Full service hotel
Element Times Square
311 WEST 39 STREET · BIN 1088523
💬 Discuss this project
2010Year Built
39Stories
H2Building Class
C6-4Zoning
177,000 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized16 Open Violations 15 unresolved · 1 paperwork only ▸FISP: UNSAFE
Full service hotel · Owner of record: SM ASCOTT LLC · 7,406 sf lot · 23.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
RoofUnder Construction14p · 2 filings · 12 docs
Floor 39Under Construction13p · 1 filing · 10 docs
Floor 38Under Construction13p · 1 filing · 10 docs
Floor 37Under Construction13p · 1 filing · 10 docs
Floor 36Under Construction13p · 1 filing · 10 docs
Floor 35Under Construction13p · 1 filing · 10 docs
Floor 34Under Construction13p · 1 filing · 10 docs
Floor 33Under Construction13p · 1 filing · 10 docs
Floor 32Under Construction13p · 1 filing · 10 docs
Floor 31Under Construction13p · 1 filing · 10 docs
Floor 30Under Construction13p · 1 filing · 10 docs
Floor 29Under Construction13p · 1 filing · 10 docs
Floor 28Under Construction13p · 1 filing · 10 docs
Floor 27Under Construction13p · 1 filing · 10 docs
Floor 26Under Construction13p · 1 filing · 10 docs
Floor 25Under Construction13p · 1 filing · 10 docs
Floor 24Under Construction13p · 1 filing · 10 docs
Floor 23Under Construction13p · 1 filing · 10 docs
Floor 22Under Construction13p · 1 filing · 10 docs
Floor 21Under Construction13p · 1 filing · 10 docs
Floor 20Under Construction13p · 1 filing · 10 docs
Floor 19Under Construction13p · 1 filing · 10 docs
Floor 18Under Construction13p · 1 filing · 10 docs
Floor 17Under Construction13p · 1 filing · 10 docs
Floor 16Under Construction13p · 1 filing · 10 docs
Floor 15Under Construction13p · 1 filing · 10 docs
Floor 14Under Construction13p · 1 filing · 10 docs
Floor 13Under Construction13p · 1 filing · 10 docs
Floor 12Under Construction13p · 1 filing · 10 docs
Floor 11Under Construction13p · 1 filing · 10 docs
Floor 10Under Construction13p · 1 filing · 10 docs
Floor 9Under Construction13p · 1 filing · 10 docs
Floor 8Under Construction13p · 1 filing · 10 docs
Floor 7Under Construction13p · 1 filing · 10 docs
Floor 6Under Construction13p · 1 filing · 10 docs
Floor 5Under Construction13p · 1 filing · 10 docs
Floor 4Under Construction13p · 1 filing · 10 docs
Floor 3Under Construction13p · 1 filing · 10 docs
Floor 2Under Construction13p · 1 filing · 10 docs
Floor 1Under Construction13p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRS1409/01/2026
RAND ENGINEERING & ARCHITECTURE, DP404/09/2026
THE ASCOTT LIMITED303/22/2026
SM ASCOTT LLC203/22/2026
TRITEL CONSTRUCTION GROUP LLC2903/22/2026
TRITEL CONST. GROUP LLC603/22/2026
URBAN FOUNDATION ENGINEER703/22/2026
OWNER OF 311 W 39ST103/22/2026
WALSAM 30739603/22/2026
CNY CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/29/2016$128.2M—Private party → B.H. 311 WEST 39TH STREET, LLC$724/sf building
10/09/2013$114.4M—— → —$646/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALWAYS FAST SERVICES CORP203/12/2026
RAND ENGINEERING & ARCHITECTURE DPC108/29/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIERARCH-E403/21/2026
JULIAN A. GOMEZ203/21/2026
RIGGINING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor409/01/2026
MILLAR ELEVATOR IND., INCElectrical103/21/2026
POFI CONSTRUCTION CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAND ENGINEERING & ARCHIT266108/29/2025
Building Lifecycle
All (99)Filed (6)Permit Issued (8)Signed Off (2)Facade (FISP) (9)Violation (60)Inspection (10)Objection (4)
08/31/2026
Permit issued — Sidewalk Shed
M01368281-I1-SH
07/02/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/10/2026
Permit issued — Sidewalk Shed
M01368281-I1-SH
05/11/2026
Violation issued (HPD, open)
A
04/10/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/27/2026
Signed off — Alteration
9th Cycle FISP Repair; No change to Use, Egress or Occupancy.
M01198610-S2
03/20/2026
Permit issued — Suspended Scaffold
M01198610-S3-SC
03/17/2026
Permit issued — Sidewalk Shed
M01368281-I1-SH
03/13/2026
Permit issued — Protection and Mechanical Methods
M01368307-I1-PMM
03/12/2026
Filed — Alteration
9th Cycle FISP Repair; No change to Use, Egress or Occupancy.
M01198610-S3
03/12/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
M01368307-I1
03/07/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01368281-I1
02/26/2026
Permit issued — Suspended Scaffold
M01198610-S2-SC
02/19/2026
Filed — Alteration
9th Cycle FISP Repair; No change to Use, Egress or Occupancy.
M01198610-S2
01/14/2026
Permit issued — General Construction
M01198610-I1-GC
12/19/2025
Cycle 10 facade report submitted
12/18/2025
Cycle 10 facade report signed — UNSAFE
12/10/2025
Cycle 10 facade inspection completed
11/17/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/26/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
09/24/2025
Objection raised — Scope
09/24/2025
Objection raised — Scope
08/29/2025
Filed — Alteration
9th Cycle FISP Repair; No change to Use, Egress or Occupancy.
M01198610-I1
06/16/2025
Violation issued (HPD, open)
A
06/06/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/03/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/22/2024
Violation issued (HPD, open)
I
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/05/2024
Signed off — Alteration
M00983485-I1
08/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/18/2024
Violation issued (HPD, open)
A
03/20/2024
Cycle 9 facade report submitted
03/20/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/13/2024
Cycle 9 facade report signed — UNSAFE
03/12/2024
Cycle 9 facade inspection completed
02/22/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2024
Permit issued — Suspended Scaffold
M00983485-I1-SC
01/25/2024
Filed — Alteration
M00983485-I1
11/15/2023
Violation issued (HPD, open)
I
08/11/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/16/2023
Violation issued (ECB, open)
Boilers
03/31/2023
Violation issued (HPD, open)
A
12/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC08/31/2026
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC06/10/2026
DOB NOWSuspended ScaffoldPermit IssuedPOFI CONSTRUCTION CORP03/20/2026
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC03/17/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedANDAMIO SCAFFOLDING LLC03/13/2026
DOB NOWSuspended ScaffoldSigned-offPOFI CONSTRUCTION CORP02/26/2026
DOB NOWGeneral ConstructionPermit IssuedPOFI CONSTRUCTION CORP01/14/2026
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM01/31/2024
BISPLISSUEDDOMESTIC PLUMBING CORP09/05/2013
BISCCISSUEDCNY CONSTRUCTION LLC07/01/2013
BISSPISSUEDEMPIRE WATER MAIN&SEWER I11/04/2011
BIS—ISSUEDCAD SIGNS NYC CORP03/11/2011
BIS—ISSUEDCAD SIGNS NYC CORP03/11/2011
BISSDISSUEDEMPIRE WATER MAIN&SEWER I01/20/2011
BISPLISSUEDTRI CITY MECHANICAL GROUP CORP10/29/2010
BIS—ISSUEDNORTH SHORE NEON SIGN CO09/27/2010
BIS—ISSUEDNORTH SHORE NEON SIGN CO07/28/2010
BISPLISSUEDTRI CITY MECHANICAL GROUP CORP07/26/2010
BISOTISSUEDCNY CONSTRUCTION LLC07/22/2010
BIS—ISSUEDCNY CONSTRUCTION LLC07/22/2010
BISOTISSUEDCNY CONSTRUCTION LLC07/21/2010
BISEQISSUEDCNY CONSTRUCTION LLC07/21/2010
BISEQISSUEDREGIONAL SCAFFOLDING & HO04/16/2010
BISEQISSUEDREGIONAL SCAFFOLDING & HO04/09/2010
BISEQISSUEDREGIONAL SCAFFOLDING & HO03/23/2010
BISSDISSUEDEMPIRE WATER MAIN&SEWER I03/10/2010
BIS—ISSUEDCNY CONSTRUCTION LLC02/23/2010
BISSDISSUEDEMPIRE WATER MAIN&SEWER I12/23/2009
BISSPISSUEDEMPIRE WATER MAIN&SEWER I12/23/2009
BISSPISSUEDEMPIRE WATER MAIN&SEWER I12/23/2009
BISOTISSUEDCNY CONSTRUCTION LLC11/05/2009
BISMHISSUEDCNY CONSTRUCTION LLC11/05/2009
BISOTISSUEDCNY CONSTRUCTION LLC11/05/2009
BISFSISSUEDPETER AGLIARDO CONTRACTOR10/01/2009
BISPLISSUEDTRI CITY MECHANICAL GROUP CORP07/09/2009
BISEQISSUEDTRITEL CONSTR. GRP LLC04/07/2009
BISEQISSUEDREGIONAL SCAFFOLDING & H*04/02/2009
BISEQISSUEDREGIONAL SCAFFOLDING & H*03/31/2009
BISOTISSUEDURBAN FOUNDATION ENGINEERING01/09/2009
BISMHISSUEDTRITEL CONSTR. GRP LLC12/29/2008
+ 17 more permits on file
2 projects · most recent 03/17/2026
General Wiring
FiledStatusContractorScope
03/17/2026Permit IssuedBOROWIDE ELECT'L CONTR'S—
05/09/2024Permit IssuedTRANSEL ELEV. & ELEC. INCGeneral Wiring
1 project · most recent 03/12/2026
FiledStatusContractorScope
03/12/2026Permit IssuedANDAMIO SCAFFOLDING LLC1 scope_items
1 project · most recent 03/07/2026
Sidewalk Shed
FiledStatusContractorScope
03/07/2026Permit IssuedANDAMIO SCAFFOLDING LLCSidewalk Shed
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/02/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/10/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/06/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/06/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/03/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/11/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/11/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Documents — 291 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/28/2026M00983485-I1Request digital key ↗
08/19/2026M01198610-S3Request digital key ↗
08/19/2026M01198610-S2Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits60
▸BISPLAN / WORK APPROVAL APPLICATION30
08/14/2013121745558Open ↗
06/28/2013121691561Open ↗
11/08/2010110083855Open ↗
Showing 3 of 30 on file for this type
▸BISWORK PERMIT APPLICATION29
09/16/2013121745558Open ↗
07/10/2013121691561Open ↗
03/15/2011110368673Open ↗
Showing 3 of 29 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
03/09/2011120167988Open ↗
▸Seals & Professional Certifications80
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION40
09/16/2013121745558Open ↗
08/14/2013121745558Open ↗
06/28/2013121691561Open ↗
Showing 3 of 40 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM18
08/14/2013121745558Open ↗
06/28/2013121691561Open ↗
09/30/2010120475841Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST16
08/14/2013121745558Open ↗
06/28/2013121691561Open ↗
09/30/2010120475841Open ↗
Showing 3 of 16 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/19/2026M01198610-I1Open ↗
08/18/2026M01368281-I1Open ↗
08/18/2026M01368307-I1Open ↗
▸Trade Schedules & Equipment18
▸BISSELF-CERT PLUMBING NOTICE8
03/27/2014121745558Open ↗
02/22/2012110083855Open ↗
03/04/2011110083855Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING6
08/14/2013121745558Open ↗
11/08/2010110083855Open ↗
10/15/2010110083855Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
07/26/2010120327388Open ↗
04/22/2010120327388Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
03/04/2011110083855Open ↗
▸BISSTANDPIPE INSP REPORT : FP-841
01/12/2011110083855Open ↗
▸Safety & Tenant Protection7
▸DOB NOWHPD-1: Anti-Harassment Area Checklist3
08/13/2026M01368307-I1Open ↗
08/13/2026M01198610-I1Open ↗
08/13/2026M01368281-I1Open ↗
▸BISANTI-HARASSMENT CHECKLIST2
08/14/2013121745558Open ↗
06/28/2013121691561Open ↗
▸BISHPD-1: Anti-Harassment Area Checklist2
05/06/2009120024936Open ↗
Showing 1 of 2 on file for this type
▸Environmental & Asbestos20
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER19
09/30/2010120475841Open ↗
07/22/2010120415595Open ↗
04/22/2010120327388Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWOER: Notice to Proceed1
08/13/2026M01198610-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/14/2013121745558Open ↗
▸Approvals, Objections & Sign-offs41
▸BISADMINISTRATIVE OBJECTIONS19
06/28/2013121691561Open ↗
09/30/2010120475841Open ↗
07/22/2010120415595Open ↗
Showing 3 of 19 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
09/20/2013121691561Open ↗
12/19/2012110083855Open ↗
01/26/2012110083855Open ↗
Showing 3 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
08/19/2011120327388Open ↗
03/04/2011110083855Open ↗
01/18/2011110347526Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT17
08/14/2013121745558Open ↗
06/28/2013121691561Open ↗
01/24/2012110083855Open ↗
Showing 3 of 17 on file for this type
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET11
08/14/2013121745558Open ↗
06/28/2013121691561Open ↗
09/30/2010120475841Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION4
11/03/2010110083855Open ↗
10/20/2010120327388Open ↗
07/26/2010120327388Open ↗
Showing 3 of 4 on file for this type
▸BISeFiling Job Application Cover Sheet1
02/25/2010120275656Open ↗
▸Other Documents25
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION10
08/19/2013121745558Open ↗
06/16/2011110381364Open ↗
03/30/2011110116838Open ↗
Showing 3 of 10 on file for this type
▸BISENVIRONMENTAL -E- DEP NOTICE OF SATIS3
03/09/2011120167988Open ↗
02/18/2011110060576Open ↗
05/06/2009120024936Open ↗
▸DOB NOWCalculations3
08/19/2026M01198610-S3Open ↗
08/13/2026M01198610-S3Open ↗
08/13/2026M01198610-S2Open ↗
▸DOB NOWManufacturer's Specifications3
08/19/2026M01198610-S3Open ↗
08/13/2026M01198610-S3Open ↗
08/13/2026M01198610-S2Open ↗
▸BISENVIRONMENTAL(E) DEP NOTICE TO PROCEED2
04/26/2010120327388Open ↗
03/08/2010120275656Open ↗
▸BISSupporting Document: Fee Exempt1
04/19/2011110381355Open ↗
▸BISSD/SP FIRE PUMP TEST : FP-861
01/12/2011110083855Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
03/30/2011120136593Open ↗
▸DOB NOWIRA Certification1
08/13/2026M00983485-I1Open ↗