← Back
BuildNYC
Two stories - detached, small or mid-size
311 ELMWOOD AVENUE
BROOKLYN · BIN 3170351
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3-1Zoning
1,304 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 3,220 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof41p · 1 filing · 20 docs
Attic8p · 1 filing · 20 docs
Floor 516p · 1 filing · 20 docs
Floor 416p · 1 filing · 20 docs
Floor 316p · 1 filing · 20 docs
Floor 248p · 1 filing · 20 docs
Floor 151p · 1 filing · 20 docs
Cellar49p · 1 filing · 20 docs
Site & exterior62p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/12/2021$1.1M—311 ELMWOOD LLC → Private party$844/sf building
08/31/2016$750K—Private party → 311 ELMWOOD LLC$575/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Real Engineering302/10/2025
MSM Engineering Services203/11/2024
Rahman Consulting303/17/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XYZ Code Consulting803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cedars ConstructionGeneral Contractor907/08/2026
Cedars ConstructionScaffold207/08/2026
Gregg NY PlumbingPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. International Engineering3129302/10/2025
MSM Engineering Services8449303/17/2022
IP Concrete Testing and I6252103/08/2022
Building Lifecycle
03/17/2025
Signed off — Alteration
SUBSEQUENT APPLICATION HEREWITH FILED FOR PLUMBING WORK TYPE OF INSTALLATION AND RELOCATION OF WATER CLOSETS, LAVATORIES, SHOWERS, SINKS, HOT WATER HEATER, AND BOILER, IN CONJUNCTION WITH ALT JOB NUMBER B00655939-I1.
B00655939-I1
03/12/2025
Signed off — Alteration
SUBSEQUENT APPLICATION HEREWITH FILED FOR PLUMBING WORK TYPE OF INSTALLATION AND RELOCATION OF WATER CLOSETS, LAVATORIES, SHOWERS, SINKS, HOT WATER HEATER, AND BOILER, IN CONJUNCTION WITH ALT JOB NUMBER B00655939-I1.
B00655939-S5
03/11/2025
Signed off — Alteration
SUBSEQUENT APPLICATION HEREWITH FILED FOR PLUMBING WORK TYPE OF INSTALLATION AND RELOCATION OF WATER CLOSETS, LAVATORIES, SHOWERS, SINKS, HOT WATER HEATER, AND BOILER, IN CONJUNCTION WITH ALT JOB NUMBER B00655939-I1.
B00655939-S4
03/06/2025
Signed off — Alteration
SUBSEQUENT APPLICATION HEREWITH FILED FOR PLUMBING WORK TYPE OF INSTALLATION AND RELOCATION OF WATER CLOSETS, LAVATORIES, SHOWERS, SINKS, HOT WATER HEATER, AND BOILER, IN CONJUNCTION WITH ALT JOB NUMBER B00655939-I1.
B00655939-S2
03/06/2025
Signed off — Alteration
SUBSEQUENT APPLICATION HEREWITH FILED FOR PLUMBING WORK TYPE OF INSTALLATION AND RELOCATION OF WATER CLOSETS, LAVATORIES, SHOWERS, SINKS, HOT WATER HEATER, AND BOILER, IN CONJUNCTION WITH ALT JOB NUMBER B00655939-I1.
B00655939-S3
80 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGregg NY Plumbing01/30/2024
DOB NOWConstruction FenceSigned-offCedars Construction Group07/07/2023
DOB NOWPlumbingSigned-offGregg NY Plumbing04/19/2023
DOB NOWGeneral ConstructionSigned-offCedars Construction Group11/21/2022
DOB NOWSupport of ExcavationSigned-offCedars Construction Group05/20/2022
DOB NOWFoundationSigned-offCedars Construction Group05/20/2022
DOB NOWStructuralSigned-offCedars Construction Group03/22/2022
DOB NOWGeneral ConstructionSigned-offCedars Construction Group03/09/2022
DOB NOWConstruction FenceSigned-offCedars Construction Group02/28/2022
1 project · most recent 02/12/2023
FiledStatusContractorScope
02/12/2023CompleteKings Electric Co—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/05/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/02/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/02/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
04/09/2024MeteringNANIK MASSANDenergy_progress
04/09/2024Interior lighting powerNANIK MASSANDenergy_progress
04/09/2024Air barrier - visual inspectionNANIK MASSANDenergy_progress
04/09/2024Structural Stability – Alterations of existing buildingsNANIK MASSANDspecial
04/09/2024FinalFeng Zhangprogress
04/09/2024Energy Code Compliance InspectionsNANIK MASSANDprogress
04/09/2024Fire-Resistance Rated ConstructionNANIK MASSANDprogress
04/09/2024Fenestration air leakageNANIK MASSANDenergy_progress
04/09/2024Fenestration areasNANIK MASSANDenergy_progress
04/09/2024Fenestration and door U-factor and product ratingsNANIK MASSANDenergy_progress
04/09/2024Insulation placement and R valuesNANIK MASSANDenergy_progress
03/11/2024Energy Code Compliance InspectionsNANIK MASSANDprogress
03/11/2024Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
02/28/2022Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
02/28/2022Subgrade InspectionsINDARDEO PARBHUNATHspecial
02/28/2022Subsurface Conditions – Fill Placement & In-Place DensityINDARDEO PARBHUNATHspecial
02/17/2022Structural Steel - DetailsMOHAMED MAHMOUDspecial
02/17/2022Structural Wood FrameMOHAMED MAHMOUDprogress
02/17/2022FinalFeng Zhangprogress
02/17/2022Concrete - Cast-In-PlaceMOHAMED MAHMOUDspecial
02/17/2022Structural Stability – Alterations of existing buildingsMOHAMED MAHMOUDspecial
02/17/2022Structural Steel - DetailsMOHAMED MAHMOUDspecial
02/17/2022Structural Steel - High Strength BoltingMOHAMED MAHMOUDspecial
02/17/2022Structural Steel - WeldingMOHAMED MAHMOUDspecial
02/17/2022FinalFeng Zhangprogress
Latest 25 of 29.
58 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account