← Back
Stand-alone food establishment
3101 ATLANTIC AVENUE
BROOKLYN · BIN 3430169
💬 Discuss this project
1957Year Built
1Stories
K5Building Class
R8AZoning
4,332 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Stand-alone food establishment · Owner of record: WHITE CASTLE SYSTEM, INC. · 20,653 sf lot · 0.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Permit Issued — active, not yet Signed-off
RoofUnder Construction42p · 2 filings · 20 docs
Floor 12Under Construction1 filing · 20 docs
Floor 11Under Construction1 filing · 20 docs
Floor 10Under Construction1 filing · 20 docs
Floor 9Under Construction1 filing · 20 docs
Floor 8Under Construction43p · 2 filings · 20 docs
Floor 7Under Construction44p · 2 filings · 20 docs
Floor 6Under Construction43p · 2 filings · 20 docs
Floor 5Under Construction43p · 2 filings · 20 docs
Floor 4Under Construction43p · 2 filings · 20 docs
Floor 3Under Construction44p · 2 filings · 20 docs
Floor 2Under Construction44p · 2 filings · 20 docs
Floor 1Under Construction43p · 2 filings · 20 docs
1 job · most recent 08/11/2026
Sprinkler System
FiledStatusContractorScope
08/11/2026Permit IssuedF.S. WORKS INCSprinkler System
1 job · most recent 08/11/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/11/2026Permit IssuedP.H. WORKS INCStorm, Water/Sanitary
7 jobs · most recent 08/24/2026
General Wiring
FiledStatusContractorScope
08/24/2026Permit IssuedNASH ELECTRIC SERVICES IN—
06/23/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
12/12/2025Permit IssuedHIVOLTS ELECTRICAL INCGeneral Wiring
12/11/2025Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
12/11/2025Permit IssuedM.R. ELEC'L SERVICE LLCGeneral Wiring
12/11/2025Permit IssuedPOWER DIRECT ELECTRIC INC101 meters, 101 new_meters
12/11/2025Permit IssuedPOWER DIRECT ELECTRIC INC1 meters, 1 new_meters
1 job · most recent 08/11/2026
Concrete
FiledStatusContractorScope
08/11/2026Permit IssuedDYNAMIC HOISTING SCAFF INConcrete
2 jobs · most recent 06/25/2026
Sidewalk Shed Fence
FiledStatusContractorScope
06/25/2026Permit IssuedHARTZION ENTERPRISES CORPSidewalk Shed
01/08/2026Permit IssuedEMPIRE MANAGEMENT & CON*Fence
Building Lifecycle
All (85)Filed (15)Permit Issued (17)Signed Off (1)Violation (3)Inspection (1)Objection (18)Special Inspection (30)
09/23/2026
Permit issued — Plumbing
B35174659-S5-PL
09/22/2026
Permit issued — Sidewalk Shed
B01421059-I1-SH
08/24/2026
Permit issued — Protection and Mechanical Methods
B01241582-S9-PMM
08/20/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
08/20/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
08/20/2026
Special inspection requirement — Protection of exposed foundation insulation
SHAHRIAR QUAYYUM
08/20/2026
Special inspection requirement — Air barrier continuity plan testing
SHAHRIAR QUAYYUM
08/20/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
08/20/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
08/20/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
08/20/2026
Special inspection requirement — Exterior lighting power
SHAHRIAR QUAYYUM
08/20/2026
Special inspection requirement — Electrical motors and elevators
SHAHRIAR QUAYYUM
08/20/2026
Special inspection requirement — Lighting in dwelling units
SHAHRIAR QUAYYUM
08/20/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
08/20/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SHAHRIAR QUAYYUM
08/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
08/20/2026
Special inspection requirement — Sprayed fire-resistant materials
SHAHRIAR QUAYYUM
08/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
08/20/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
08/20/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
08/20/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
08/20/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
08/19/2026
Objection resolved — Resolved
08/18/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/13/2026
Objection resolved — Addressed
08/11/2026
Filed — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B01241582-P3
08/03/2026
Filed — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B01241582-S9
07/27/2026
Permit issued — General Construction
B01241582-I1-GC
07/23/2026
Signed off — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B01241582-S1
07/03/2026
Violation issued (ECB, closed)
Unknown
07/03/2026
Violation issued (ECB, closed)
Construction
07/03/2026
Violation issued (ECB, closed)
Unknown
06/25/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01421059-I1
06/25/2026
Permit issued — Sidewalk Shed
B01421059-I1-SH
06/23/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/15/2026
Permit issued — Protection and Mechanical Methods
B01415394-I1-PMM
06/12/2026
Filed — Alteration
Use of Knuckleboom for building construction. This application is filed in conjunction with NB B01241582-I1
B01415394-I1
06/11/2026
Permit issued — Standpipe
B01241582-S6-EW-SP
06/11/2026
Permit issued — Sprinklers
B01241582-S6-EW-SD
06/11/2026
Permit issued — Standpipe
B01241582-S7-EW-SD
06/11/2026
Permit issued — Plumbing
B01241582-S5-PL
06/05/2026
Permit issued — Foundation
B01241582-S2-FO-EA
06/05/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SHAHRIAR QUAYYUM
06/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
06/05/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
06/05/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
06/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
06/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
06/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
06/05/2026
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
06/05/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
06/05/2026
Special inspection requirement — Standpipe Systems
SHAHRIAR QUAYYUM
06/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
06/04/2026
Permit issued — Foundation
B01241582-S2-FO-EA
05/29/2026
Filed — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B01241582-P1
05/29/2026
Filed — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B01241582-P2
05/12/2026
Permit issued — Earth Work
B01241582-S2-FO-EA
05/11/2026
Permit issued — Structural
B01241582-S3-ST
05/11/2026
Permit issued — Mechanical Systems
B01241582-S4-MS
Latest 60 of 85 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EMPIRE MANAGEMENT CONST3909/24/2026
SHEPHERD AND HIGHLAND LLC103/22/2026
EMPIRE MANAGEMENT CONSTRUCTION203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/31/2025$8.5M—WHITE CASTLE SYSTEM INC. → SHEPHERD & HIGHLAND HOLDINGS LLC$1,962/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITING 4 U903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPIRE MANAGEMENT & CON*General Contractor1007/08/2026
F.S. WORKS INCFire Protection307/08/2026
HARTZION ENTERPRISES CORPGeneral Contractor209/23/2026
CREATIVE PLUMBING INPlumbing109/24/2026
M.R. ELEC'L SERVICE LLCElectrical103/22/2026
P.H. WORKS INCPlumbing107/08/2026
POWER DIRECT ELECTRIC INCElectrical103/22/2026
DYNAMIC HOISTING SCAFF INGeneral Contractor108/25/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161108/11/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCREATIVE PLUMBING IN09/23/2026
DOB NOWSidewalk ShedPermit IssuedHARTZION ENTERPRISES CORP09/22/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedDYNAMIC HOISTING SCAFF IN08/24/2026
DOB NOWGeneral ConstructionPermit IssuedEMPIRE MANAGEMENT & CON*07/27/2026
DOB NOWSidewalk ShedPermit IssuedHARTZION ENTERPRISES CORP06/25/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedEMPIRE MANAGEMENT & CON*06/15/2026
DOB NOWStandpipePermit IssuedF.S. WORKS INC06/11/2026
DOB NOWSprinklersPermit IssuedF.S. WORKS INC06/11/2026
DOB NOWStandpipePermit IssuedF.S. WORKS INC06/11/2026
DOB NOWPlumbingPermit IssuedP.H. WORKS INC06/11/2026
DOB NOWFoundationPermit IssuedEMPIRE MANAGEMENT & CON*06/05/2026
DOB NOWFoundationPermit IssuedEMPIRE MANAGEMENT & CON*06/04/2026
DOB NOWEarth WorkPermit IssuedEMPIRE MANAGEMENT & CON*05/12/2026
DOB NOWStructuralPermit IssuedEMPIRE MANAGEMENT & CON*05/11/2026
DOB NOWMechanical SystemsPermit IssuedEMPIRE MANAGEMENT & CON*05/11/2026
DOB NOWSupport of ExcavationSigned-offEMPIRE MANAGEMENT & CON*05/07/2026
DOB NOWConstruction FencePermit IssuedEMPIRE MANAGEMENT & CON*01/26/2026
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/23/2026Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
08/20/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
08/20/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
08/20/2026Protection of exposed foundation insulationSHAHRIAR QUAYYUMenergy_progress
08/20/2026Air barrier continuity plan testingSHAHRIAR QUAYYUMenergy_progress
08/20/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
08/20/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
08/20/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
08/20/2026Exterior lighting powerSHAHRIAR QUAYYUMenergy_progress
08/20/2026Electrical motors and elevatorsSHAHRIAR QUAYYUMenergy_progress
08/20/2026Lighting in dwelling unitsSHAHRIAR QUAYYUMenergy_progress
08/20/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
08/20/2026Exterior Insulation and Finish Systems (EIFS)SHAHRIAR QUAYYUMspecial
08/20/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
08/20/2026Sprayed fire-resistant materialsSHAHRIAR QUAYYUMspecial
08/20/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
08/20/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
08/20/2026MeteringSHAHRIAR QUAYYUMenergy_progress
08/20/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
08/20/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
06/05/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSHAHRIAR QUAYYUMspecial
06/05/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
06/05/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
06/05/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
06/05/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
06/05/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
Latest 25 of 58.
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/21/2026B01241582-P3Request digital key ↗
08/21/2026B01241582-I1Request digital key ↗
08/19/2026B01260252-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits1
▸DOB NOWHPD - Permit Notice1
08/14/2026B01241582-I1Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/16/2026B01241582-P3Open ↗
08/14/2026B01241582-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/16/2026B01241582-P3Open ↗
08/14/2026B01241582-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026B01241582-I1Open ↗
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/16/2026B01241582-S6Open ↗
08/16/2026B01241582-S9Open ↗
08/16/2026B01241582-S8Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/19/2026B01241582-S6Open ↗
09/02/2026B01241582-P1Open ↗
09/02/2026B01241582-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026B01241582-P1Open ↗
09/02/2026B01241582-P1Open ↗
09/01/2026B01241582-S5Open ↗
Showing 3 of 9 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/14/2026B01241582-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/14/2026B01241582-I1—
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/16/2026B01241582-P3Open ↗
08/14/2026B01241582-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026B01241582-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/15/2026B01241582-S2Open ↗
▸DOB NOWSOIL REPORT1
08/15/2026B01241582-S2Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/16/2026B01241582-P3Open ↗
08/14/2026B01241582-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/16/2026B01241582-P3Open ↗
08/14/2026B01241582-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/15/2026B01241582-S2Open ↗
08/14/2026B01241582-S1Open ↗
▸DOB NOWProperty Ownership Certification2
08/16/2026B01241582-P3Open ↗
08/14/2026B01241582-I1Open ↗