← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
312 BROADWAY
BROOKLYN · BIN 3426089
💬 Discuss this project
2019Year Built
6Stories
RMBuilding Class
PARKZoning
34,022 sfGross Floor Area
27Units
LL97 CoveredRent Stabilized1 Open Violation ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 302 BROADWAY LLC · 5,905 sf lot · 5.76 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Floor 213p · 1 filing · 20 docs
Floor 113p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WIFI CONSTRUCTION1507/08/2026
302 BROADWAY7807/08/2026
AVIEW BUILDERS803/22/2026
STREKTE203/22/2026
312 BROADWAY, LLC103/22/2026
ALPHA ELEVATOR, INC.103/22/2026
SSP CONSTRUCTION403/21/2026
OWNERS REP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CLUNE CONSTRUCTION CO LPGeneral Contractor1007/08/2026
EXPERT CONSTRUCTION & RE*General Contractor603/21/2026
WIFI CONSTRUCTION LLCGeneral Contractor507/08/2026
MAN POWER ELECTRIC INCElectrical403/22/2026
STREKTE CORPGeneral Contractor203/21/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
ASCUATECH ELECTRICAL CORPElectrical103/22/2026
MAC FELDER INCPlumbing107/08/2026
R.C.M. ELECTRIC CORP.Electrical103/22/2026
SYED-NAQVI ALTAFElectrical103/21/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
METRO FIRE PROTECTION INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILROSE CONSULTANTS LLC2003604/02/2025
MWB ENGINEERING7942209/22/2022
RYAN SPECIAL ENGINEERING2018309/22/2022
Building Lifecycle
All (144)Filed (19)Permit Issued (13)Signed Off (13)Violation (33)Inspection (4)Objection (32)Special Inspection (30)
06/22/2026
Violation issued (HPD, closed)
C
06/06/2026
Violation issued (HPD, closed)
C
04/10/2026
Signed off — Alteration
SPRINKLER MODIFICATIONS AS PER DRAWINGS FILED HEREWITH (CITIBANK)
B01145689-I1
04/09/2026
Signed off — Alteration
CITIBANK--Plumbing modifications and installations for bank build-out.
B01073846-S2
03/27/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/11/2025
Violation issued (FDNY_NOV, closed)
04/14/2025
Signed off — Alteration
B01073901-I1
04/07/2025
Special inspection requirement — Final
Christopher Drutjons
04/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Drutjons
04/02/2025
Filed — Alteration
B01073901-P1
03/26/2025
Signed off — Alteration
CITIBANK--Plumbing modifications and installations for bank build-out.
B01073846-S1
03/25/2025
Signed off — Alteration
CITIBANK--Plumbing modifications and installations for bank build-out.
B01073846-I1
03/10/2025
Signed off — Alteration
INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE AS PER DRAWINGS FILED HEREWITH
B01161249-I1
01/07/2025
Permit issued — Construction Fence
B01161249-I1-FN
01/02/2025
Filed — Alteration
INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE AS PER DRAWINGS FILED HEREWITH
B01161249-I1
01/02/2025
Violation issued (ECB, closed)
Construction
12/19/2024
Violation issued (ECB, closed)
Construction
12/18/2024
Permit issued — Sprinklers
B01145689-I1-EW-SP
12/11/2024
Filed — Alteration
SPRINKLER MODIFICATIONS AS PER DRAWINGS FILED HEREWITH (CITIBANK)
B01145689-I1
11/21/2024
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Drutjons
11/21/2024
Special inspection requirement — Sprinkler Systems
Christopher Drutjons
11/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/10/2024
Permit issued — Plumbing
B01073846-S2-PL
09/23/2024
Permit issued — Mechanical Systems
B01073846-S1-MS
09/23/2024
Permit issued — Structural
B01073901-I1-ST
09/23/2024
Permit issued — General Construction
B01073846-I1-GC
09/04/2024
Filed — Alteration
CITIBANK--Plumbing modifications and installations for bank build-out.
B01073846-S2
09/04/2024
Filed — Alteration
B01073901-I1
09/04/2024
Filed — Alteration
CITIBANK--Plumbing modifications and installations for bank build-out.
B01073846-S1
09/03/2024
Filed — Alteration
CITIBANK--Plumbing modifications and installations for bank build-out.
B01073846-I1
08/29/2024
Violation issued (HPD, open)
A
08/20/2024
Special inspection requirement — Lighting controls
Christopher Drutjons
08/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
08/20/2024
Special inspection requirement — Interior lighting power
Christopher Drutjons
08/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
08/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Drutjons
08/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
08/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Drutjons
08/20/2024
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
08/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
08/20/2024
Special inspection requirement — Maintenance information
Christopher Drutjons
06/28/2024
Special inspection requirement — Final
Christopher Drutjons
06/28/2024
Special inspection requirement — Mechanical Systems
Christopher Drutjons
10/13/2023
Violation issued (HPD, closed)
B
10/13/2023
Violation issued (HPD, closed)
B
09/14/2023
Violation issued (HPD, closed)
C
09/14/2023
Violation issued (HPD, closed)
C
08/16/2023
Special inspection requirement — Tenant Protection Plan Compliance
08/16/2023
Special inspection requirement — Sprinkler Systems
06/14/2023
Objection resolved — Addressed
06/14/2023
Objection resolved — Addressed
06/14/2023
Objection resolved — Addressed
06/14/2023
Objection resolved — Addressed
05/30/2023
Objection resolved — Addressed
05/26/2023
Objection resolved — Addressed
05/26/2023
Objection resolved — Addressed
05/20/2023
Objection resolved — Addressed
05/20/2023
Objection resolved — Addressed
Latest 60 of 144 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offCLUNE CONSTRUCTION CO LP01/07/2025
DOB NOWSprinklersSigned-offMETRO FIRE PROTECTION INC12/18/2024
DOB NOWPlumbingSigned-offMAC FELDER INC10/10/2024
DOB NOWMechanical SystemsSigned-offCLUNE CONSTRUCTION CO LP09/23/2024
DOB NOWStructuralSigned-offCLUNE CONSTRUCTION CO LP09/23/2024
DOB NOWGeneral ConstructionSigned-offCLUNE CONSTRUCTION CO LP09/23/2024
DOB NOWMechanical SystemsPermit IssuedEXPERT CONSTRUCTION & RE*02/15/2023
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC12/10/2022
DOB NOWGeneral ConstructionSigned-offEXPERT CONSTRUCTION & RE*07/22/2022
DOB NOWCurb CutSigned-offSTREKTE CORP08/04/2020
DOB NOWConstruction FenceSigned-offWIFI CONSTRUCTION LLC03/05/2020
DOB NOWSidewalk ShedSigned-offWIFI CONSTRUCTION LLC03/04/2020
DOB NOWSidewalk ShedSigned-offWIFI CONSTRUCTION LLC11/15/2019
BISOTISSUEDSTREKTE CORP12/21/2020
BISOTRE-ISSUEDSTREKTE CORP12/10/2020
BIS—ISSUEDSTREKTE CORP07/09/2020
BIS—ISSUEDAVIEW BUILDERS INC06/24/2020
BISPLISSUEDEMPIRE PLUMBING INC03/17/2020
BISSPISSUEDPIPING & PLUMBING SOLUTIO03/17/2020
BISSPISSUEDPRECISION PLBG SVCS., INC01/27/2020
BIS—ISSUEDAVIEW BUILDERS INC07/15/2019
BIS—ISSUEDAVIEW BUILDERS INC07/15/2019
BISEQISSUEDSSP CONSTRUCTION CORP04/03/2013
1 project · most recent 02/21/2023
Associated Ducts and Piping
FiledStatusContractorScope
02/21/2023——Associated Ducts and Piping
2 projects · most recent 02/21/2023
Sprinkler System
FiledStatusContractorScope
02/21/2023——Sprinkler System
09/22/2022——Sprinkler System
2 projects · most recent 02/21/2023
Water/Sanitary
FiledStatusContractorScope
02/21/2023——Water/Sanitary
09/22/2022Permit IssuedALL PRO PLBG & HTG INCWater/Sanitary
16 projects · most recent 10/08/2025
General Wiring
FiledStatusContractorScope
10/08/2025Permit IssuedJAM ELECTRICAL CORP—
10/08/2025Permit IssuedJAM ELECTRICAL CORP—
09/27/2024CompleteRX ELECTRIC INCGeneral Wiring
09/27/2024CompleteRX ELECTRIC INC—
11/10/2022Permit IssuedASCUATECH ELECTRICAL CORPGeneral Wiring
12/20/2021CompleteCITY GRID ELECTRIC CORP—
09/16/2020CompleteMAN POWER ELECTRIC INC27 meters, 27 new_meters
02/18/2020Permit IssuedISTRA ELEC'L CONTRS CORPGeneral Wiring
02/11/2020Permit IssuedR.C.M. ELECTRIC CORP.—
01/14/2020CompleteMAN POWER ELECTRIC INCGeneral Wiring
11/13/2019CompleteRICHARD NEU—
10/17/2019CompleteSEGA ELECTRIC LLC—
09/27/2019Permit IssuedR.C.M. ELECTRIC CORP.General Wiring
02/12/2019CompleteRICHARD NEU—
02/05/2019CompleteMAN POWER ELECTRIC INC—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/27/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
04/07/2025FinalChristopher Drutjonsprogress
04/07/2025Tenant Protection Plan ComplianceChristopher Drutjonsspecial
11/21/2024Tenant Protection Plan ComplianceChristopher Drutjonsspecial
11/21/2024Sprinkler SystemsChristopher Drutjonsspecial
08/20/2024Lighting controlsChristopher Drutjonsenergy_progress
08/20/2024HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
08/20/2024Interior lighting powerChristopher Drutjonsenergy_progress
08/20/2024HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
08/20/2024Tenant Protection Plan ComplianceChristopher Drutjonsspecial
08/20/2024HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
08/20/2024Tenant Protection Plan ComplianceChristopher Drutjonsspecial
08/20/2024Post-installed AnchorsChristopher Drutjonsspecial
08/20/2024Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
08/20/2024Maintenance informationChristopher Drutjonsenergy_progress
06/28/2024FinalChristopher Drutjonsprogress
06/28/2024Mechanical SystemsChristopher Drutjonsspecial
08/16/2023Tenant Protection Plan Compliance—special
08/16/2023Sprinkler Systems—special
01/23/2023Tenant Protection Plan Compliance—special
11/30/2022Tenant Protection Plan Compliance—special
10/24/2022Fire-Resistant Penetrations and Joints—special
10/24/2022Final—progress
10/24/2022Mechanical Systems—special
08/10/2022Sprinkler SystemsFLORINELA MURESANspecial
08/10/2022Fire-Resistant Penetrations and JointsWilliam Ryanspecial
Latest 25 of 36.
▾Documents — 311 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch14
09/02/2026B00062634-I1Request digital key ↗
08/28/2026B00767758-S4Request digital key ↗
08/28/2026B00767758-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/02/2026B00120286-I1Request digital key ↗
09/02/2026B00264758-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/02/2026B00120275-I1Request digital key ↗
09/02/2026B00322992-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/02/2026B00120279-I1Request digital key ↗
09/02/2026B00245101-I1Request digital key ↗
▸Applications & Permits70
▸BISPLAN / WORK APPROVAL APPLICATION54
05/06/2025340050223Open ↗
03/08/2023321499936Open ↗
10/31/2022321499936Open ↗
Showing 3 of 54 on file for this type
▸BISWORK PERMIT APPLICATION11
12/21/2020340723541Open ↗
12/10/2020340723569Open ↗
07/10/2020321499936Open ↗
Showing 3 of 11 on file for this type
▸BISPROOF CITY AGENCIES NOT PERMITED USE UNDER MARQUEE1
12/07/2020340723541Open ↗
▸BISPROOF CITY AGENCIES NOT PERMITTED USE UNDER MARQUEE1
12/07/2020340723569Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/24/2020321739053Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
07/12/2019340621072Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/05/2020321499936Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
06/24/2020322036337Open ↗
07/23/2018321499936Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION2
06/24/2020322036337Open ↗
07/23/2018321499936Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
06/24/2020322036337Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
06/24/2020322036337Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING DIAGRAM1
12/05/2018321499936Open ↗
▸Seals & Professional Certifications52
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/02/2026B00062634-I1Open ↗
09/02/2026B00120275-I1Open ↗
09/02/2026B00120279-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
08/29/2026B01073846-S1Open ↗
08/29/2026B01073846-S1Open ↗
08/25/2026B00767758-S4Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B01145689-I1Open ↗
08/29/2026B01073846-S1Open ↗
08/25/2026B00767758-S4Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
05/15/2020321499936Open ↗
05/15/2020321499936Open ↗
02/01/2020340591381Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
03/26/2020340723569Open ↗
03/26/2020340723541Open ↗
07/30/2018340621072Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment22
▸BISSCHEDULE B - PLUMBING10
06/25/2020321499936Open ↗
06/17/2020321499936Open ↗
11/02/2019340591381Open ↗
Showing 3 of 10 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
03/08/2023321739017Open ↗
11/22/2022321739026Open ↗
12/31/2020321739053Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
12/03/2018321499936Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
12/27/2019321499936Open ↗
▸BISSPRINKLER SYSTEMS1
07/31/2020340591381Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
09/18/2020321499936Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
09/18/2020321499936Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
09/18/2020321499936Open ↗
▸BISEQUIPMENT USE PERMITS1
09/18/2020321499936Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST3
12/05/2018321499936Open ↗
07/30/2018340621072Open ↗
Showing 2 of 3 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
07/12/2019340621072Open ↗
Showing 1 of 2 on file for this type
▸BISSTREET TREES SITE PLAN1
07/12/2019340621072Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
12/22/2020321499936Open ↗
10/19/2020321499936Open ↗
10/19/2020321499936Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
12/15/2021340723569Open ↗
02/24/2021321499936Open ↗
02/22/2021340723541Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/18/2019321499936Open ↗
Showing 1 of 2 on file for this type
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
09/30/2020321499936Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00767758-I1Open ↗
▸Inspections & Test Reports32
▸BISTECHNICAL REPORT: RESPONSIBILITY23
12/15/2021340723569Open ↗
12/15/2021340723569Open ↗
02/24/2021321499936Open ↗
Showing 3 of 23 on file for this type
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT3
05/07/2020321499936Open ↗
05/07/2020321499936Open ↗
05/07/2020321499936Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
12/06/2019321499936Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
09/17/2019340591381Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
07/18/2019321499936Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
07/18/2019321499936Open ↗
▸BISDEP Hydrant Flow Test Letter1
09/17/2019340591381Open ↗
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs30
▸BISLETTERS - SUPPORTING DOCUMENTATION10
01/08/2021321499936Open ↗
01/08/2021321499936Open ↗
01/08/2021321499936Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
10/31/2022321499936Open ↗
10/27/2022321499936Open ↗
10/27/2022321499936Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
06/22/2023321739017Open ↗
02/14/2023321739026Open ↗
12/16/2021340723569Open ↗
Showing 3 of 7 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL2
07/12/2019340621072Open ↗
Showing 1 of 2 on file for this type
▸BISMARQUEE (OT) SIGNOFF1
02/13/2023321499936Open ↗
▸BISHOUSE CONNECTION SIGNOFF1
05/13/2020321499936Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT-SPECIFIC GL INSURANCE2
07/10/2020321499936Open ↗
07/18/2019321499936Open ↗
▸BISCOST AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms41
▸BISADDITIONAL INFORMATION25
04/24/2023321499936Open ↗
03/31/2023321499936Open ↗
04/13/2021321499936Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING COVER SHEET9
06/09/2020322036337Open ↗
Showing 1 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
03/26/2020340723569Open ↗
03/26/2020340723541Open ↗
07/30/2018340621072Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
04/09/2020321499936Open ↗
03/05/2020321499936Open ↗
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
06/24/2020322036337Open ↗
06/24/2020322036337Open ↗
02/06/2020340621072Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM4
06/12/2020322036337Open ↗
06/09/2020322036337Open ↗
03/09/2020321499936Open ↗
Showing 3 of 4 on file for this type
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
06/24/2020322036337Open ↗
▸BISTCO - Supporting Documents1
01/08/2021321499936Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
07/18/2019321499936Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026B00120286-I1Open ↗