-GC
03/08/2023
Filed — Alteration
Application filed for exterior/facade repairs as per drawings filed herewith. no change to use, egress or occupancy as a part of this application.
M00803507-P1
03/08/2023
Special inspection requirement — Preliminary
Michael Notaro
03/08/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Leo Lee
03/08/2023
Special inspection requirement — Masonry
Leo Lee
03/08/2023
Special inspection requirement — Post-installed Anchors
Leo Lee
03/08/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Leo Lee
03/08/2023
Special inspection requirement — Tenant Protection Plan Compliance
Leo Lee
03/08/2023
Special inspection requirement — Final
Michael Notaro
02/24/2023
Filed — Alteration
Application filed for exterior/facade repairs as per drawings filed herewith. no change to use, egress or occupancy as a part of this application.
M00803507-I1
07/19/2022
Cycle 9 facade report signed — SWARMP
07/13/2022
Cycle 9 facade inspection completed
06/23/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/17/2022
Cycle 9 facade report submitted
12/23/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/20/2021
Permit issued — Plumbing
M00595362-I1-PL
11/21/2021
Permit issued — General Construction
M00592779-I1-GC
10/05/2021
Filed — Alteration
plumbing work on 4th floor apartment 4d- all finishes as per plans. ot to be filed under separate application # M00592779-I1.
M00595362-I1
10/05/2021
Filed — Alteration
interior renovations on 4th floor apartment 4d- all finishes as per plans. plumbing to be filed under separate application # M00595362-I1.
M00592779-I1
09/20/2021
Signed off — Alteration
REPLACE GAS RISER AND INSTALL NEW GAS METER.
M00275451-I1
09/16/2021
Special inspection requirement — Lighting controls
Tomasz Stachyra
09/16/2021
Special inspection requirement — Energy Code Compliance Inspections
Tomasz Stachyra
09/16/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tomasz Stachyra
09/16/2021
Special inspection requirement — HVAC-R and service water heating equipment
Tomasz Stachyra
09/16/2021
Special inspection requirement — Energy Code Compliance Inspections
Tomasz Stachyra
09/16/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tomasz Stachyra
09/16/2021
Special inspection requirement — Interior lighting power
Tomasz Stachyra
04/09/2021
Filed — Alteration
REPLACE GAS RISER AND INSTALL NEW GAS METER.
M00275451-P1
03/07/2021
Permit issued — Plumbing
M00275451-I1-PL
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedSTARCOM CONSTRUCTION CO06/11/2026
DOB NOWAntennaPermit IssuedODYSSIA GLOBAL COMM. CORP02/05/2025
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC05/25/2023
DOB NOWGeneral ConstructionSigned-offPOFI CONSTRUCTION CORP04/10/2023
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC12/20/2021
DOB NOWGeneral ConstructionPermit IssuedTROTH CONTRACTING INC11/21/2021
DOB NOWPlumbingSigned-offCALRAY GAS HEAT CORP03/07/2021
DOB NOWSupported ScaffoldPermit IssuedTOPLINE NYC CONTRACTING09/14/2020
DOB NOWPlumbingSigned-offCALRAY GAS HEAT CORP01/03/2020
BISOTISSUEDSTARCOM CONSTRUCTION CO08/26/2025
BISOTISSUEDTROTH CONTRACTING INC01/23/2025
BISOTISSUEDTROTH CONTRACTING INC12/08/2023
BISOTISSUEDTROTH CONTRACTING INC12/09/2022
BISOTISSUEDTROTH CONTRACTING INC12/04/2021
BISOTISSUEDTROTH CONTRACTING INC05/14/2020
BISPLISSUEDCALRAY GAS HEAT CORP05/04/2020
BISOTISSUEDPONICHTERA CONTRACTING IN07/01/2019
BISPLISSUEDZARA PLUMBING CORP04/15/2019
BISOTISSUEDK.I. OF NEW YORK INC04/09/2019
BISOTISSUEDNIKA CONTRACTING GROUP CO08/03/2018
BISOTISSUEDPONICHTERA CONTRACTING IN04/27/2018
BISOTISSUEDPONICHTERA CONTRACTING IN05/17/2017
BISOTISSUEDSKYLINE RESTORATION INC08/31/2016
BISOTISSUEDPONICHTERA CONTRACTING IN05/20/2016
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING04/14/2016
BISOTISSUEDSKYLINE RESTORATION INC02/26/2016
BISOTISSUEDPONICHTERA CONTRACTING IN11/25/2015
BISOTISSUEDPONICHTERA CONTRACTING IN10/21/2014
BISOTISSUEDTOP NOTCH CONTRACTING INC08/20/2014
BISPLISSUEDORBIT PLBG & HTG INC07/07/2014
BISOTISSUEDTOP NOTCH CONTRACTING INC08/22/2013
BISOTISSUEDJANBAR INC03/08/2013
BISOTISSUEDJANBAR INC01/30/2013
BISOTISSUEDTOP NOTCH CONTRACTING INC09/10/2012
BISPLISSUEDORBIT PLBG & HTG INC06/15/2012
BISOTISSUEDTOP NOTCH CONTRACTING INC05/15/2012
BISOTISSUEDTOP NOTCH CONTRACTING INC05/07/2010
BISOTISSUEDTOP NOTCH CONTRACTING INC05/01/2009
BISOTISSUEDNEW LIFE MASON & WATER04/21/2009
BISOTISSUEDTOP NOTCH CONTRACTING INC04/10/2009
+ 19 more permits on file
1 project · most recent 04/20/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/20/2026Permit IssuedSTARCOM CONSTRUCTION COAir Conditioning Systems
Cooling
Friedrich wcvt10b10b 11,000 BTU ×2
wcv10b10b 11,000 BTU · Ptac ×1
wcvt12b10b 13,500 BTU · Ptac ×1
1 project · most recent 10/05/2021
Gas Water/Sanitary
FiledStatusContractorScope
10/05/2021Permit IssuedORBIT PLBG & HTG INCGas, Water/Sanitary
7 projects · most recent 09/23/2026
General Wiring
FiledStatusContractorScope
09/23/2026CompleteE & M ELECTRICAL NY CORPGeneral Wiring
06/23/2026Permit IssuedCRESCO ELECTRICAL CORPGeneral Wiring
06/07/2023CompleteBOROWIDE ELECT'L CONTR'S—
10/30/2022CompleteSEGA ELECTRIC LLCGeneral Wiring
07/13/2022Permit IssuedROBERT CHIMENTI2 meters, 1 new_meters
09/19/2019CompleteBRUNI ELECTRIC INCGeneral Wiring
05/13/2019Permit IssuedR.C.M. ELECTRIC CORP.General Wiring
1 project · most recent 04/20/2026
FiledStatusContractorScope
04/20/2026Permit IssuedSTARCOM CONSTRUCTION CO1 scope_items
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/23/2022Pass-Final CND-Occupancy InspectionPassView ↗
12/23/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
03/07/2026Mechanical SystemsEric Nixonspecial
03/07/2026Interior lighting powerGIOVANNI COELLOenergy_progress
03/07/2026HVAC-R and service water heating equipmentGIOVANNI COELLOenergy_progress
03/07/2026Lighting controlsGIOVANNI COELLOenergy_progress
03/07/2026Energy Code Compliance InspectionsGIOVANNI COELLOprogress
03/07/2026FinalGIOVANNI COELLOprogress
03/07/2026Structural Stability – Alterations of existing buildingsKarol Zdancewiczspecial
03/07/2026Tenant Protection Plan ComplianceEric Nixonspecial
03/07/2026Fire-Resistant Penetrations and JointsEric Nixonspecial
06/03/2024Construction Operations Influencing Adjacent StructuresLeo Leespecial
06/03/2024Post-installed AnchorsLeo Leespecial
06/03/2024Tenant Protection Plan ComplianceLeo Leespecial
06/03/2024MasonryLeo Leespecial
06/03/2024Structural Stability – Alterations of existing buildingsLeo Leespecial
06/03/2024PreliminaryMichael Notaroprogress
06/03/2024FinalMichael Notaroprogress
03/08/2023PreliminaryMichael Notaroprogress
03/08/2023Construction Operations Influencing Adjacent StructuresLeo Leespecial
03/08/2023MasonryLeo Leespecial
03/08/2023Post-installed AnchorsLeo Leespecial
03/08/2023Structural Stability – Alterations of existing buildingsLeo Leespecial
03/08/2023Tenant Protection Plan ComplianceLeo Leespecial
03/08/2023FinalMichael Notaroprogress
09/16/2021Lighting controlsTomasz Stachyraenergy_progress
09/16/2021Energy Code Compliance InspectionsTomasz Stachyraprogress
Latest 25 of 32.
▾Documents — 219 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch8
09/03/2026M00595362-I1Request digital key ↗
09/03/2026M00592779-I1Request digital key ↗
08/31/2026M00878792-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00275451-I1Request digital key ↗
08/15/2026M00275451-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00398202-I1Request digital key ↗
▸Applications & Permits44
▸BISWORK PERMIT APPLICATION19
08/26/2025102085306Open ↗
05/15/2020102085306Open ↗
05/04/2020123379717Open ↗
Showing 3 of 19 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION16
11/14/2019123379717Open ↗
06/26/2019123379717Open ↗
06/14/2019102085306Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWLPC Approval/Permit9
08/27/2026M00803507-P1Open ↗
08/27/2026M00803507-I1Open ↗
08/17/2026M01368880-I1Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications55
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
11/22/2019123379717Open ↗
09/30/2019123379717Open ↗
08/03/2018123379717Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026M00595362-I1Open ↗
09/02/2026M00595362-I1Open ↗
09/01/2026M00592779-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/03/2026M00592779-I1Open ↗
08/31/2026M00878792-I1Open ↗
08/27/2026M00803507-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026M00595362-I1Open ↗
09/01/2026M00592779-I1Open ↗
08/31/2026M00275451-P1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/08/2015140329213Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/22/2007110005609Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/13/2016140482840Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/13/2016140482840Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/22/2007110005609Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/13/2016140482840Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
06/26/2019123379717Open ↗
06/29/2018123379717Open ↗
10/26/2015122558204Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
07/25/2008110005609Open ↗
07/10/2008110005609Open ↗
▸BISSCHEDULE B - PLUMBING1
10/22/2007110005609Open ↗
▸Safety & Tenant Protection5
▸DOB NOWTenant Protection Plan3
08/13/2026M00275451-P1Open ↗
08/13/2026M00275451-I1Open ↗
08/13/2026M00398202-I1Open ↗
▸BISTenant Protection Plan and Notes2
07/13/2018123379717Open ↗
06/29/2018123379717Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/03/2026M00592779-I1Open ↗
08/27/2026M00803507-P1Open ↗
08/27/2026M00803507-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
04/03/2008110116954Open ↗
04/03/2008110116954Open ↗
10/22/2007110005609Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
06/29/2018123379717Open ↗
10/26/2015122558204Open ↗
04/08/2015140329213Open ↗
Showing 3 of 4 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
11/16/2012121435394Open ↗
11/16/2012121435394Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
09/15/2016122558204Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
06/29/2018123379717Open ↗
10/25/2016140329213Open ↗
10/25/2016140329213Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
08/09/2019123379717Open ↗
05/01/2017122558204Open ↗
10/25/2016140329213Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/08/2015140329213Open ↗
04/08/2015140329213Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/13/2016140482840Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY6
04/13/2016140482840Open ↗
02/22/2016140329213Open ↗
12/07/2015140329213Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
12/28/2016140329213Open ↗
▸Approvals, Objections & Sign-offs28
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
09/22/2020123379717Open ↗
12/16/2019123379717Open ↗
11/22/2019123379717Open ↗
Showing 3 of 10 on file for this type
▸BISLANDMARKS APPROVAL6
11/22/2019123379717Open ↗
09/30/2019123379717Open ↗
07/24/2018123379717Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER5
08/26/2025102085306Open ↗
05/15/2020102085306Open ↗
05/04/2020123379717Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
11/16/2012121435394Open ↗
04/03/2008110116954Open ↗
10/22/2007110005609Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/04/2020123379717Open ↗
10/25/2016140329213Open ↗
▸BISFINAL1
09/21/2020123379717Open ↗
▸BISLANDMARKS SIGNOFF1
09/22/2020123379717Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT12
09/22/2020123379717Open ↗
11/22/2019123379717Open ↗
09/30/2019123379717Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms16
▸BISBOROUGH INTAKE FORM9
05/04/2020123379717Open ↗
12/16/2019123379717Open ↗
11/22/2019123379717Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET3
06/29/2018123379717Open ↗
10/26/2015122558204Open ↗
11/16/2012121435394Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
04/13/2016140482840Open ↗
04/08/2015140329213Open ↗
04/03/2008110116954Open ↗
▸BISADDITIONAL INFORMATION1
12/07/2015140329213Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
08/09/2019123379717Open ↗
06/28/2019102085306Open ↗
06/07/2019102085306Open ↗
Showing 3 of 4 on file for this type