Two stories - detached, small or mid-size
311 ELMWOOD AVENUE
BROOKLYN · Flatbush (West)-Ditmas Park-Parkville · BIN 3170351
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3-1Zoning
1,304 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 3,220 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneralOther
Roof32p · 1 filing · 20 docs
Attic8p · 1 filing · 20 docs
Floor 516p · 1 filing · 20 docs
Floor 416p · 1 filing · 20 docs
Floor 316p · 1 filing · 20 docs
Floor 241p · 1 filing · 20 docs
Floor 144p · 1 filing · 20 docs
Cellar41p · 1 filing · 20 docs
Site & exterior54p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CEDARS CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/12/2021$1.1M—311 ELMWOOD LLC → Private party$844/sf building
08/31/2016$750K—— → —$575/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
REAL ENGINEERING INC.302/10/2025
MSM ENGINEERING SERVICES, PLLC203/11/2024
RAHMAN CONSULTING303/17/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MISTER EXPEDITER803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CEDARS CONSTRUCTION CORPGeneral Contractor1107/08/2026
GREGG NY PLUMBING, INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. INT'L ENGINEERING PLLC3129302/10/2025
MSM ENGINEERING SERVICES,8449303/17/2022
IP CONCRETE TESTING AND I6252103/08/2022
Building Lifecycle
All (137)Filed (8)Permit Issued (9)Signed Off (6)Violation (2)Inspection (5)Objection (78)Special Inspection (29)
03/17/2025
Signed off — Alteration
SUBSEQUENT APPLICATION HEREWITH FILED FOR PLUMBING WORK TYPE OF INSTALLATION AND RELOCATION OF WATER CLOSETS, LAVATORIES, SHOWERS, SINKS, HOT WATER HEATER, AND BOILER, IN CONJUNCTION WITH ALT JOB NUMBER B00655939-I1.
B00655939-I1
03/12/2025
Signed off — Alteration
SUBSEQUENT APPLICATION HEREWITH FILED FOR PLUMBING WORK TYPE OF INSTALLATION AND RELOCATION OF WATER CLOSETS, LAVATORIES, SHOWERS, SINKS, HOT WATER HEATER, AND BOILER, IN CONJUNCTION WITH ALT JOB NUMBER B00655939-I1.
B00655939-S5
03/11/2025
Signed off — Alteration
SUBSEQUENT APPLICATION HEREWITH FILED FOR PLUMBING WORK TYPE OF INSTALLATION AND RELOCATION OF WATER CLOSETS, LAVATORIES, SHOWERS, SINKS, HOT WATER HEATER, AND BOILER, IN CONJUNCTION WITH ALT JOB NUMBER B00655939-I1.
B00655939-S4
03/06/2025
Signed off — Alteration
SUBSEQUENT APPLICATION HEREWITH FILED FOR PLUMBING WORK TYPE OF INSTALLATION AND RELOCATION OF WATER CLOSETS, LAVATORIES, SHOWERS, SINKS, HOT WATER HEATER, AND BOILER, IN CONJUNCTION WITH ALT JOB NUMBER B00655939-I1.
B00655939-S2
03/06/2025
Signed off — Alteration
SUBSEQUENT APPLICATION HEREWITH FILED FOR PLUMBING WORK TYPE OF INSTALLATION AND RELOCATION OF WATER CLOSETS, LAVATORIES, SHOWERS, SINKS, HOT WATER HEATER, AND BOILER, IN CONJUNCTION WITH ALT JOB NUMBER B00655939-I1.
B00655939-S3
03/04/2025
Signed off — Alteration
SUBSEQUENT APPLICATION HEREWITH FILED FOR PLUMBING WORK TYPE OF INSTALLATION AND RELOCATION OF WATER CLOSETS, LAVATORIES, SHOWERS, SINKS, HOT WATER HEATER, AND BOILER, IN CONJUNCTION WITH ALT JOB NUMBER B00655939-I1.
B00655939-S1
02/12/2025
Objection raised — Other
02/12/2025
Objection resolved — Addressed
02/10/2025
Filed — Alteration
SUBSEQUENT APPLICATION HEREWITH FILED FOR PLUMBING WORK TYPE OF INSTALLATION AND RELOCATION OF WATER CLOSETS, LAVATORIES, SHOWERS, SINKS, HOT WATER HEATER, AND BOILER, IN CONJUNCTION WITH ALT JOB NUMBER B00655939-I1.
B00655939-P2
02/10/2025
Objection raised — Other
02/10/2025
Objection resolved — Addressed
02/10/2025
Objection raised — Other
02/10/2025
Objection resolved — Addressed
04/09/2024
Special inspection requirement — Air barrier - visual inspection
NANIK MASSAND
04/09/2024
Special inspection requirement — Metering
NANIK MASSAND
04/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NANIK MASSAND
04/09/2024
Special inspection requirement — Final
Feng Zhang
04/09/2024
Special inspection requirement — Energy Code Compliance Inspections
NANIK MASSAND
04/09/2024
Special inspection requirement — Fire-Resistance Rated Construction
NANIK MASSAND
04/09/2024
Special inspection requirement — Fenestration air leakage
NANIK MASSAND
04/09/2024
Special inspection requirement — Fenestration areas
NANIK MASSAND
04/09/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
NANIK MASSAND
04/09/2024
Special inspection requirement — Insulation placement and R values
NANIK MASSAND
04/09/2024
Special inspection requirement — Interior lighting power
NANIK MASSAND
03/11/2024
Filed — Alteration
SUBSEQUENT APPLICATION HEREWITH FILED FOR PLUMBING WORK TYPE OF INSTALLATION AND RELOCATION OF WATER CLOSETS, LAVATORIES, SHOWERS, SINKS, HOT WATER HEATER, AND BOILER, IN CONJUNCTION WITH ALT JOB NUMBER B00655939-I1.
B00655939-P1
03/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
03/11/2024
Special inspection requirement — Energy Code Compliance Inspections
NANIK MASSAND
02/09/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/05/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/30/2024
Permit issued — Plumbing
B00655939-S5-PL
07/07/2023
Permit issued — Construction Fence
B00655939-S1-FN
05/02/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/19/2023
Permit issued — Plumbing
B00655939-S5-PL
04/03/2023
Violation issued (ECB, closed)
Construction
03/31/2023
Filed — Alteration
SUBSEQUENT APPLICATION HEREWITH FILED FOR PLUMBING WORK TYPE OF INSTALLATION AND RELOCATION OF WATER CLOSETS, LAVATORIES, SHOWERS, SINKS, HOT WATER HEATER, AND BOILER, IN CONJUNCTION WITH ALT JOB NUMBER B00655939-I1.
B00655939-S5
11/21/2022
Permit issued — General Construction
B00655939-I1-GC
09/13/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/20/2022
Permit issued — Foundation
B00655939-S3-FO
05/20/2022
Permit issued — Support of Excavation
B00655939-S4-SE
05/03/2022
Objection resolved — Addressed
05/03/2022
Objection resolved — Addressed
04/14/2022
Objection resolved — Addressed
04/14/2022
Objection resolved — Addressed
04/11/2022
Objection raised — Scope
04/11/2022
Objection resolved — Addressed
04/10/2022
Objection raised — Other
04/06/2022
Objection resolved — Addressed
03/22/2022
Permit issued — Structural
B00655939-S2-ST
03/17/2022
Filed — Alteration
SUBSEQUENT APPLICATION HEREWITH FILED FOR PLUMBING WORK TYPE OF INSTALLATION AND RELOCATION OF WATER CLOSETS, LAVATORIES, SHOWERS, SINKS, HOT WATER HEATER, AND BOILER, IN CONJUNCTION WITH ALT JOB NUMBER B00655939-I1.
B00655939-S2
03/16/2022
Objection raised — Other
03/11/2022
Objection resolved — Addressed
03/11/2022
Objection resolved — Addressed
03/11/2022
Objection resolved — Addressed
03/11/2022
Objection resolved — Addressed
03/09/2022
Permit issued — General Construction
B00655939-I1-GC
03/09/2022
Objection raised — Admin
03/09/2022
Objection raised — Structural
03/09/2022
Objection raised — Structural
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC01/30/2024
DOB NOWConstruction FenceSigned-offCEDARS CONSTRUCTION GROUP07/07/2023
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC04/19/2023
DOB NOWGeneral ConstructionSigned-offCEDARS CONSTRUCTION GROUP11/21/2022
DOB NOWFoundationSigned-offCEDARS CONSTRUCTION GROUP05/20/2022
DOB NOWSupport of ExcavationSigned-offCEDARS CONSTRUCTION GROUP05/20/2022
DOB NOWStructuralSigned-offCEDARS CONSTRUCTION GROUP03/22/2022
DOB NOWGeneral ConstructionSigned-offCEDARS CONSTRUCTION GROUP03/09/2022
DOB NOWConstruction FenceSigned-offCEDARS CONSTRUCTION GROUP02/28/2022
1 project · most recent 02/12/2023
FiledStatusContractorScope
02/12/2023CompleteKINGS ELECTRIC CO., INC.1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/05/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/02/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/02/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
04/09/2024Air barrier - visual inspectionNANIK MASSANDenergy_progress
04/09/2024MeteringNANIK MASSANDenergy_progress
04/09/2024Structural Stability – Alterations of existing buildingsNANIK MASSANDspecial
04/09/2024FinalFeng Zhangprogress
04/09/2024Energy Code Compliance InspectionsNANIK MASSANDprogress
04/09/2024Fire-Resistance Rated ConstructionNANIK MASSANDprogress
04/09/2024Fenestration air leakageNANIK MASSANDenergy_progress
04/09/2024Fenestration areasNANIK MASSANDenergy_progress
04/09/2024Fenestration and door U-factor and product ratingsNANIK MASSANDenergy_progress
04/09/2024Insulation placement and R valuesNANIK MASSANDenergy_progress
04/09/2024Interior lighting powerNANIK MASSANDenergy_progress
03/11/2024Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
03/11/2024Energy Code Compliance InspectionsNANIK MASSANDprogress
02/28/2022Subgrade InspectionsINDARDEO PARBHUNATHspecial
02/28/2022Subsurface Conditions – Fill Placement & In-Place DensityINDARDEO PARBHUNATHspecial
02/28/2022Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
02/17/2022Structural Wood FrameMOHAMED MAHMOUDprogress
02/17/2022Structural Stability – Alterations of existing buildingsMOHAMED MAHMOUDspecial
02/17/2022Structural Steel - DetailsMOHAMED MAHMOUDspecial
02/17/2022Structural Steel - High Strength BoltingMOHAMED MAHMOUDspecial
02/17/2022Structural Steel - WeldingMOHAMED MAHMOUDspecial
02/17/2022FinalFeng Zhangprogress
02/17/2022Footing and FoundationMOHAMED MAHMOUDprogress
02/17/2022Structural Stability – Alterations of existing buildingsMOHAMED MAHMOUDspecial
02/17/2022Structural Steel - High Strength BoltingMOHAMED MAHMOUDspecial
Latest 25 of 29.
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/31/2026B00655939-P1Request digital key ↗
08/31/2026B00655939-S1Request digital key ↗
08/31/2026B00655939-S2Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00655939-P2Open ↗
08/13/2026B00655939-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00655939-P2Open ↗
08/13/2026B00655939-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026B00655939-P2Open ↗
09/01/2026B00655939-P2Open ↗
09/01/2026B00655939-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/31/2026B00655939-S1Open ↗
08/31/2026B00655939-P1Open ↗
08/31/2026B00655939-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B00655939-P2Open ↗
08/28/2026B00655939-S2Open ↗
08/26/2026B00655939-S4Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00655939-I1Open ↗
08/13/2026B00655939-P2Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/31/2026B00655939-S5Open ↗
08/31/2026B00655939-P1Open ↗
08/31/2026B00655939-S2Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00655939-I1Open ↗
▸Other Documents9
▸DOB NOWPlot Diagram4
08/13/2026B00655939-S3Open ↗
08/13/2026B00655939-S4Open ↗
08/13/2026B00655939-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial2
08/13/2026B00655939-I1Open ↗
08/13/2026B00655939-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00655939-I1Open ↗
08/13/2026B00655939-P2Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00655939-S4Open ↗