← Back
BuildNYC
Elevator apt, fireproof with stores
311 WEST 57TH STREET
MANHATTAN · BIN 1026051
💬 Discuss this project
1928Year Built
16Stories
D6Building Class
C6-6Zoning
75,617 sfGross Floor Area
108Units
LL97 CoveredRent Stabilized1 Active Violation 0 unresolved · 1 paperwork only 8 likely answered 2 old, status unconfirmed ▸FISP: No Report Filed
Elevator apt, fireproof with stores · Owner of record: Westside 309 · 7,531 sf lot · 10.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsBronstein Properties LLCUnder Construction1 filing
Floor 4Medium duty pipe scaffold installation1 filing · 2 docs
Floor 3Medium duty pipe scaffold installation1 filing · 2 docs
Floor 2Samsung6p · 22 filings · 5 docs
Floor 1SamsungUnder Construction7p · 23 filings · 5 docs
CellarSamsung6p · 24 filings · 20 docs
Site & exteriorSmoke NtokeUnder Construction3 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Bronstein Properties5308/26/2026
309 Realty1803/21/2026
Westside 3091203/22/2026
Metronome Events703/21/2026
David Associates603/21/2026
309 Realty LLC David Assoicates303/21/2026
Providence103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kma Designs105/30/2025
SBLM Architects2205/29/2025
Ospino Engineering203/13/2025
George J. Xerakias, PE212/18/2024
A&B World Consulting103/13/2023
Alpha Home Design202/21/2023
A.P. Associates102/05/2021
CES Engineering602/12/2020
Baileys Engineering104/17/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SBLM1403/21/2026
Hierarch-E403/21/2026
Indesign Studio403/21/2026
Kma Designs203/21/2026
RPO1403/21/2026
YBL NY203/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Total NY ConstructionScaffold507/08/2026
Everest ScaffoldingScaffold403/21/2026
Kings Group NYScaffold308/14/2026
Two-Tone ContractingGeneral Contractor308/26/2026
Top Tier ElectricElectrical203/21/2026
Atlantida HVACspecialty_contractor203/21/2026
Boardwalk Plumbing & HeatingFire Protection107/08/2026
High Quality Electric ofElectrical103/21/2026
Ebm PlumbingPlumbing107/08/2026
L&B Electrical InternationalElectrical103/21/2026
C.Q. Electr'l ContractingElectrical103/21/2026
M. International EngineeringGeneral Contractor107/08/2026
Apex Group NYScaffold107/08/2026
Neptune Signs & AwningsSign hanger107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
George J. Xerakias, PE1658212/18/2024
A&B World Consulting5704103/13/2023
Alan Margolin & Associates423402/12/2020
Building Lifecycle
All (181)Filed (38)Permit Issued (20)Signed Off (3)Facade (FISP) (9)Violation (60)Objection (22)Special Inspection (29)
08/13/2026
Permit issued — Sidewalk Shed
M01233661-I1-SH
07/20/2026
Permit issued — General Construction
M01104808-I1-GC
05/19/2026
Permit issued — Sidewalk Shed
M01233661-I1-SH
05/15/2026
Permit issued — Suspended Scaffold
M01132794-I1-SC
04/01/2026
Violation issued (ECB, closed)
Elevators
09/10/2025
Violation issued (HPD, closed)
C
05/30/2025
Filed — Alteration
M01233661-I1
05/30/2025
Permit issued — Sidewalk Shed
M01233661-I1-SH
05/29/2025
Filed — No Work
M01232445-I1
05/06/2025
Permit issued — General Construction
M01104808-I1-GC
05/06/2025
Permit issued — Suspended Scaffold
M01132794-I1-SC
03/13/2025
Filed — Alteration
M01132794-P1
03/05/2025
Filed — No Work
M01189058-I1
12/18/2024
Filed — Alteration
SOUND OUT ALL DECORATIVE STONES, COLUMN, MEDALLIONS, DOUBLE WINDOW ARCHES&BASES, DECORATIVE STONE WATER TABLES - TWO LINES, POINTING WORK, NEW SEALANTS AT WINDOWS WORK (DOUBLE AND TRIPLE) AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01104808-P1
12/18/2024
Special inspection requirement — Tenant Protection Plan Compliance
George Xerakias
12/18/2024
Special inspection requirement — Masonry
George Xerakias
12/18/2024
Special inspection requirement — Final
George Xerakias
12/18/2024
Special inspection requirement — Energy Code Compliance Inspections
George Xerakias
12/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
George Xerakias
12/17/2024
Special inspection requirement — Final
George Xerakias
12/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
George Xerakias
12/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
12/17/2024
Special inspection requirement — Energy Code Compliance Inspections
George Xerakias
12/17/2024
Special inspection requirement — Masonry
George Xerakias
11/27/2024
Filed — No Work
M01148131-I1
11/13/2024
Filed — Alteration
SOUND OUT ALL DECORATIVE STONES, COLUMN, MEDALLIONS, DOUBLE WINDOW ARCHES&BASES, DECORATIVE STONE WATER TABLES - TWO LINES, POINTING WORK, NEW SEALANTS AT WINDOWS WORK (DOUBLE AND TRIPLE) AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01104808-I1
11/08/2024
Permit issued — General Construction
M00825461-I1-GC
10/28/2024
Permit issued — Suspended Scaffold
M01132794-I1-SC
10/25/2024
Filed — Alteration
M01132794-I1
09/20/2024
Signed off — Alteration
ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00805064-I1
08/26/2024
Filed — No Work
M01100352-I1
05/10/2024
Filed — No Work
M01048858-I1
05/02/2024
Violation issued (ECB, open)
Local Law
02/16/2024
Filed — No Work
M01006876-I1
12/11/2023
Signed off — Alteration
INSTALL MEDIUM DUTY SCAFFOLDING AS PER PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY UNDER THIS APPLICATION. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
M00465489-I1
11/27/2023
Filed — No Work
M00965395-I1
08/29/2023
Objection raised — Mechanical
08/29/2023
Objection resolved — Addressed
08/29/2023
Objection raised — Structural
08/29/2023
Objection resolved — Addressed
08/29/2023
Objection raised — Structural
08/29/2023
Objection resolved — Addressed
08/28/2023
Filed — No Work
M00925654-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/13/2023
Filed — No Work
M00882649-I1
04/12/2023
Permit issued — Supported Scaffold
M00465489-I1-SF
03/29/2023
Permit issued — General Construction
M00825461-I1-GC
03/13/2023
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF EXISTING STORE INCLUDING NEW EQUIPMENT AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M00825461-I1
03/03/2023
Filed — No Work
M00837210-I1
02/28/2023
Permit issued — Supported Scaffold
M00465489-I1-SF
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/21/2023
Filed — Alteration
ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00805064-P1
02/21/2023
Special inspection requirement — Final
YAN GAO
Latest 60 of 181 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedKings Group NY08/13/2026
DOB NOWGeneral ConstructionPermit IssuedTwo-Tone Contracting07/20/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY05/19/2026
DOB NOWSuspended ScaffoldPermit IssuedTwo-Tone Contracting05/15/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY05/30/2025
DOB NOWGeneral ConstructionPermit IssuedTwo-Tone Contracting05/06/2025
DOB NOWSuspended ScaffoldPermit IssuedTwo-Tone Contracting05/06/2025
DOB NOWGeneral ConstructionPermit IssuedTwo-Tone Contracting11/08/2024
DOB NOWSuspended ScaffoldPermit IssuedTwo-Tone Contracting10/28/2024
DOB NOWSupported ScaffoldSigned-offApex Group NY04/12/2023
DOB NOWGeneral ConstructionPermit IssuedM. International Engineering03/29/2023
DOB NOWSupported ScaffoldSigned-offTotal NY Construction02/28/2023
DOB NOWSignSigned-offDesthers, Joseph02/13/2023
DOB NOWSupported ScaffoldSigned-offTotal NY Construction03/01/2022
DOB NOWSupported ScaffoldSigned-offTotal NY Construction02/08/2021
DOB NOWMechanical SystemsSigned-offAtlantida HVAC02/14/2020
DOB NOWSprinklersPermit IssuedBoardwalk Plumbing & Heating12/19/2019
DOB NOWPlumbingPermit IssuedEbm Plumbing11/19/2019
DOB NOWSidewalk ShedSigned-offEverest Scaffolding07/24/2018
DOB NOWSidewalk ShedSigned-offEverest Scaffolding04/18/2018
BISOTISSUEDCCM Design & Consulting *11/25/2020
BISOTISSUEDMetro General Contracting10/21/2019
BISOTISSUEDBindner Spencer Constrc09/26/2019
BISOTISSUEDBindner Spencer Constrc09/26/2019
BISOTISSUEDReal Deal Decoration11/28/2018
BISOTISSUEDEbro Dique Group05/14/2018
BISMHISSUEDReal Deal Decoration03/06/2018
BISPLISSUEDWexler Plumbing03/06/2018
BISOTISSUEDEnvironmental Appraiser12/07/2017
BISOTISSUEDEnvironmental Appraiser07/05/2017
BISMHISSUEDCocozza Group03/30/2016
BISPLISSUEDJ. Caiazzo Plumbing & Heating03/30/2016
BIS—ISSUEDL.S. Sign Co03/18/2016
BISOTISSUEDSigns Artistry Awning Co*03/18/2016
BIS—ISSUEDL.S. Sign Co03/18/2016
BISOTISSUEDCocozza Group02/25/2016
BISEQISSUEDCocozza Group02/19/2016
BISOTISSUEDCocozza Group02/19/2016
BISOTISSUEDL & Z Restoration04/05/2011
BISOTISSUEDUnited Restoration & Development09/29/2010
+ 30 more permits on file
1 project · most recent 02/12/2020
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/12/2020Signed-offAtlantida HVACAir Conditioning Systems
Cooling
Samsung AM120FXVAFH2AA 120,000 BTU · Vrf Outdoor ×1
AM168FXVAFH2AA 168,000 BTU · Vrf Outdoor ×1
1 project · most recent 12/30/2019
Gas Water/Sanitary
FiledStatusContractorScope
12/30/2019Permit IssuedBoardwalk Plumbing & HeatingGas, Water/Sanitary
10 projects · most recent 06/04/2025
General Wiring
FiledStatusContractorScope
06/04/2025Permit IssuedHigh Quality Electric of NYC—
03/02/2023CompleteAsko Electric Construction & Maintenance—
10/30/2019Permit IssuedPower Masters Electrical ContGeneral Wiring
10/30/2019Permit IssuedPaul M. & Son's Electrical ConGeneral Wiring
04/17/2019CompleteTop Tier ElectricGeneral Wiring
09/27/2018Permit IssuedTop Tier ElectricGeneral Wiring
07/24/2018Permit IssuedTop Tier ElectricGeneral Wiring
05/08/2018Permit IssuedEco Electrical Servcs—
04/18/2018CompleteTop Tier ElectricGeneral Wiring
03/28/2018CompleteBorowide Elect'l Contractors—
1 project · most recent 03/13/2023
FiledStatusContractorScope
03/13/2023Permit IssuedTwo-Tone Contracting1 scope_items
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
12/18/2024Tenant Protection Plan ComplianceGeorge Xerakiasspecial
12/18/2024MasonryGeorge Xerakiasspecial
12/18/2024FinalGeorge Xerakiasprogress
12/18/2024Energy Code Compliance InspectionsGeorge Xerakiasprogress
12/18/2024Structural Stability – Alterations of existing buildingsGeorge Xerakiasspecial
12/17/2024FinalGeorge Xerakiasprogress
12/17/2024Structural Stability – Alterations of existing buildingsGeorge Xerakiasspecial
12/17/2024Tenant Protection Plan Compliance—special
12/17/2024Energy Code Compliance InspectionsGeorge Xerakiasprogress
12/17/2024MasonryGeorge Xerakiasspecial
02/21/2023FinalYAN GAOprogress
02/21/2023FinalYAN GAOprogress
02/15/2023Tenant Protection Plan ComplianceAlexander Bomsteinspecial
02/08/2023Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
07/21/2021Public Assembly Emergency LightingDavid Nicholsonprogress
02/12/2020Mechanical SystemsYoung Suhspecial
02/12/2020HVAC insulation and sealing Young Suhenergy_progress
02/12/2020HVAC and service water heating equipment Young Suhenergy_progress
02/12/2020Duct leakage testing Young Suhenergy_progress
02/12/2020HVAC and service water heating system controls Young Suhenergy_progress
02/12/2020FinalYoung Suhprogress
11/21/2019FinalYoung Suhprogress
11/21/2019Sprinkler SystemsYoung Suhspecial
11/21/2019HVAC and service water heating equipment Young Suhenergy_progress
11/21/2019Duct leakage testing Young Suhenergy_progress
Latest 25 of 29.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Smoke NtokeRetail—
Project M00805064 Alteration · LOC Issued · 01/30/2023
SamsungOfficeCellar, Floors 1, 2
Project M00219432 Alteration · Permit Entire · 09/10/2019
Project M00219467 Alteration · Permit Entire · 09/10/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 420 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch - Temporary Place of Assembly21
09/05/2026M00157209-I1Request digital key ↗
09/05/2026M00171930-I1Request digital key ↗
09/05/2026M00269101-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch9
09/06/2026M00030776-I1Request digital key ↗
09/01/2026M00805064-I1Request digital key ↗
09/01/2026M00805064-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00219432-P2Request digital key ↗
09/05/2026M00219432-P1Request digital key ↗
09/05/2026M00219432-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00219467-I1Request digital key ↗
08/15/2026M00219467-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
09/03/2026M00561732-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00465489-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00219467-S1Request digital key ↗
▸Applications & Permits74
▸BISPLAN / WORK APPROVAL APPLICATION40
03/19/2022123067313Open ↗
01/06/2022123067313Open ↗
10/25/2021123067313Open ↗
Showing 3 of 40 on file for this type
▸BISWORK PERMIT APPLICATION30
11/25/2020123802420Open ↗
10/22/2019123890673Open ↗
09/26/2019123802420Open ↗
Showing 3 of 30 on file for this type
▸BISPLACE OF ASSEMBLY4
03/05/2023104052720Open ↗
10/06/2021104052720Open ↗
10/01/2021104052720Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications131
▸DOB NOWDPL-1: Design Professional Seal & Signature38
09/06/2026M00030776-I1Open ↗
09/05/2026M00157209-I1Open ↗
09/05/2026M00202823-I1Open ↗
Showing 3 of 38 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION28
01/22/2020123890673Open ↗
01/22/2020123890673Open ↗
09/27/2019123890673Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
10/12/2026M00561732-I1Open ↗
09/27/2026M00219432-I1Open ↗
09/27/2026M00219432-I1Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
09/27/2019123890673Open ↗
09/12/2019123802420Open ↗
09/12/2019123802420Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
09/27/2019123890673Open ↗
09/12/2019123802420Open ↗
03/05/2018140745166Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/27/2026M00219432-I1Open ↗
09/01/2026M00219432-P1Open ↗
08/29/2026M01104808-P1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
03/05/2018140745166Open ↗
01/27/2018140734891Open ↗
11/02/2017140713468Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
03/05/2018140745166Open ↗
01/27/2018140734891Open ↗
11/02/2017140713468Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING3
01/27/2018140734891Open ↗
Showing 1 of 3 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection15
▸BISTENANT PROTECTION PLAN AND NOTES9
10/25/2021123067313Open ↗
01/27/2018140734891Open ↗
11/02/2017140713468Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWTenant Protection Plan6
09/05/2026M00219432-P1Open ↗
09/05/2026M00219432-P2Open ↗
09/05/2026M00219432-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos24
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
09/27/2019123890673Open ↗
09/12/2019123802420Open ↗
01/27/2018140734891Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/05/2026M00219432-P2Open ↗
09/05/2026M00219432-P1Open ↗
09/05/2026M00219432-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
03/06/2018140734891Open ↗
01/27/2018140734891Open ↗
11/02/2017140713468Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
01/22/2020123890673Open ↗
01/22/2020123890673Open ↗
09/27/2019123890673Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
01/27/2018140734891Open ↗
11/02/2017140713468Open ↗
Showing 2 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
01/22/2020123890673Open ↗
10/23/2018140713468Open ↗
06/04/2018140734891Open ↗
▸BISNYCECC ANALYSIS2
01/27/2018140734891Open ↗
11/02/2017140713468Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/15/2022123067313Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY9
09/14/2021123067313Open ↗
09/14/2021123067313Open ↗
08/17/2021123067313Open ↗
Showing 3 of 9 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
03/15/2022123067313Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
03/15/2022123067313Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
07/13/2021123802420Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
03/15/2022123067313Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
03/15/2022123067313Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
03/15/2022123067313Open ↗
▸Approvals, Objections & Sign-offs24
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
07/13/2021123802420Open ↗
01/22/2020123890673Open ↗
10/23/2018140713468Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSUPERSEDING LETTER3
11/25/2020123802420Open ↗
09/26/2019123067313Open ↗
12/04/2018123067313Open ↗
▸BISFINAL2
03/15/2022123067313Open ↗
03/15/2022123067313Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/12/2019123802420Open ↗
▸Cost, Insurance & Ownership28
▸BISCOST AFFIDAVIT24
01/22/2020123890673Open ↗
09/27/2019123890673Open ↗
09/12/2019123802420Open ↗
Showing 3 of 24 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST2
05/14/2018140713468Open ↗
03/06/2018140734891Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
03/18/2022123067313Open ↗
07/13/2021123802420Open ↗
▸Filing & Intake Forms37
▸BISEFILING COVER SHEET11
09/27/2019123890673Open ↗
09/12/2019123802420Open ↗
04/18/2017123067313Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION11
02/11/2025104052720Open ↗
03/19/2022123067313Open ↗
10/12/2021104052720Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM10
01/22/2020123890673Open ↗
11/13/2019123802420Open ↗
10/23/2018140713468Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
03/05/2018140745166Open ↗
01/27/2018140734891Open ↗
11/02/2017140713468Open ↗
Showing 3 of 5 on file for this type
▸Other Documents9
▸BISDHCR DOCUMENT4
09/12/2019123802420Open ↗
09/12/2019123802420Open ↗
09/12/2019123802420Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026M01132794-I1Open ↗
08/13/2026M01132794-P1Open ↗
▸DOB NOWCalculations2
08/13/2026M01132794-P1Open ↗
08/13/2026M01132794-I1Open ↗
▸BISPRELIMINARY1
03/15/2022123067313Open ↗