← Back
BuildNYC
Miscellaneous garage
3101 CROPSEY AVENUE
BROOKLYN · BIN 3329312
💬 Discuss this project
1932Year Built
2Stories
G9Building Class
M1-2Zoning
—Gross Floor Area
1Units
22 Active Violations ▸FDNY Report ↗
Miscellaneous garage · 0.66 FAR built · Flood zone AE
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3101-03-05 Realty503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Arco Electrical ConstructionElectrical103/21/2026
Building Lifecycle
All (25)Violation (25)
07/24/2014
Closed: Failure to maintain building due to fire
DOB violation · closed on the city's record
05/08/2013
Failure to maintain building due to fire
DOB violation · closed · Issued 2013; DOB's record still lists it as active
02/11/2013
§ 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING LOCKABLE SLIDING BOLT ON DOOR IN THE ENTRANCE LOCATED AT APT 2FL, 2nd STORY
HPD violation · open
02/11/2013
§ 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS & CEILINGS IN THE ENTIRE APARTMENT LOCATED…
HPD violation · open
12/30/2011
Failure to maintain building walls or appurtenances.exterior rear brick wall has 2 crack approx.2" wide on roof parapet.wall allway down to…
ECB violation · closed
03/03/2008
§ 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE ROOM DOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 1, 2nd STORY
HPD violation · open
03/03/2008
§ 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND…
HPD violation · open
03/03/2008
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR IN THE BATHROOM LOCATED AT APT 1, 2nd STORY
HPD violation · open
03/03/2008
§ 27-2026 ADMIN. CODE: REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .. IN THE BATHROOM LOCATED AT…
HPD violation · open
03/03/2008
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR LOCK IN THE ENTRANCE LOCATED AT APT 1, 2nd STORY
HPD violation · open
03/03/2008
HMC ADM CODE: § 27-2018.4 ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 2nd STORY
HPD violation · open
02/26/2004
§ 27-2013 admin. Code: paint with light colored paint to the satisfaction of this department walls and ceilings all rooms throughout 2ND story apt
HPD violation · open
02/26/2004
§ 27-2013 admin. Code: paint with light colored paint to the satisfaction of this department walls and ceilings 1ST to 2ND story public hall
HPD violation · open
02/26/2004
§ 27-2031 admin. Code: provide hot water at all hot water fixtures 2ND story apt
HPD violation · open
02/26/2004
Hmc ADM code: § 27-2018.4 abate the nuisance consisting of vermin mce and roaches at kitchen of 2ND story apt
HPD violation · open
02/26/2004
§ 27-2026 admin. Code: repair the leaky and/or defective water supply pipe under kitchen sink 2ND story apt
HPD violation · open
02/26/2004
§ 27-2013 admin. Code: paint with light colored paint to the satisfaction of this department walls and ceilings all rooms 2ND story apt
HPD violation · open
02/26/2004
§ 27-2005 admin. Code: abate the nuisance consisting of concealed leak at ceiling of 1ST story public hall
HPD violation · open
02/26/2004
§ 27-2026 admin. Code: repair by closing so as to be gas tight all openings in the drain pipe under kitchen sink 2ND story apt
HPD violation · open
02/26/2004
§ 27-2005 admin. Code: properly repair the broken or defective and/or loose hinges entrance door to southeast room 2ND story apt
HPD violation · open
02/26/2004
§ 27-2013 admin. Code: paint with light colored paint to the satisfaction of this department walls and ceilings of 1ST story pulbic hall
HPD violation · open
02/26/2004
§ 27-2005 admin. Code: replace with new the broken or defective handrail at intermediate landing to 2ND story at public hall stairs
HPD violation · open
02/26/2004
§ 27-2013 admin. Code: paint with light colored paint to the satisfaction of this department ceiling of kitchen 2ND story apt
HPD violation · open
02/26/2004
§ 27-2005 admin. Code: properly repair the broken or defective leaky drain pipe of kitchen sink 2ND story apt
HPD violation · open
02/26/2004
§ 27-2026 admin. Code: repair the leaky and/or defective faucets kitchen sink 2ND story apt
HPD violation · open
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—Sunrise Construction—
BIS—N Y Business Fire System—
BIS—A&H Express Plumbing & Heating—
BIS—Jimmy Mazza & Son Construction—
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 12 on file (BIS + DOB NOW)
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
12/19/2013340101856Open ↗
▸BISWORK PERMIT APPLICATION1
05/19/2014340101856Open ↗
▸Seals & Professional Certifications4
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/19/2013340101856Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/19/2013340101856Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/19/2013340101856Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/21/2014340101856Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/19/2013340101856Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/19/2013340101856Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST1
07/21/2014340101856Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/21/2014340101856Open ↗
12/19/2013340101856Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
12/19/2013340101856Open ↗