Two family frame
311 BARTLETT AVENUE
STATEN ISLAND · Great Kills-Eltingville · BIN 5127644
💬 Discuss this project
1997Year Built
2Stories
B2Building Class
R3AZoning
2,200 sfGross Floor Area
2Units
Two family frame · 4,200 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
Electrical
Roof4p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC106/24/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272106/24/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
07/06/2026
Permit issued — Solar
S01421977-I1-SL
06/24/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01421977-I1
06/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
06/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
06/24/2026
Special inspection requirement — Final
Walid Abdulla
06/24/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC07/06/2026
BIS—ISSUEDP.C.M. ENTERPRISES LTD.06/27/1997
1 project · most recent 06/24/2026
FiledStatusContractorScope
06/24/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 06/24/2026
FiledStatusContractorScope
06/24/2026Signed-offSUNRUN INSTALLATION SVC27 panels, 12.15 kw, 568 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/24/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
06/24/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
06/24/2026Energy Code Compliance InspectionsWalid Abdullaprogress
06/24/2026FinalWalid Abdullaprogress
06/24/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026S01421977-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/22/2026S01421977-I1Open ↗
08/22/2026S01421977-I1Open ↗
08/22/2026S01421977-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/22/2026S01421977-I1Open ↗
08/22/2026S01421977-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026S01421977-I1Open ↗