← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Bleeker Grove Condominium
312 BLEECKER STREET · BIN 1076842
💬 Discuss this project
1847Year Built
4Stories
RMBuilding Class
C1-6Zoning
6,507 sfGross Floor Area
8Units
Rent Stabilized9 Open Violations 6 unresolved · 3 paperwork only ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: BLEECKER GROVE CONDOMINIUM · 3,320 sf lot · 1.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionGeneral
Roof1p · 1 filing · 6 docs
Floor 22p · 1 filing · 11 docs
Floor 19p · 4 filings · 20 docs
Cellar19p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BARRACCO REALTY3807/08/2026
KOONTZ103/22/2026
LATRE ENTERPRISE103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MIRELLA BOSELLI ARCHITECT705/06/2025
MOTTOLA RINI ENGINEERS504/02/2024
A DEGREE OF FREEDOM STRUCTURAL ENGI210/03/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BLEECKER ST MERCHANTS803/21/2026
EDI CONSULTING GROUP2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CPM BUILDERS INCGeneral Contractor1107/08/2026
NYC PLUMBING & HEATING INPlumbing207/08/2026
MAUCERI NICHOLASElectrical103/21/2026
NICHOLAS MAUCERIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MOTTOLA RINI ENGINEERS, P3251203/04/2024
A DEGREE OF FREEDOM STRUC925210/03/2022
MIRELLA BOSELLI R.A.6330104/20/2022
Building Lifecycle
All (91)Filed (14)Permit Issued (10)Signed Off (5)Violation (21)Inspection (10)Objection (16)Special Inspection (15)
07/24/2025
Signed off — Alteration
INTERIOR RENOVATION TO EXST. COMMERCIAL SPACE AT CELLAR & 01 FL. WORK TO INCLUDE REMOVAL OF NON-LOAD BEARING PARTITIONS, FLOOR, DOORS, & FINISHES, AS PER PLANS. PLUMBING FILED UNDER #M00524918. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00565804-I1
05/06/2025
Filed — Alteration
INTERIOR RENOVATION TO EXST. COMMERCIAL SPACE AT CELLAR & 01 FL. WORK TO INCLUDE REMOVAL OF NON-LOAD BEARING PARTITIONS, FLOOR, DOORS, & FINISHES, AS PER PLANS. PLUMBING FILED UNDER #M00524918. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00565804-P1
03/11/2025
Special inspection requirement — Final
Mirella Boselli
03/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Mirella Boselli
04/16/2024
Violation issued (HPD, closed)
A
04/08/2024
Signed off — Alteration
INTERIOR PLUMBING WORK IN CONNECTION WITH INTERIOR COMMERCIAL SPACE RENOVATION. CHANGES TO PLUMBING FIXTURES PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THISAPPLICATION.
M00708968-I1
04/02/2024
Filed — Alteration
INTERIOR PLUMBING WORK IN CONNECTION WITH INTERIOR COMMERCIAL SPACE RENOVATION. CHANGES TO PLUMBING FIXTURES PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THISAPPLICATION.
M00708968-P2
04/02/2024
Signed off — Alteration
REPLACING EXISTING WALL-MOUNTED FLUE WITH NEW, RUNNING IT UP THE REAR FACADE ADJACENT TO THE NORTHWEST CORNER, AND PROJECTING THREE (3) FEET ABOVE THE PARAPET, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00652002-I1
04/02/2024
Signed off — Alteration
STRUCTURAL WORK AT CELLAR AND FIRST FLOOR TO INCLUDE REPAIR OF SLAB AND FOUNDATION OF AN EXISTING REAR ADDITION AND CREATE AN OPENING FOR NRE STAIR BETWEEN CEL & 01 FL. AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATIO
M00708953-I1
04/01/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/13/2024
Signed off — Alteration
new air conditioning & kitchen ventilation systems for renovated restaurant space as indicated on plans.
M00710065-I1
03/11/2024
Special inspection requirement — Mechanical Systems
Anthony Rini, III
03/11/2024
Special inspection requirement — Final
Anthony Rini, III
03/04/2024
Filed — Alteration
new air conditioning & kitchen ventilation systems for renovated restaurant space as indicated on plans.
M00710065-P1
03/04/2024
Special inspection requirement — Final
Anthony Rini, III
03/04/2024
Special inspection requirement — Mechanical Systems
Anthony Rini, III
02/27/2024
Special inspection requirement — Public Assembly Emergency Lighting
Mirella Boselli
02/20/2024
Objection resolved — Addressed
02/09/2024
Objection raised — Other
02/05/2024
Objection resolved — Addressed
01/31/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/31/2024
Objection raised — Other
01/29/2024
Permit issued — Mechanical Systems
M00710065-I1-MS
01/24/2024
Filed — No Work
M00697436-P2
01/24/2024
Special inspection requirement — Public Assembly Emergency Lighting
Mirella Boselli
01/18/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/26/2023
Permit issued — General Construction
M00655806-I1-GC
10/19/2023
Objection resolved — Addressed
10/19/2023
Objection resolved — Addressed
10/18/2023
Objection raised — Scope
10/18/2023
Objection raised — Structural
10/09/2023
Filed — No Work
M00697436-P1
09/27/2023
Special inspection requirement — Public Assembly Emergency Lighting
Mirella Boselli
07/05/2023
Filed — Alteration
INTERIOR PLUMBING WORK IN CONNECTION WITH INTERIOR COMMERCIAL SPACE RENOVATION. CHANGES TO PLUMBING FIXTURES PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THISAPPLICATION.
M00708968-P1
04/26/2023
Permit issued — Plumbing
M00708968-I1-PL
03/29/2023
Violation issued (HPD, closed)
A
02/07/2023
Permit issued — General Construction
M00565804-I1-GC
02/07/2023
Permit issued — General Construction
M00565804-I1-GC
01/25/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/13/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/07/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dominic Cullen
10/07/2022
Special inspection requirement — Final
Dominic Cullen
10/07/2022
Special inspection requirement — Masonry
Dominic Cullen
10/07/2022
Special inspection requirement — Concrete - Cast-In-Place
Dominic Cullen
10/07/2022
Special inspection requirement — Post-installed Anchors
Dominic Cullen
10/05/2022
Objection resolved — Addressed
10/04/2022
Objection raised — Scope
10/03/2022
Filed — Alteration
STRUCTURAL WORK AT CELLAR AND FIRST FLOOR TO INCLUDE REPAIR OF SLAB AND FOUNDATION OF AN EXISTING REAR ADDITION AND CREATE AN OPENING FOR NRE STAIR BETWEEN CEL & 01 FL. AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATIO
M00708953-P1
09/06/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/25/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/10/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/10/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/06/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/23/2022
Filed — Alteration
new air conditioning & kitchen ventilation systems for renovated restaurant space as indicated on plans.
M00710065-I1
05/12/2022
Permit issued — Structural
M00708953-I1-ST
05/11/2022
Permit issued — General Construction
M00652002-I1-GC
04/27/2022
Permit issued — Plumbing
M00708968-I1-PL
04/20/2022
Filed — Alteration CO
M00655806-I1
04/08/2022
Filed — Alteration
STRUCTURAL WORK AT CELLAR AND FIRST FLOOR TO INCLUDE REPAIR OF SLAB AND FOUNDATION OF AN EXISTING REAR ADDITION AND CREATE AN OPENING FOR NRE STAIR BETWEEN CEL & 01 FL. AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATIO
M00708953-I1
04/07/2022
Filed — Alteration
INTERIOR PLUMBING WORK IN CONNECTION WITH INTERIOR COMMERCIAL SPACE RENOVATION. CHANGES TO PLUMBING FIXTURES PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THISAPPLICATION.
M00708968-I1
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMEDCON SERVICES, LLC01/29/2024
DOB NOWGeneral ConstructionPermit IssuedMEDCON SERVICES, LLC10/26/2023
DOB NOWPlumbingSigned-offNYC PLUMBING & HEATING IN04/26/2023
DOB NOWGeneral ConstructionSigned-offMEDCON SERVICES, LLC02/07/2023
DOB NOWGeneral ConstructionSigned-offMEDCON SERVICES, LLC02/07/2023
DOB NOWStructuralSigned-offMEDCON SERVICES, LLC05/12/2022
DOB NOWGeneral ConstructionSigned-offMEDCON SERVICES, LLC05/11/2022
DOB NOWPlumbingSigned-offNYC PLUMBING & HEATING IN04/27/2022
DOB NOWGeneral ConstructionSigned-offMEDCON SERVICES, LLC09/29/2021
DOB NOWGeneral ConstructionSigned-offMEDCON SERVICES, LLC08/23/2021
BISOTISSUEDGREAT AMERICAN CONTRACTIN10/22/2013
BISFPISSUEDACTIVE FIRE CONTROL, INC08/03/2009
BISPLISSUEDFORTE EXPRESS P & H INC05/22/1995
BISFPISSUEDACTIVE FIRE EXTINGUISHER INC.09/07/1993
BISOTISSUEDGLEEN PARTIONS INC08/06/1993
1 project · most recent 02/18/2023
General Wiring Lighting
FiledStatusContractorScope
02/18/2023Permit IssuedJURGEN H. WRIEDT ELEC INCGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/01/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/31/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/18/2024Fail-Final CND-Occupancy InspectionFailView ↗
01/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/25/2022Pass-Final PL - UndergroundPassView ↗
06/10/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
03/11/2025FinalMirella Boselliprogress
03/11/2025Energy Code Compliance InspectionsMirella Boselliprogress
03/11/2024Mechanical SystemsAnthony Rini, IIIspecial
03/11/2024FinalAnthony Rini, IIIprogress
03/04/2024FinalAnthony Rini, IIIprogress
03/04/2024Mechanical SystemsAnthony Rini, IIIspecial
02/27/2024Public Assembly Emergency LightingMirella Boselliprogress
01/24/2024Public Assembly Emergency LightingMirella Boselliprogress
09/27/2023Public Assembly Emergency LightingMirella Boselliprogress
10/07/2022Structural Stability – Alterations of existing buildingsDominic Cullenspecial
10/07/2022FinalDominic Cullenprogress
10/07/2022MasonryDominic Cullenspecial
10/07/2022Concrete - Cast-In-PlaceDominic Cullenspecial
10/07/2022Post-installed AnchorsDominic Cullenspecial
12/21/2021FinalAnthony Rini, IIIprogress
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch11
09/03/2026M00565804-P1Request digital key ↗
09/03/2026M00565804-I1Request digital key ↗
09/02/2026M00708968-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
08/28/2026M00697436-I1Request digital key ↗
08/15/2026M00697436-P1Request digital key ↗
08/14/2026M00697436-P2Request digital key ↗
▸Applications & Permits16
▸DOB NOWLPC Approval/Permit11
09/03/2026M00565804-P1Open ↗
09/03/2026M00565804-I1Open ↗
09/02/2026M00708968-P1Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
11/02/2013121737237Open ↗
08/21/2013121737237Open ↗
07/27/2009120108338Open ↗
▸BISWORK PERMIT APPLICATION2
10/23/2013121737237Open ↗
08/04/2009120108338Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026M00655806-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 11
08/13/2026M00655806-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026M00655806-I1Open ↗
▸Seals & Professional Certifications29
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/03/2026M00565804-I1Open ↗
09/03/2026M00565804-P1Open ↗
09/03/2026M00652002-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026M00697436-I1Open ↗
09/01/2026M00710065-I1Open ↗
09/01/2026M00697436-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M00710065-I1Open ↗
08/30/2026M00710065-P1Open ↗
08/23/2026M00708953-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/21/2013121737237Open ↗
07/27/2009120108338Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
12/10/2018121189187Open ↗
▸DOB NOWStreet Tree Checklist1
09/02/2026M00655806-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/03/2026M00565804-P1Open ↗
09/03/2026M00565804-I1Open ↗
09/02/2026M00708968-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/27/2009120108338Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/21/2013121737237Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/28/2020120108338Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLANDMARKS APPROVAL1
10/24/2013121737237Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/27/2009120108338Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/28/2020120108338Open ↗
▸BISFIRE SUPPRESSION SYSTEM (FP) SIGNOFF1
09/28/2020120108338Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
10/24/2013121737237Open ↗
08/21/2013121737237Open ↗
07/27/2009120108338Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/28/2020120108338Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
08/21/2013121737237Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M00708953-P1Open ↗
▸Other Documents10
▸DOB NOWProof of Historic Building6
09/02/2026M00708968-P1Open ↗
09/02/2026M00708968-I1Open ↗
08/27/2026M00710065-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026M00655806-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026M00655806-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026M00655806-I1Open ↗
▸DOB NOWProperty Ownership Certification1
09/02/2026M00655806-I1Open ↗