← Back
Factory, light manufacturing
310A SCHOLES STREET
BROOKLYN · BIN 3071035
💬 Discuss this project
1920Year Built
1Stories
F5Building Class
M1-1Zoning
2,700 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
Factory, light manufacturing · Owner of record: JR 299 MESEROLE LLC · 9,020 sf lot · 0.3 FAR built · Flood zone X
Locations of Work
Architecture
Roof4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHOLOM & ZUCKERBROT REALTY LLC4107/08/2026
NORDEST SERVICE607/08/2026
299 MESEROLE MANAGEMENT203/22/2026
JR 299 MESEROLE403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS1202/26/2026
WRG ENGINEERING, P.C.211/08/2023
H & O ENGINEERING, DPC107/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.1103/21/2026
WRG ENGINEERING P C403/21/2026
GERALD J CALIENDO ARCHITECTS RA203/21/2026
NORTHEAST SERVICE INTERIORS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KING CONSTRUCTION NY, INCGeneral Contractor1607/08/2026
KISHAN PLUMBING INCPlumbing807/08/2026
NORDEST SERVICES LLCGeneral Contractor207/08/2026
ANTHONY DI RUSSOElectrical103/21/2026
T. DIRUSSO ELEC'L CONT INElectrical103/22/2026
NORTHEAST SPECIALIST GROUPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616602/26/2026
WRG ENGINEERING, P.C.4403111/08/2023
Building Lifecycle
All (101)Filed (15)Permit Issued (13)Signed Off (8)Violation (18)Inspection (11)Objection (6)Special Inspection (30)
07/27/2026
Signed off — Alteration
HEREWITH FILED FOR (2) TWO THRU WALL PACKAGED HEATING AND COOLING UNITS AS PER PLANS, NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00462225-I1
07/14/2026
Signed off — Alteration
HEREWITH FILED FOR (2) TWO THRU WALL PACKAGED HEATING AND COOLING UNITS AS PER PLANS, NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00462225-S2
05/20/2026
Signed off — Alteration
HEREWITH FILED FOR (2) TWO THRU WALL PACKAGED HEATING AND COOLING UNITS AS PER PLANS, NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00462225-S6
05/20/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
05/20/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
05/20/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
05/20/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
05/20/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
05/20/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
05/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
05/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/20/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
05/20/2026
Special inspection requirement — Subgrade Inspections
FAHAD FATEH
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/20/2026
Special inspection requirement — Masonry
FAHAD FATEH
05/06/2026
Objection resolved — Addressed
03/11/2026
Objection raised — Other
02/26/2026
Filed — Alteration
HEREWITH FILED FOR (2) TWO THRU WALL PACKAGED HEATING AND COOLING UNITS AS PER PLANS, NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00462225-P8
01/15/2026
Signed off — Alteration
HEREWITH FILED FOR (2) TWO THRU WALL PACKAGED HEATING AND COOLING UNITS AS PER PLANS, NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00462225-S1
01/15/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/13/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/18/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/08/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
12/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/08/2025
Special inspection requirement — Masonry
FAHAD FATEH
12/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
12/08/2025
Special inspection requirement — Subgrade Inspections
FAHAD FATEH
12/08/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
12/08/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
12/08/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
12/08/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
12/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
12/08/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
12/08/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
11/25/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
11/19/2025
Signed off — Alteration
HEREWITH FILED FOR (2) TWO THRU WALL PACKAGED HEATING AND COOLING UNITS AS PER PLANS, NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00462225-S5
11/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/06/2025
Signed off — Alteration
B00550586-I1
10/30/2025
Signed off — Alteration
HEREWITH FILED FOR (2) TWO THRU WALL PACKAGED HEATING AND COOLING UNITS AS PER PLANS, NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00462225-S4
10/29/2025
Signed off — Alteration
HEREWITH FILED FOR (2) TWO THRU WALL PACKAGED HEATING AND COOLING UNITS AS PER PLANS, NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00462225-S3
10/29/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
10/29/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
FAHAD FATEH
10/27/2025
Filed — Alteration
HEREWITH FILED FOR (2) TWO THRU WALL PACKAGED HEATING AND COOLING UNITS AS PER PLANS, NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00462225-P6
06/02/2025
Permit issued — Mechanical Systems
B00462225-S5-MS
05/30/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/19/2025
Permit issued — Curb Cut
B00462225-S6-CC
01/22/2025
Filed — Alteration
HEREWITH FILED FOR (2) TWO THRU WALL PACKAGED HEATING AND COOLING UNITS AS PER PLANS, NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00462225-S6
12/10/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
FAHAD FATEH
12/10/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
10/25/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/25/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/09/2024
Permit issued — Plumbing
B00462225-S2-PL
08/30/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/23/2024
Permit issued — Construction Fence
B00462225-S3-FN
08/23/2024
Permit issued — General Construction
B00462225-I1-GC
08/23/2024
Permit issued — Structural
B00462225-S4-ST
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offKING CONSTRUCTION NY, INC06/02/2025
DOB NOWCurb CutSigned-offKING CONSTRUCTION NY, INC05/19/2025
DOB NOWPlumbingSigned-offN AND S PLUMBING INC10/09/2024
DOB NOWConstruction FenceSigned-offKING CONSTRUCTION NY, INC08/23/2024
DOB NOWGeneral ConstructionSigned-offKING CONSTRUCTION NY, INC08/23/2024
DOB NOWStructuralSigned-offKING CONSTRUCTION NY, INC08/23/2024
DOB NOWStructuralSigned-offKING CONSTRUCTION NY, INC05/13/2024
DOB NOWGeneral ConstructionSigned-offKING CONSTRUCTION NY, INC05/10/2024
DOB NOWConstruction FenceSigned-offKING CONSTRUCTION NY, INC05/10/2024
DOB NOWCurb CutSigned-offKING CONSTRUCTION NY, INC05/09/2024
DOB NOWConstruction FenceSigned-offNORTHEAST SPECIALIST GROUP09/30/2021
DOB NOWConstruction FenceSigned-offNORDEST SERVICES LLC08/30/2021
DOB NOWConstruction FenceSigned-offNORDEST SERVICES LLC07/06/2021
BISMHISSUEDAGEE HEATING SERVICE CORP10/30/1997
BISBLRE-ISSUEDAGEE HEATING SVC CORP10/29/1997
BISMHISSUEDGOOD-WILL MECHANICAL CORP.07/11/1997
BISPLISSUEDADUADUCT PLMB & HEATING01/18/1991
1 project · most recent 02/26/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/26/2026Signed-offKING CONSTRUCTION NY, INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Friedrich Kühl + (Electric Heat) KEL36A35A 35,000 BTU · Ptac ×2
Ventilation
Panasonic WhisperCeiling DC 150 CFM Ceiling Ventilation Fan, FV-1115VQ1 150 CFM · Exhaust Fan ×1
2 projects · most recent 07/22/2026
General Wiring
FiledStatusContractorScope
07/22/2026CompleteT. DIRUSSO ELEC'L CONT INGeneral Wiring
01/08/2026CompleteT. DIRUSSO ELEC'L CONT INGeneral Wiring
1 project · most recent 02/26/2026
Steel Concrete Masonry
FiledStatusContractorScope
02/26/2026Signed-offKING CONSTRUCTION NY, INCSteel, Concrete, Masonry
1 project · most recent 02/26/2026
Fence
FiledStatusContractorScope
02/26/2026Signed-offKING CONSTRUCTION NY, INCFence
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
01/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/13/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
12/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/25/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
11/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/30/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/25/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/25/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/30/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/30/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
05/20/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
05/20/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
05/20/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
05/20/2026Fenestration areasFAHAD FATEHenergy_progress
05/20/2026Interior lighting powerFAHAD FATEHenergy_progress
05/20/2026Fenestration air leakageFAHAD FATEHenergy_progress
05/20/2026HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/20/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
05/20/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
05/20/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
05/20/2026Subgrade InspectionsFAHAD FATEHspecial
05/20/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/20/2026MasonryFAHAD FATEHspecial
12/08/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
12/08/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/08/2025MasonryFAHAD FATEHspecial
12/08/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
12/08/2025Subgrade InspectionsFAHAD FATEHspecial
12/08/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
12/08/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
12/08/2025Fenestration air leakageFAHAD FATEHenergy_progress
12/08/2025Fenestration areasFAHAD FATEHenergy_progress
12/08/2025Interior lighting powerFAHAD FATEHenergy_progress
12/08/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
12/08/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
Latest 25 of 55.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch12
09/01/2026B00550586-I1Request digital key ↗
08/26/2026B00462225-P5Request digital key ↗
08/26/2026B00462225-S5Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
08/26/2026B00462225-I1Request digital key ↗
08/26/2026B00462225-P8Request digital key ↗
08/15/2026B00462225-P1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION9
02/20/2026322035944Open ↗
01/27/2026322088548Open ↗
01/15/2026322035944Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION1
06/10/2021322088548Open ↗
▸Seals & Professional Certifications35
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/26/2026B00462225-S5Open ↗
08/26/2026B00462225-P4Open ↗
08/26/2026B00462225-P3Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/25/2026B00462225-S2Open ↗
09/19/2026B00462225-P6Open ↗
08/30/2026B00462225-S5Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/30/2026B00462225-S5Open ↗
08/27/2026B00462225-I1Open ↗
08/27/2026B00462225-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/22/2016321406448Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/22/2016321406448Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/22/2016321406448Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
08/18/2021322035944Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026B00462225-S5Open ↗
08/26/2026B00462225-S4Open ↗
08/26/2026B00462225-P5Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/22/2016321406448Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/22/2016321406448Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/26/2026B00462225-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/08/2023322035944Open ↗
▸Approvals, Objections & Sign-offs5
▸BISSCHEDULE A - OCCUPANCY / USE5
02/20/2026322035944Open ↗
01/15/2026322035944Open ↗
01/13/2026322035944Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/18/2021322035944Open ↗
07/22/2016321406448Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET3
02/24/2021322035944Open ↗
10/08/2020322088548Open ↗
07/22/2016321406448Open ↗
▸BISADDITIONAL INFORMATION2
08/18/2021322035944Open ↗
08/18/2021322035944Open ↗
▸Other Documents1
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00462225-S4Open ↗