← Back
BuildNYC
Elevator apt, semi-fireproof without stores
311 WEST 95TH STREET
MANHATTAN · BIN 1034189
💬 Discuss this project
1903Year Built
7Stories
D1Building Class
R8Zoning
31,360 sfGross Floor Area
32Units
LL97 CoveredRent Stabilized26 Active Violations 19 unresolved · 7 paperwork only 14 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Plon Realty · 6,210 sf lot · 5.05 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 724p · 1 filing · 20 docs
Floor 6Unit 6B35p · 2 filings · 20 docs
Floor 524p · 1 filing · 20 docs
Floor 411p · 1 filing · 20 docs
Floor 325p · 1 filing · 20 docs
Floor 227p · 1 filing · 20 docs
Floor 1Unit 1D, Unit 1BN25p · 1 filing · 20 docs
Basement31p · 1 filing · 20 docs
Site & exteriorGuidance Realty Corporation13p · 3 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Plon Realty5910/04/2026
Guidance Realty807/08/2026
Fast Consulting Expediting807/08/2026
Marbrose Realty503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
St Design & Consulting909/14/2026
Ashraf104/18/2023
Enthink Engineers203/13/2023
Richard Koenigsberg112/16/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
R H Drummond Exp1603/21/2026
Danico Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Shane WaltersGeneral Contractor807/08/2026
Lloyd G Drummond Plumbing & GenPlumbing407/08/2026
Metro Contracting NYScaffold307/08/2026
Sardar Restorationspecialty_contractor303/21/2026
Sardar RestorationScaffold107/08/2026
Shane WaltersGeneral Contractor103/21/2026
Osso Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Samy Abouzid Engineering9517309/14/2026
HRF Services5616112/16/2022
Koenigsberg Engineering2247112/16/2022
Ductile Consulting9349104/13/2022
Building Lifecycle
All (130)Filed (13)Permit Issued (13)Signed Off (6)Facade (FISP) (14)Violation (60)Inspection (11)Objection (2)Special Inspection (11)
09/17/2026
Objection raised — Other
09/17/2026
Objection resolved — Addressed
09/14/2026
Filed — Alteration CO
Application filed in conjunction with ALT1 #M00742930-I1 TO LEGALIZE PLUMBING FIXTURES, CAP, AND REMOVE FIXTURES AS PER PLAN.
M00742930-P4
09/11/2026
Special inspection requirement — Lighting in dwelling units
MD-SHAMIM AKOND
09/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Samy Abouzid
08/26/2026
Violation issued (HPD, open)
A
08/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Samy Abouzid
08/07/2026
Special inspection requirement — Lighting in dwelling units
MD-SHAMIM AKOND
06/09/2026
Violation issued (ECB, closed)
Elevators
04/23/2026
Filed — Alteration CO
Application filed in conjunction with ALT1 #M00742930-I1 TO LEGALIZE PLUMBING FIXTURES, CAP, AND REMOVE FIXTURES AS PER PLAN.
M00742930-P2
04/01/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/16/2026
Signed off — Alteration
Application filed in conjunction with construction job to show plumbing work as per plan. No change in use, egress or occupency,
M00705682-I1
03/11/2026
Violation issued (HPD, open)
B
03/11/2026
Violation issued (HPD, open)
B
03/11/2026
Violation issued (HPD, open)
C
03/11/2026
Violation issued (HPD, open)
B
03/11/2026
Violation issued (HPD, open)
B
03/11/2026
Violation issued (HPD, open)
B
03/11/2026
Violation issued (HPD, closed)
A
03/11/2026
Violation issued (HPD, open)
C
03/11/2026
Violation issued (HPD, open)
A
03/11/2026
Violation issued (HPD, open)
B
11/17/2025
Violation issued (HPD, closed)
I
11/05/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/08/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
12/23/2024
Permit issued — General Construction
M00742930-I1-GC
07/23/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00795573-I1
07/23/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/16/2024
Signed off — Alteration
Application filed in conjunction with construction job to show plumbing work as per plan. No change in use, egress or occupency,
M00705682-S1
06/10/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/31/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/23/2024
Cycle 9 facade report signed — SAFE
05/22/2024
Cycle 9 facade report submitted
05/21/2024
Violation issued (HPD, closed)
C
05/21/2024
Violation issued (HPD, closed)
C
05/21/2024
Violation issued (HPD, closed)
C
05/21/2024
Violation issued (HPD, closed)
C
05/21/2024
Violation issued (HPD, closed)
B
05/13/2024
Permit issued — Plumbing
M00705682-S1-PL
05/13/2024
Cycle 9 facade inspection completed
04/04/2024
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
03/22/2024
Violation issued (HPD, closed)
A
03/22/2024
Violation issued (HPD, closed)
C
03/22/2024
Violation issued (HPD, closed)
B
03/22/2024
Violation issued (HPD, closed)
C
03/22/2024
Violation issued (HPD, closed)
C
03/22/2024
Violation issued (HPD, closed)
B
03/22/2024
Violation issued (HPD, closed)
C
03/22/2024
Violation issued (HPD, closed)
B
03/22/2024
Violation issued (HPD, closed)
B
03/22/2024
Violation issued (HPD, closed)
B
03/22/2024
Violation issued (HPD, closed)
B
03/22/2024
Violation issued (HPD, closed)
C
03/13/2024
Cycle 9 facade report submitted
02/09/2024
Signed off — Alteration CO
Application filed in conjunction with ALT1 #M00742930-I1 TO LEGALIZE PLUMBING FIXTURES, CAP, AND REMOVE FIXTURES AS PER PLAN.
M00742930-S1
02/02/2024
Signed off — Alteration
M08049487-I1
01/17/2024
Cycle 9 facade inspection completed
11/14/2023
Violation issued (HPD, closed)
C
11/02/2023
Violation issued (HPD, closed)
A
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedShane Walters12/23/2024
DOB NOWPlumbingSigned-offOsso Plumbing & Heating05/13/2024
DOB NOWSidewalk ShedSigned-offMetro Contracting NY09/11/2023
DOB NOWPlumbingSigned-offLloyd G Drummond Plumbing & Gen05/30/2023
DOB NOWPlumbingSigned-offLloyd G Drummond Plumbing & Gen05/24/2023
DOB NOWSupported ScaffoldSigned-offSardar Restoration04/19/2023
DOB NOWGeneral ConstructionPermit IssuedShane Walters04/02/2023
DOB NOWGeneral ConstructionSigned-offSardar Restoration03/14/2023
DOB NOWPlumbingSigned-offLloyd G Drummond Plumbing & Gen10/26/2022
DOB NOWSidewalk ShedSigned-offMetro Contracting NY09/12/2022
DOB NOWGeneral ConstructionPermit IssuedShane Walters08/29/2022
DOB NOWPlumbingSigned-offLloyd G Drummond Plumbing & Gen06/23/2022
DOB NOWGeneral ConstructionSigned-offShane Walters05/11/2022
BISPLISSUEDOsso Plumbing & Heating06/03/2025
BISOTISSUEDShane Walters03/18/2025
BISPLISSUEDOsso Plumbing & Heating03/17/2025
BISOTISSUEDShane Walters03/17/2025
BISPLISSUEDOsso Plumbing & Heating03/14/2025
BISOTISSUEDNY Maintenance03/30/2022
BISPLISSUEDOrbit Plumbing & Heating01/20/2022
BISOTISSUEDNY Maintenance06/10/2020
BISPLISSUEDWasoff Plumbing & Utility Co11/08/2017
BISPLISSUEDWasoff Plumbing & Utility Co08/17/2017
BISOTISSUEDLee & Company of NY07/12/2017
BISOTISSUEDLee & Company of NY08/17/2016
BISPLISSUEDSenid PL & Heating12/09/2014
BISPLISSUEDSenid PL & Heating12/09/2014
BISPLISSUEDSenid PL & Heating11/20/2014
BISPLISSUEDSenid PL & Heating10/11/2013
BISPLISSUEDSenid PL & Heating10/11/2013
BISPLISSUEDSenid PL & Heating10/11/2013
BISPLISSUEDSenid PL & Heating10/11/2013
BISPLISSUEDSenid PL & Heating07/22/2013
BISPLISSUEDSenid PL & Heating07/16/2013
BISEQISSUEDRock Group NY03/29/2013
BISEQISSUEDRock Scaffolding02/12/2013
BISPLISSUEDSenid PL & Heating09/21/2012
BISPLISSUEDSenid PL & Heating09/21/2012
BISPLISSUEDSenid PL & Heating09/12/2012
BISPLISSUEDSenid PL & Heating09/12/2012
+ 23 more permits on file
1 project · most recent 09/14/2026
Water/Sanitary
FiledStatusContractorScope
09/14/2026Signed-offLloyd G Drummond Plumbing & GenWater/Sanitary
7 projects · most recent 10/29/2024
General Wiring
FiledStatusContractorScope
10/29/2024CompleteFried Electric CoGeneral Wiring
08/14/2024CompleteV. Vass ElectricGeneral Wiring
01/06/2024CompleteFried Electric CoGeneral Wiring
06/14/2023CompleteFried Electric CoGeneral Wiring
08/18/2022CompleteRichard Neu—
07/13/2022CompleteRobert Chimenti40 meters, 1 new_meters
05/09/2019CompleteV. Vass ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/01/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/05/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/08/2025Fail-Final CND-Occupancy InspectionFailView ↗
07/23/2024Fail-Final General Construction Non-Directive 14FailView ↗
06/10/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/04/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
04/18/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/24/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
09/11/2026Lighting in dwelling unitsMD-SHAMIM AKONDenergy_progress
09/11/2026Fire-Resistant Penetrations and JointsSamy Abouzidspecial
08/07/2026Fire-Resistant Penetrations and JointsSamy Abouzidspecial
08/07/2026Lighting in dwelling unitsMD-SHAMIM AKONDenergy_progress
12/16/2022Tenant Protection Plan ComplianceFAHAD FATEHspecial
12/05/2022MasonryRICHARD KOENIGSBERGspecial
12/05/2022Post-installed AnchorsRICHARD KOENIGSBERGspecial
12/05/2022Structural Stability – Alterations of existing buildingsRICHARD KOENIGSBERGspecial
12/05/2022FinalRICHARD KOENIGSBERGprogress
04/10/2022Lighting in dwelling unitsMANSUR AHMEDenergy_progress
04/10/2022Fire-Resistant Penetrations and JointsMANSUR AHMEDspecial
▾Documents — 282 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/02/2026M00705682-S1Request digital key ↗
09/02/2026M00705682-P2Request digital key ↗
09/02/2026M00705682-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits73
▸BISPLAN / WORK APPROVAL APPLICATION33
07/25/2025120215695Open ↗
05/30/2025120215695Open ↗
05/27/2025122765720Open ↗
Showing 3 of 33 on file for this type
▸BISWORK PERMIT APPLICATION30
06/04/2025120215695Open ↗
03/18/2025122765720Open ↗
03/18/2025121276207Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWLPC Approval/Permit10
10/05/2026M00742930-P4Open ↗
08/17/2026M00742930-P2Open ↗
08/13/2026M00705682-S1Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications44
▸DOB NOWDPL-1: Design Professional Seal & Signature13
10/05/2026M00742930-P4Open ↗
09/02/2026M00705682-P1Open ↗
09/02/2026M00705682-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
06/12/2020123370823Open ↗
05/13/2019123370823Open ↗
10/29/2018123370823Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
10/05/2026M00742930-P4Open ↗
09/27/2026M08049487-I1Open ↗
09/27/2026M08049487-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
06/12/2017121276207Open ↗
08/08/2016122765720Open ↗
09/08/2015122461022Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
10/05/2026M00742930-P4Open ↗
09/27/2026M08049487-I1Open ↗
09/02/2026M00742930-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/12/2017121276207Open ↗
08/08/2016122765720Open ↗
09/08/2015122461022Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
04/01/2013121573350Open ↗
02/15/2013121530584Open ↗
▸Trade Schedules & Equipment20
▸BISSCHEDULE B - PLUMBING11
05/19/2025122765720Open ↗
01/07/2025121276207Open ↗
08/24/2022123370823Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
10/29/2018123370823Open ↗
06/12/2017121276207Open ↗
08/08/2016122765720Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
04/15/2015120215695Open ↗
04/01/2015120215695Open ↗
02/02/2015101316700Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes3
06/12/2017121276207Open ↗
08/08/2016122765720Open ↗
06/30/2021123370823Open ↗
▸DOB NOWStreet Tree Checklist3
10/05/2026M00742930-P4Open ↗
08/17/2026M00742930-P2Open ↗
08/13/2026M00742930-I1Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
06/01/2021123370823Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
10/05/2026M00742930-P4Open ↗
09/02/2026M00705682-S1Open ↗
09/02/2026M00705682-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
06/12/2020123370823Open ↗
06/12/2017121276207Open ↗
08/08/2016122765720Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
06/12/2020123370823Open ↗
10/29/2018123370823Open ↗
06/12/2017121276207Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
09/02/2025122765720Open ↗
05/22/2025123370823Open ↗
05/01/2025121276207Open ↗
▸BISINTERIOR LIGHTING POWER2
09/02/2025122765720Open ↗
05/01/2025121276207Open ↗
▸BISLIGHTING IN DWELLING UNITS2
09/02/2025122765720Open ↗
05/01/2025121276207Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
09/02/2025122765720Open ↗
05/01/2025121276207Open ↗
▸BISLIGHTING CONTROLS2
09/02/2025122765720Open ↗
05/01/2025121276207Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
09/02/2026M00705682-I1Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY8
05/22/2025123370823Open ↗
12/16/2024121276207Open ↗
12/15/2024122765720Open ↗
Showing 3 of 8 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
09/02/2025122765720Open ↗
05/22/2025123370823Open ↗
05/01/2025121276207Open ↗
▸Approvals, Objections & Sign-offs25
▸BISSUPERSEDING LETTER8
06/04/2025120215695Open ↗
03/18/2025122765720Open ↗
03/18/2025121276207Open ↗
Showing 3 of 8 on file for this type
▸BISLANDMARKS APPROVAL5
03/21/2019123370823Open ↗
06/12/2017121276207Open ↗
08/08/2016122765720Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
04/01/2013121573350Open ↗
02/15/2013121530584Open ↗
10/25/2011120870833Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL3
09/02/2025122765720Open ↗
05/22/2025123370823Open ↗
05/01/2025121276207Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
09/02/2025122765720Open ↗
05/23/2025123370823Open ↗
05/05/2025121276207Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/21/2017121276207Open ↗
▸BISLANDMARKS SIGNOFF1
05/23/2025123370823Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT6
10/29/2018123370823Open ↗
06/12/2017121276207Open ↗
08/08/2016122765720Open ↗
Showing 3 of 6 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
06/12/2020123370823Open ↗
06/10/2020123370823Open ↗
08/31/2016122765720Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW33
09/02/2025122765720Open ↗
05/22/2025123370823Open ↗
05/01/2025121276207Open ↗
▸Filing & Intake Forms36
▸BISADDITIONAL INFORMATION21
07/29/2025120215695Open ↗
07/29/2025120215695Open ↗
05/27/2025122765720Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING COVER SHEET8
10/29/2018123370823Open ↗
06/12/2017121276207Open ↗
08/08/2016122765720Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM7
03/18/2025122765720Open ↗
03/18/2025121276207Open ↗
03/30/2022123370823Open ↗
Showing 3 of 7 on file for this type
▸Other Documents6
▸DOB NOWProperty Ownership Certification3
10/05/2026M00742930-P4Open ↗
08/17/2026M00742930-P2Open ↗
08/13/2026M00742930-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
06/12/2020123370823Open ↗
06/12/2020123370823Open ↗
▸BISHPD: CONH PILOT1
07/09/2025120215695Open ↗