← Back
Elevator apt, semi-fireproof with stores
311 11TH AVENUE
MANHATTAN · BIN 1091671
💬 Discuss this project
2020Year Built
60Stories
D7Building Class
C6-4XZoning
904,524 sfGross Floor Area
940Units
LL97 CoveredRent Stabilized0 Open Violations
Elevator apt, semi-fireproof with stores · Owner of record: WEST SIDE 11TH & 29TH LLC · 49,375 sf lot · 18.32 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof2p · 1 filing · 18 docs
Bulkhead4p · 1 filing · 9 docs
Floor 601p · 1 filing · 18 docs
Floor 592p · 1 filing · 9 docs
Floor 581p · 1 filing · 9 docs
Floor 57
Floor 56
Floor 55
Floor 54
Floor 53
Floor 52
Floor 51
Floor 50
Floor 49
Floor 48
Floor 47
Floor 46
Floor 45
Floor 44
Floor 43
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 91p · 1 filing · 9 docs
Floor 8
Floor 7
Floor 62p · 2 filings · 15 docs
Floor 51p · 1 filing · 9 docs
Floor 4
Floor 3
Floor 21p · 1 filing · 18 docs
Floor 111p · 4 filings · 20 docs
Mezzanine2p · 1 filing · 9 docs
Cellar16p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1065 ATLANTIC AVENUE5507/08/2026
DOUGLASTON DEVELOPMENT1607/08/2026
DD WEST 29TH LLC C O DOUGLASTO2407/08/2026
OWNERS REP1107/08/2026
DD WEST 29TH3003/22/2026
BARONE STEEL INC503/22/2026
WEST SIDE 11TH 29TH603/22/2026
JE LEVINE BUILDERS1003/22/2026
HIGHRIS SAFETY SYSTEMS103/22/2026
LEVINE BUILDERS403/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KUSHNER STUDIOS303/21/2026
JAM CONSULTANTS, INC.4003/21/2026
LOMBARDO BUILDING CONSULTANTS203/21/2026
AE DESIGN SOLUTION803/21/2026
INDESIGN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor1607/08/2026
DWAIKAT DECOR CORPGeneral Contractor1207/08/2026
J.E. LEVINE BUILDER INCGeneral Contractor707/08/2026
RAEL AUTOMATIC SPR.CO INCFire Protection507/08/2026
CENTRAL FIVE HOME IMPROVEGeneral Contractor207/08/2026
NEPTUNE SIGNS AWNINGSScaffold207/08/2026
KATAN P & H INCPlumbing207/08/2026
BARONE STEEL INCGeneral Contractor203/21/2026
DEZIER AIR LLCGeneral Contractor104/09/2026
MO CONTRACTING INCFire Protection107/08/2026
AMERICAN CAR LIFT SERVICEGeneral Contractor104/09/2026
DIFAZIO ELECTRIC NY, INCElectrical103/22/2026
BROOK PLUMBING & HTG CORPPlumbing107/08/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DELTA TESTING LABS687312/23/2025
YOU GAO9407108/26/2025
ATLAS ATC ENGINEERING INC8011105/06/2025
ARCHITECTURAL ENGINEERING6111301/14/2025
ENGINEERING CONSULTING SE2050505/29/2024
KENDALL ENGINEERING PC4154302/24/2022
AR-TECH ENGINEERING, P.C.6659207/14/2021
Building Lifecycle
All (226)Filed (34)Permit Issued (33)Signed Off (20)Violation (49)Inspection (12)Objection (48)Special Inspection (30)
04/16/2026
Violation issued (HPD, closed)
B
03/30/2026
Signed off — Alteration
Filing for modification to sprinkler system for additional sprinklers heads and relocation of standpipe fire hose valve for parking stackers in conjunction with new building# 121188918.
M01338550-I1
03/09/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/09/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
03/04/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/04/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
02/24/2026
Violation issued (HPD, closed)
A
02/24/2026
Violation issued (HPD, closed)
A
01/14/2026
Permit issued — Standpipe
M01338550-I1-EW-SD
01/14/2026
Permit issued — Standpipe
M01338550-I1-EW-SP
12/23/2025
Filed — Alteration
Filing for modification to sprinkler system for additional sprinklers heads and relocation of standpipe fire hose valve for parking stackers in conjunction with new building# 121188918.
M01338550-I1
12/22/2025
Special inspection requirement — Standpipe Systems
RICHARD GREENWALD
12/22/2025
Special inspection requirement — Sprinkler Systems
RICHARD GREENWALD
12/17/2025
Signed off — Alteration
INSTALLATION OF CAR LIFTS AS PER PLANS
M01200363-I1
11/26/2025
Signed off — Alteration
Interior renovation including partitions, finishes, and equipment in existing vacant retail space. No change in use, floor area, egress, or bulk under this application.
M01113266-I1
11/26/2025
Signed off — Alteration
M01157203-I1
11/26/2025
Signed off — Alteration
Provide grease trap for 2-compartment sink. All plumbing piping running in landlord cellar, and to be coordinated with landlord in field. Install new plumbing fixtures and equipment as shown.
M01113267-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/05/2025
Signed off — Alteration
M01274590-I1
09/24/2025
Permit issued — General Construction
M01113266-I1-GC
08/28/2025
Permit issued — Sign
M01274590-I1-SG
08/26/2025
Filed — Alteration
M01274590-I1
08/25/2025
Permit issued — Structural
M01200363-I1-GC-CX
07/30/2025
Signed off — Alteration
Filing for 30.00' Curb-cut including splays. Curb-cut located on 29th street (212.5 from 11th Ave. and nearest Corner) Application filed in conjunction with New Building #: 121188918..
M00124276-I1
07/25/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/12/2025
Permit issued — Plumbing
M01113267-I1-PL
05/22/2025
Permit issued — General Construction
M01113266-I1-GC
05/12/2025
Permit issued — Mechanical Systems
M01157203-I1-MS
05/06/2025
Filed — Alteration
INSTALLATION OF CAR LIFTS AS PER PLANS
M01200363-I1
03/13/2025
Signed off — Alteration
Filing for Temporary Construction Fence associated with the construction of a 59 story new building. Filed in conjunction with NB#: 121188918.
M00167940-I1
02/11/2025
Objection raised — Accessibility
02/11/2025
Objection resolved — Addressed
01/27/2025
Objection raised — Scope
01/27/2025
Objection resolved — Addressed
01/14/2025
Filed — Alteration
Interior renovation including partitions, finishes, and equipment in existing vacant retail space. No change in use, floor area, egress, or bulk under this application.
M01113266-I1
01/14/2025
Filed — Alteration
M01157203-I1
01/14/2025
Filed — Alteration
Provide grease trap for 2-compartment sink. All plumbing piping running in landlord cellar, and to be coordinated with landlord in field. Install new plumbing fixtures and equipment as shown.
M01113267-I1
01/14/2025
Special inspection requirement — Duct leakage testing, insulation and design
William Shoard
01/14/2025
Special inspection requirement — Energy Code Compliance Inspections
William Shoard
01/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
William Shoard
01/14/2025
Special inspection requirement — Maintenance information
William Shoard
01/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
William Shoard
01/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
William Shoard
01/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
William Shoard
12/17/2024
Special inspection requirement — Final
William Shoard
12/17/2024
Special inspection requirement — Mechanical Systems
William Shoard
09/20/2024
Signed off — Alteration
M00970941-I1
09/18/2024
Special inspection requirement — Final
William Shoard
09/17/2024
Signed off — Alteration
Herewith filing retail for heavenly market tenant fit-out for plumbing modifications as per plans on 1st floor and cellar. No change in use, egress or occupancy.
M00857520-I1
09/16/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
08/16/2024
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
08/15/2024
Filed — Alteration
Herewith filing retail for heavenly market tenant fit-out for plumbing modifications as per plans on 1st floor and cellar. No change in use, egress or occupancy.
M00857520-P5
08/14/2024
Signed off — Alteration
Herewith filing retail for heavenly market tenant fit-out for general construction modifications as per plans. No change in use, egress or occupancy.
M00857443-I1
08/13/2024
Filed — Alteration
Herewith filing retail for heavenly market tenant fit-out for plumbing modifications as per plans on 1st floor and cellar. No change in use, egress or occupancy.
M00857520-P4
07/26/2024
Permit issued — Plumbing
M00857520-I1-PL
Latest 60 of 226 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offRAEL AUTOMATIC SPR.CO INC01/14/2026
DOB NOWStandpipeSigned-offRAEL AUTOMATIC SPR.CO INC01/14/2026
DOB NOWGeneral ConstructionSigned-offCENTRAL FIVE HOME IMPROVE09/24/2025
DOB NOWSignSigned-offDESTHERS, JOSEPH08/28/2025
DOB NOWStructuralSigned-offAMERICAN CAR LIFT SERVICE08/25/2025
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC06/12/2025
DOB NOWGeneral ConstructionSigned-offCENTRAL FIVE HOME IMPROVE05/22/2025
DOB NOWMechanical SystemsSigned-offDEZIER AIR LLC05/12/2025
DOB NOWPlumbingSigned-offKATAN P & H INC07/26/2024
DOB NOWGeneral ConstructionSigned-offDWAIKAT DECOR CORP01/26/2024
DOB NOWConstruction FenceSigned-offDWAIKAT DECOR CORP01/26/2024
DOB NOWMechanical SystemsSigned-offDWAIKAT DECOR CORP01/26/2024
DOB NOWSignSigned-offDESTHERS, JOSEPH12/20/2023
DOB NOWConstruction FenceSigned-offDWAIKAT DECOR CORP11/08/2023
DOB NOWStandpipeSigned-offRAEL AUTOMATIC SPR.CO INC08/08/2023
DOB NOWMechanical SystemsSigned-offDWAIKAT DECOR CORP06/13/2023
DOB NOWGeneral ConstructionSigned-offDWAIKAT DECOR CORP06/10/2023
DOB NOWPlumbingSigned-offKATAN P & H INC06/09/2023
DOB NOWSprinklersSigned-offMO CONTRACTING INC06/09/2023
DOB NOWCurb CutSigned-offJ.E. LEVINE BUILDER INC11/14/2022
DOB NOWConstruction FenceSigned-offJ.E. LEVINE BUILDER INC10/24/2022
DOB NOWStandpipeSigned-offRAEL AUTOMATIC SPR.CO INC08/10/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC07/14/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/06/2022
DOB NOWConstruction FenceSigned-offJ.E. LEVINE BUILDER INC06/09/2022
DOB NOWBoiler EquipmentSigned-offBROOK PLUMBING & HTG CORP11/19/2021
DOB NOWStandpipeSigned-offRAEL AUTOMATIC SPR.CO INC08/10/2021
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC07/16/2021
DOB NOWConstruction FenceSigned-offJ.E. LEVINE BUILDER INC07/08/2021
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/01/2021
DOB NOWProtection and Mechanical MethodsSigned-offBARONE STEEL06/22/2021
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC07/14/2020
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC08/16/2019
BISSDISSUEDRAEL AUTOMATIC SPR.CO INC08/08/2023
BISEQISSUEDECKER WINDOW CORP07/11/2023
BISEQISSUEDECKER WINDOW CORP07/11/2023
BISEQISSUEDECKER WINDOW CORP07/11/2023
BIS—ISSUEDJ.E. LEVINE BUILDER INC12/12/2022
BISEQISSUEDUNIVERSAL BUILD SUPP LLC11/21/2022
BISEQISSUEDECKER WINDOW CORP10/14/2022
+ 43 more permits on file
21 projects · most recent 05/19/2026
General Wiring
FiledStatusContractorScope
05/19/2026CompleteREDGRAVE ELECTL MAINTNCEGeneral Wiring
02/24/2026CompleteAURORA ELECL CONTG INC—
10/06/2025CompleteASKO ELEC CONST & MAIN IN—
11/26/2024CompleteRELIANT ELEC'L CONT'G INCGeneral Wiring
06/27/2024CompleteACCURATE ELEC'L CORP.General Wiring
03/26/2024Permit IssuedS. J. ELECTRIC INC.915 meters, 915 new_meters
01/07/2024CompleteASKO ELEC CONST & MAIN IN—
05/21/2020CompleteDIFAZIO ELECTRIC NY, INCGeneral Wiring
05/21/2020CompleteDIFAZIO ELECTRIC NY, INCGeneral Wiring
05/21/2020CompleteDIFAZIO ELECTRIC NY, INCGeneral Wiring
05/21/2020CompleteDIFAZIO ELECTRIC NY, INCGeneral Wiring
05/21/2020CompleteDIFAZIO ELECTRIC NY, INCGeneral Wiring
05/21/2020CompleteDIFAZIO ELECTRIC NY, INCGeneral Wiring
05/05/2020CompleteS. J. ELECTRIC INC.1 meters, 1 new_meters
04/30/2020CompleteS. J. ELECTRIC INC.—
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
03/09/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/09/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/04/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/25/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
09/16/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
02/02/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/10/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
11/21/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/24/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
12/22/2025Standpipe SystemsRICHARD GREENWALDspecial
12/22/2025Sprinkler SystemsRICHARD GREENWALDspecial
01/14/2025Duct leakage testing, insulation and designWilliam Shoardenergy_progress
01/14/2025Energy Code Compliance InspectionsWilliam Shoardprogress
01/14/2025HVAC-R and service water piping design and insulationWilliam Shoardenergy_progress
01/14/2025Maintenance informationWilliam Shoardenergy_progress
01/13/2025Tenant Protection Plan ComplianceWilliam Shoardspecial
01/13/2025Tenant Protection Plan ComplianceWilliam Shoardspecial
01/13/2025Tenant Protection Plan ComplianceWilliam Shoardspecial
12/17/2024FinalWilliam Shoardprogress
12/17/2024Mechanical SystemsWilliam Shoardspecial
09/18/2024FinalWilliam Shoardprogress
08/16/2024Energy Code Compliance InspectionsPAUL MARINOprogress
06/26/2024Energy Code Compliance InspectionsPAUL MARINOprogress
04/05/2024Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
04/05/2024Fire-Resistant Penetrations and JointsPAUL MARINOspecial
04/05/2024Energy Code Compliance InspectionsPAUL MARINOprogress
04/05/2024FinalHany Demetryprogress
12/21/2023Energy Code Compliance InspectionsPAUL MARINOprogress
11/17/2022Public Assembly Emergency LightingRICHARD GREENWALDprogress
11/07/2022Public Assembly Emergency LightingRICHARD GREENWALDprogress
02/26/2022Heating SystemsKEVIN KENDALLspecial
02/26/2022HVAC-R and service water heating system controlsKEVIN KENDALLenergy_progress
02/26/2022HVAC-R and service water heating equipmentKEVIN KENDALLenergy_progress
02/26/2022Maintenance informationKEVIN KENDALLenergy_progress
Latest 25 of 40.
▾Documents — 1,038 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch24
09/03/2026M00529668-I1Request digital key ↗
09/03/2026M00532147-P1Request digital key ↗
09/02/2026M00592159-P2Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
09/03/2026M00646936-P2Request digital key ↗
09/03/2026M00646957-I1Request digital key ↗
08/15/2026M00646936-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe2
09/05/2026M00228710-I1Request digital key ↗
08/15/2026M00228710-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/05/2026M00124331-I1Request digital key ↗
09/05/2026M00167940-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/02/2026M00201772-I1Request digital key ↗
09/02/2026M00201772-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/15/2026M00124276-I1Request digital key ↗
▸Applications & Permits223
▸BISPLAN / WORK APPROVAL APPLICATION159
09/29/2025121188918Open ↗
09/17/2025140826337Open ↗
07/24/2024121188918Open ↗
Showing 3 of 159 on file for this type
▸BISWORK PERMIT APPLICATION59
07/11/2023140973267Open ↗
07/11/2023140973285Open ↗
07/11/2023140973249Open ↗
Showing 3 of 59 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLACE OF ASSEMBLY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records15
▸BISFLOOD ZONE COMPLIANCE4
02/01/2024141019261Open ↗
01/29/2024141008745Open ↗
10/25/2023140851512Open ↗
Showing 3 of 4 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION3
03/22/2024123918993Open ↗
Showing 1 of 3 on file for this type
▸BISFLOOD ZONE DESIGN CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT3
03/22/2024123918993Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWFlood Zone Design Certification1
08/15/2026M00124276-I1Open ↗
▸DOB NOWFlood Zone Compliance1
08/15/2026M00124276-I1Open ↗
▸Seals & Professional Certifications154
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 34 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature34
09/05/2026M00124276-I1Open ↗
09/03/2026M00529668-I1Open ↗
09/03/2026M00532147-I1Open ↗
Showing 3 of 34 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/24/2026M01157203-I1Open ↗
09/23/2026M01338550-I1Open ↗
09/23/2026M01338550-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/24/2026M01157203-I1Open ↗
09/24/2026M01157203-I1Open ↗
09/21/2026M01113266-I1Open ↗
Showing 3 of 14 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment85
▸BISEQUIPMENT USE PERMITS42
11/01/2023121188918Open ↗
11/01/2023121188918Open ↗
11/01/2023121188918Open ↗
Showing 3 of 42 on file for this type
▸BISSCHEDULE B - PLUMBING24
08/18/2023121188918Open ↗
Showing 1 of 24 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT12
11/01/2023121188918Open ↗
11/01/2023121188918Open ↗
11/01/2023121188918Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00201772-P1Open ↗
08/13/2026M00201772-I1Open ↗
▸Environmental & Asbestos59
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION13
02/10/2025140826337Open ↗
01/29/2024141008745Open ↗
01/25/2024141019261Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWOER: Notice to Proceed12
08/27/2026M00857443-I1Open ↗
08/13/2026M01157203-I1Open ↗
08/13/2026M01113266-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
08/13/2026M01113267-I1Open ↗
08/13/2026M00857443-I1Open ↗
08/13/2026M00592159-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS-CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026M01113267-I1Open ↗
08/13/2026M01113266-I1Open ↗
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY12
08/22/2022121188918Open ↗
08/18/2022121188918Open ↗
Showing 2 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
02/05/2024141019261Open ↗
06/29/2023121188918Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00592159-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00592159-I1Open ↗
▸Inspections & Test Reports104
▸BISTECHNICAL REPORT: RESPONSIBILITY55
08/31/2023141005132Open ↗
02/14/2023123727315Open ↗
02/13/2023123727315Open ↗
Showing 3 of 55 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Approvals, Objections & Sign-offs89
▸BISSCHEDULE A - OCCUPANCY / USE30
09/29/2025121188918Open ↗
07/24/2024121188918Open ↗
07/17/2024121188918Open ↗
Showing 3 of 30 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION16
03/16/2023121188918Open ↗
12/13/2022121188918Open ↗
Showing 2 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
02/06/2024141019261Open ↗
01/29/2024141008745Open ↗
11/17/2023140851512Open ↗
Showing 3 of 15 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSUPERSEDING LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFINAL5
01/29/2024141008745Open ↗
07/14/2023140973114Open ↗
07/12/2023140973249Open ↗
Showing 3 of 5 on file for this type
▸BISCCD1-Construction Code Determination3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBSA/CPC APPROVAL2
03/22/2024123918993Open ↗
Showing 1 of 2 on file for this type
▸BISTRANSIT AUTHORITY APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership44
▸BISCOST AFFIDAVIT24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW36
02/01/2024141019261Open ↗
01/29/2024141008745Open ↗
08/31/2023141005132Open ↗
Showing 3 of 6 on file for this type
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Filing & Intake Forms107
▸BISADDITIONAL INFORMATION62
12/17/2025121188918Open ↗
07/25/2024121188918Open ↗
03/22/2024123918993Open ↗
Showing 3 of 62 on file for this type
▸BISEFILING COVER SHEET24
11/21/2023123918993Open ↗
Showing 1 of 24 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISBOROUGH INTAKE FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸Other Documents13
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type