← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Pel Park Realty
311 BEDFORD PARK BOULEVARD · BIN 2016747
💬 Discuss this project
1937Year Built
6Stories
D1Building Class
R7AZoning
63,564 sfGross Floor Area
51Units
LL97 CoveredRent Stabilized72 Active Violations 69 unresolved · 3 paperwork only 1 likely answered 2 old, status unconfirmed ▸
Elevator apt, semi-fireproof without stores · Owner of record: Pel Park Partners · 14,490 sf lot · 4.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPel Park Partners, LLCUnder Construction1p · 1 filing · 3 docs
Floor 1Installation of Heavy Duty Sidewalk ShedUnder Construction6p · 2 filings · 5 docs
Site & exteriorPel Park Partners, LLCUnder Construction11p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Rockford Associates209/13/2026
Pel Park Partners203/22/2026
Eagle Empire Contracting103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jose M. Landauro, P.E108/04/2026
McHenery Testing Lab206/24/2026
Syed Engineering110/21/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Alpha Group NY1Scaffold309/30/2026
Topline NYC ContractingScaffold303/21/2026
Z Tech Building SolutionsGeneral Contractor108/26/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bangash Associates8488108/04/2026
Jose M. Landauro3500108/04/2026
Building Lifecycle
All (75)Filed (4)Permit Issued (5)Violation (60)Special Inspection (6)
10/01/2026
Violation issued (ECB, open)
Construction
09/29/2026
Permit issued — Sidewalk Shed
X01375666-I1-SH
09/09/2026
Violation issued (ECB, open)
Construction
08/25/2026
Permit issued — General Construction
X01429081-I1-GC
08/04/2026
Filed — Alteration
Filing for facade repairs work that includes replacement of masonry parapet wall(s), replacement of cracked brickwork, replacement of steel lintels, repair of eroded mortar joints, and miscellaneous masonry repairs throughout facades,
X01429081-I1
07/19/2026
Violation issued (HPD, open)
A
07/19/2026
Violation issued (HPD, open)
C
07/19/2026
Violation issued (HPD, open)
A
07/19/2026
Violation issued (HPD, open)
C
07/19/2026
Violation issued (HPD, open)
C
07/19/2026
Violation issued (HPD, open)
C
07/10/2026
Special inspection requirement — Masonry
JOSE LANDAURO
07/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSE LANDAURO
07/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/10/2026
Special inspection requirement — Final
JOSE LANDAURO
07/10/2026
Special inspection requirement — Energy Code Compliance Inspections
JOSE LANDAURO
07/10/2026
Special inspection requirement — Air barrier - visual inspection
JOSE LANDAURO
07/06/2026
Violation issued (HPD, open)
B
07/04/2026
Violation issued (HPD, open)
B
06/24/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01421900-I1
06/24/2026
Permit issued — Supported Scaffold
X01421900-I1-SF
06/24/2026
Violation issued (HPD, open)
C
06/22/2026
Permit issued — Sidewalk Shed
X01375666-I1-SH
06/12/2026
Violation issued (ECB, open)
Construction
06/12/2026
Violation issued (ECB, open)
Plumbing
06/11/2026
Violation issued (HPD, open)
C
06/10/2026
Violation issued (HPD, open)
B
06/10/2026
Violation issued (HPD, open)
B
05/24/2026
Violation issued (HPD, open)
C
05/04/2026
Violation issued (HPD, closed)
C
05/04/2026
Violation issued (HPD, open)
C
04/29/2026
Violation issued (HPD, closed)
A
04/21/2026
Violation issued (HPD, closed)
B
04/21/2026
Violation issued (HPD, closed)
B
04/21/2026
Violation issued (HPD, closed)
B
04/17/2026
Violation issued (HPD, closed)
C
04/17/2026
Violation issued (HPD, closed)
A
04/17/2026
Violation issued (HPD, closed)
B
04/17/2026
Violation issued (HPD, open)
A
04/15/2026
Violation issued (HPD, closed)
C
03/30/2026
Violation issued (HPD, closed)
B
03/30/2026
Violation issued (HPD, closed)
B
03/27/2026
Violation issued (HPD, closed)
B
03/27/2026
Violation issued (HPD, closed)
C
03/27/2026
Violation issued (HPD, closed)
B
03/26/2026
Violation issued (HPD, closed)
B
03/23/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01375666-I1
03/22/2026
Violation issued (HPD, closed)
C
03/13/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/13/2026
Violation issued (ECB, open)
Construction
02/26/2026
Violation issued (HPD, open)
A
02/26/2026
Violation issued (HPD, closed)
A
02/24/2026
Violation issued (HPD, closed)
B
02/24/2026
Violation issued (HPD, closed)
C
02/24/2026
Violation issued (HPD, closed)
B
02/24/2026
Violation issued (HPD, closed)
C
02/24/2026
Violation issued (HPD, closed)
B
02/24/2026
Violation issued (HPD, open)
C
02/24/2026
Violation issued (HPD, open)
C
02/24/2026
Violation issued (HPD, closed)
B
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedAlpha Group NY109/29/2026
DOB NOWGeneral ConstructionPermit IssuedZ Tech Building Solutions08/25/2026
DOB NOWSupported ScaffoldPermit IssuedAlpha Group NY106/24/2026
DOB NOWSidewalk ShedPermit IssuedAlpha Group NY106/22/2026
DOB NOWSidewalk ShedPermit IssuedTopline NYC Contracting10/23/2019
BISOTISSUEDEagle Empire Contracting11/14/2019
BISFBISSUEDAmbassador Fuel Oil Company09/28/1992
6 projects · most recent 03/30/2026
General Wiring
FiledStatusContractorScope
03/30/2026CompleteUS1 ElectricGeneral Wiring
03/23/2026Permit IssuedRichard Neu—
03/18/2026CompleteUS1 ElectricGeneral Wiring
11/13/2019CompleteJoseph Weinstein ElectricGeneral Wiring
10/18/2019Permit IssuedRichard Neu—
08/13/2019Complete247 Electrical—
3 projects · most recent 06/24/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
06/24/2026Permit IssuedAlpha Group NY1Scaffold
03/23/2026Permit IssuedAlpha Group NY1Sidewalk Shed
10/21/2019Permit IssuedTopline NYC ContractingSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
07/10/2026MasonryJOSE LANDAUROspecial
07/10/2026Structural Stability – Alterations of existing buildingsJOSE LANDAUROspecial
07/10/2026Tenant Protection Plan Compliance—special
07/10/2026FinalJOSE LANDAUROprogress
07/10/2026Energy Code Compliance InspectionsJOSE LANDAUROprogress
07/10/2026Air barrier - visual inspectionJOSE LANDAUROenergy_progress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/17/2026X01375666-I1Request digital key ↗
08/16/2026X01421900-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00248867-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
11/14/2019220720067Open ↗
▸BISWORK PERMIT APPLICATION1
11/14/2019220720067Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026X00248867-I1Open ↗
08/17/2026X01375666-I1Open ↗
08/16/2026X01421900-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026X01429081-I1Open ↗
08/24/2026X01429081-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/14/2019220720067Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/14/2019220720067Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/14/2019220720067Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026X01429081-I1Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
11/14/2019220720067Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026X00248867-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/14/2019220720067Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/14/2019220720067Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
11/15/2019220720067Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
11/14/2019220720067Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
11/14/2019220720067Open ↗