HPD01/29/2021§ 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT FLOOR1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD01/29/2021§ 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT FLOOR1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD01/29/2021§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1FL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD01/29/2021§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING AND ALL ELECTRICAL OUTLETS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 1FL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD01/29/2021§ 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF HOUSEHOLD ITEMS OBSTRUCTING AT CELLAR AT BOILER ROOM
HPD01/29/2021§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING AND ALL ELECTRICAL OUTLETS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT FLOOR1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD01/29/2021§ 27-2005 ADMIN. CODE: REFIT NORTH DOOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT FLOOR1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD01/29/2021§ 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1FL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
DOB04/21/1995V-DOB VIOLATION - ACTIVE
DOB12/11/1991VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
ECB05/15/1992PARKING, AND/OR STORAGE MOTOR VEHICLES, (3)-REAR YARD AREA NOT A PERMITTED USE IN AN RESIDENTIAL DISTRICT. REMEDY: REMOVE VEHICLES, ANDDISCONTINUE ILLOEGAL USE, FORTHWITH. NOTE:-(1) BLACK MERCEDES,(1)-UNLINothing owed — awaiting certificate of correction
ECB03/04/1992WORK WITHOUT A PERMIT WORK NOTED: PLACING CONCRETE BLOCKS TO CREATE AN EXTENSION OF GARAGES AT REAR SOUTH SIDE OF PREMISES. REMEDY: OBTAIN APPROVALS AND PERMITS, IF FEASABLE, ON REMOVE ALL ILLEGAL CONSTRUCTIONNothing owed — awaiting certificate of correction
ECB03/04/1992WORK WITHOUT A PERMIT. EXTENDING EXISTING FIRE DAMAGED FRAME GARAGE BY ERECTING NEW CONCRETE BLOCK WALLS. WORK BEING DONE WITHOUT A PERMIT. REMEDY: FILE WITH THE DEPT. FOR NEW WORK AND OBTAIN A PERMIT IF FEANothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 3,300 sf lot · 0.8 FAR built · Flood zone X