312 EAST 30 STREET
MANHATTAN · Murray Hill-Kips Bay · BIN 1069566
💬 Discuss this project
1986Year Built
18Stories
D6Building Class
R7BZoning
47,820 sfGross Floor Area
70Units
LL97 CoveredRent Stabilized4 Open Violations 3 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator apt, fireproof with stores · Owner of record: 312 EAST 30TH, LLC · 6,164 sf lot · 7.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof1p · 2 filings · 7 docs
Floor 27p · 2 filings · 11 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKAM ASSOCIATES1909/14/2026
BEB CAPITAL407/08/2026
312 EAST 30TH, LLC1603/22/2026
153 E 26 ST LLC403/22/2026
153 E 26TH ST LLC503/22/2026
312 EAST 30TH STREET103/22/2026
153 EAST 26TH ST LLC203/22/2026
B L MANAGEMENT1303/22/2026
OWNER OF 316 EATS 30 ST103/22/2026
BENALBI REALTY CO603/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.803/21/2026
HIERARCH-E203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
MMSR CONSULTING GROUP LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANNEX ENTERPRISE, INCGeneral Contractor303/21/2026
ABR PLBG&HTG CONTR INCPlumbing203/22/2026
CS BRIDGE CORPGeneral Contractor207/08/2026
SYNERGY CONSTRUCTION INCGeneral Contractor207/08/2026
JOSEPH BRAMANElectrical103/21/2026
MICHAEL SCIARAElectrical103/21/2026
DABROWSKI, ANDRZEJElectrical103/21/2026
AI FANG WUElectrical103/21/2026
KRESHNIK SMAJLAJGeneral Contractor107/08/2026
NORTHEAST SPECIALIST GROUPGeneral Contractor104/09/2026
EVANS, GABRIELElectrical103/21/2026
JOSEPH ALOIAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EOC-NY6548207/08/2026
TWIG SPECIAL INSPECTIONS885205/18/2026
Building Lifecycle
All (145)Filed (10)Permit Issued (7)Signed Off (5)Facade (FISP) (19)Violation (60)Objection (22)Special Inspection (22)
08/12/2026
Violation issued (ECB, open)
Elevators
07/29/2026
Violation issued (ECB, open)
Elevators
07/17/2026
Objection resolved — Addressed
07/17/2026
Objection resolved — Addressed
07/17/2026
Objection resolved — Addressed
07/17/2026
Objection resolved — Addressed
07/17/2026
Objection resolved — Open
07/08/2026
Filed — Alteration
FACADE RESTORATION AS PER PLANS
M01409551-I1
06/16/2026
Objection resolved — Addressed
06/16/2026
Objection resolved — Addressed
06/16/2026
Objection resolved — Open
06/16/2026
Objection resolved — Addressed
06/16/2026
Objection resolved — Open
06/11/2026
Violation issued (ECB, open)
Elevators
06/10/2026
Objection raised — Cost
06/10/2026
Objection raised — Scope
06/04/2026
Filed — Alteration CO
MECHANICAL WORK AT 2ND FLOOR.
M01325610-S4
06/01/2026
Objection raised — Zoning
06/01/2026
Objection raised — Accessibility
06/01/2026
Objection raised — Scope
06/01/2026
Objection raised — Structural
06/01/2026
Objection raised — Cost
06/01/2026
Objection raised — Scope
06/01/2026
Objection raised — Other
06/01/2026
Objection raised — Structural
06/01/2026
Objection raised — Other
06/01/2026
Objection raised — Energy
05/29/2026
Special inspection requirement — Masonry
David Merabyan
05/29/2026
Special inspection requirement — Final
David Merabyan
05/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Merabyan
05/29/2026
Special inspection requirement — Post-installed Anchors
David Merabyan
05/18/2026
Filed — Alteration CO
MECHANICAL WORK AT 2ND FLOOR.
M01325610-I1
04/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
04/23/2026
Special inspection requirement — Energy Code Compliance Inspections
04/22/2026
Special inspection requirement — Final
04/22/2026
Special inspection requirement — Mechanical Systems
04/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
Dave Wall
04/13/2026
Special inspection requirement — Lighting controls
04/13/2026
Special inspection requirement — Energy Code Compliance Inspections
04/13/2026
Special inspection requirement — Interior lighting power
03/25/2026
Signed off — Alteration
M01310331-I1
02/17/2026
Violation issued (ECB, closed)
Elevators
02/02/2026
Signed off — Alteration
FILING TO INCLUDE THE REMOVAL OF NON-BEARING WALLS, FINISHES, DOORS, & LIGHTING FORVACATED COMMERCIAL SPACE LOCATED IN BUILDING BASEMENT
M01236898-I1
01/07/2026
Permit issued — General Construction
M01310331-I1-GC
01/05/2026
Permit issued — General Construction
M01236898-I1-GC
12/22/2025
Violation issued (ECB, closed)
Elevators
11/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dave Wall
11/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
11/18/2025
Filed — Alteration
M01310331-I1
11/06/2025
Violation issued (ECB, closed)
Elevators
10/24/2025
Violation issued (ECB, closed)
Elevators
08/14/2025
Permit issued — General Construction
M01236898-I1-GC
08/01/2025
Filed — Alteration
FILING TO INCLUDE THE REMOVAL OF NON-BEARING WALLS, FINISHES, DOORS, & LIGHTING FORVACATED COMMERCIAL SPACE LOCATED IN BUILDING BASEMENT
M01236898-I1
07/09/2025
Violation issued (ECB, closed)
Elevators
06/05/2025
Special inspection requirement — Final
Marco Neves
Latest 60 of 145 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNORTHEAST SPECIALIST GROUP01/07/2026
DOB NOWGeneral ConstructionSigned-offSYNERGY CONSTRUCTION INC01/05/2026
DOB NOWGeneral ConstructionSigned-offSYNERGY CONSTRUCTION INC08/14/2025
DOB NOWGeneral ConstructionSigned-offKRESHNIK SMAJLAJ01/12/2024
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP04/06/2023
DOB NOWGeneral ConstructionSigned-offANNEX ENTERPRISE, INC07/08/2022
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP04/14/2022
BISOTISSUEDBURA CONSTRUCTION CORP12/15/2025
BISPLISSUEDBUDGET PLBG & HTG LLC07/23/2020
BISPLISSUEDBUDGET PLBG & HTG LLC03/05/2019
BISPLISSUEDTRI STATE PLBG & HTG INC07/10/2018
BISOTISSUEDFACADE SOLUTIONS INC04/06/2018
BISOTISSUEDFACADE SOLUTIONS INC03/29/2018
BISOTISSUEDFACADE SOLUTIONS INC03/29/2018
BISOTISSUEDFACADE SOLUTIONS INC10/18/2017
BISPLISSUEDTRI STATE PLBG & HTG INC04/06/2017
BISOTISSUEDFACADE SOLUTIONS INC04/06/2017
BISPLISSUEDTRI STATE PLBG & HTG INC03/31/2017
BISOTISSUEDFACADE SOLUTIONS INC03/31/2017
BISPLISSUEDBUDGET PLBG & HTG LLC01/04/2017
BISOTISSUEDEMPIRE CORE GROUP LLC10/20/2016
BISPLISSUEDWHITESTONE PLUMBING CORP09/02/2016
BISOTISSUEDEMPIRE CORE GROUP LLC08/15/2016
BISOTISSUEDBLUESTONE CONSTRUCTION AN04/22/2016
BISOTISSUEDMOON CONSTRUCTION INC12/15/2015
BISPLISSUEDMETRO INCORPORATED04/20/2011
BISSPISSUEDMETRO INCORPORATED04/20/2011
BISOTISSUEDB & L MANAGEMENT CO. LLC04/22/2010
BISMHISSUEDB & L MANAGEMENT CO. LLC04/20/2010
BISSPISSUEDMETRO INCORPORATED04/07/2010
BISPLISSUEDMETRO INCORPORATED01/21/2010
BISOTISSUEDB & L MANAGEMENT CO. LLC01/13/2010
BISOTISSUEDB & L MANAGEMENT CO. LLC08/19/2009
BISPLRE-ISSUEDMETRO INCORPORATED07/29/2008
BISOTISSUEDB & L MANAGEMENT CO. LLC05/23/2008
BISPLISSUEDULTIMATE PLBG AND HTG COR01/03/2008
BISOTISSUEDHANSA ELECTRIC, INC.12/20/2007
BISPLISSUEDTMJ PLUMBING & HEATING CORP.05/14/2007
BISOTISSUEDB & L MANAGEMENT CO. LLC05/10/2007
BISEQISSUEDCOLGATE SCAFF.EQU CORP05/04/2005
+ 3 more permits on file
1 project · most recent 06/04/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/04/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Ephoca EPOCHA AIO WALL-MOUNT #AWK-10 21,000 BTU ×6
EPOCHA AIO WALL-MOUNT #ADK-10R3-2 22,000 BTU ×4
EPOCHA AIO WALL-MOUNT #AWK-10R3 22,000 BTU ×1
Ventilation
Greenheck GREENHECK SP-AP-0511W1 Exhaust Fan ×5
1 project · most recent 06/04/2026
Water/Sanitary
FiledStatusContractorScope
06/04/2026——Water/Sanitary
4 projects · most recent 07/28/2026
General Wiring
FiledStatusContractorScope
07/28/2026CompleteLEADER ELECTRIC CO., INC2 meters, 2 new_meters
01/16/2026Permit IssuedNEE ELECTRICAL, LLC—
04/04/2022CompleteNASH ELECTRIC SERVICES IN—
05/20/2019Permit IssuedPAUL M. & SON'S ELECL CONGeneral Wiring
1 project · most recent 07/03/2024
FiledStatusContractorScope
07/03/2024Signed-offKRESHNIK SMAJLAJ—
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
05/29/2026MasonryDavid Merabyanspecial
05/29/2026FinalDavid Merabyanprogress
05/29/2026Tenant Protection Plan Compliance—special
05/29/2026Structural Stability – Alterations of existing buildingsDavid Merabyanspecial
05/29/2026Post-installed AnchorsDavid Merabyanspecial
04/29/2026Tenant Protection Plan Compliance—special
04/23/2026Fire-Resistant Penetrations and Joints—special
04/23/2026HVAC-R and service water piping design and insulation—energy_progress
04/23/2026HVAC-R and service water heating system controls—energy_progress
04/23/2026HVAC-R and service water heating equipment—energy_progress
04/23/2026Energy Code Compliance Inspections—progress
04/22/2026Final—progress
04/22/2026Mechanical Systems—special
04/21/2026Tenant Protection Plan ComplianceDave Wallspecial
04/13/2026Lighting controls—energy_progress
04/13/2026Energy Code Compliance Inspections—progress
04/13/2026Interior lighting power—energy_progress
11/26/2025Fire-Resistant Penetrations and JointsDave Wallspecial
11/26/2025Fire-Resistance Rated Construction—progress
06/05/2025FinalMarco Nevesprogress
05/17/2024FinalMarco Nevesprogress
05/06/2024FinalMarco Nevesprogress
▾Documents — 242 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/02/2026M00710970-I1Request digital key ↗
09/02/2026M00722333-I1Request digital key ↗
08/27/2026M00929308-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits44
▸BISWORK PERMIT APPLICATION24
12/15/2025140440146Open ↗
03/06/2019140440146Open ↗
07/10/2018140622360Open ↗
Showing 3 of 24 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION19
09/26/2025140440146Open ↗
08/14/2025140440146Open ↗
08/04/2025140440146Open ↗
Showing 3 of 19 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1131
04/11/2019140625376Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISZRD1-Zoning Resolution Determination1
07/29/2010120094771Open ↗
▸BISZoning Diagram (ZD1)1
06/29/2010120094771Open ↗
▸Seals & Professional Certifications45
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
03/06/2019140625376Open ↗
03/06/2019140625376Open ↗
10/23/2018140622360Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026M00929308-I1Open ↗
08/27/2026M00929308-S1Open ↗
08/27/2026M00929308-P1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
04/04/2017140625376Open ↗
03/28/2017140622360Open ↗
08/15/2016122862143Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
04/04/2017140625376Open ↗
03/28/2017140622360Open ↗
04/19/2016140477188Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
04/04/2017140625376Open ↗
03/28/2017140622360Open ↗
04/19/2016140477188Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026M00929308-P1Open ↗
09/01/2026M01236898-I1Open ↗
08/25/2026M00929308-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/15/2016122862143Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/31/2015140439531Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026M01409551-I1Open ↗
▸Trade Schedules & Equipment18
▸BISSCHEDULE B - PLUMBING9
08/14/2025140440146Open ↗
04/04/2017140625376Open ↗
03/28/2017140622360Open ↗
Showing 3 of 9 on file for this type
▸BISSELF-CERT PLUMBING NOTICE8
06/02/2011120242727Open ↗
06/25/2010120094771Open ↗
05/26/2010120242727Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/15/2016122862143Open ↗
▸Safety & Tenant Protection5
▸BISTENANT PROTECTION PLAN AND NOTES4
04/04/2017140625376Open ↗
03/28/2017140622360Open ↗
04/19/2016140477188Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Checklist1
08/15/2026M01325610-I1Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/27/2026M00929308-I1Open ↗
08/27/2026M00929308-P1Open ↗
08/20/2026M01310331-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
04/04/2017140625376Open ↗
03/28/2017140622360Open ↗
08/15/2016122862143Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
01/11/2010120242727Open ↗
05/07/2008110162092Open ↗
07/06/2009120094771Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
09/17/2025140440146Open ↗
08/14/2025140440146Open ↗
04/04/2017140625376Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
04/04/2017140625376Open ↗
03/28/2017140622360Open ↗
04/19/2016140477188Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/06/2019140625376Open ↗
10/23/2018140622360Open ↗
08/15/2016122862143Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
03/06/2019140625376Open ↗
10/23/2018140622360Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/19/2016140477188Open ↗
▸BISNYCECC ANALYSIS1
04/19/2016140477188Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY6
04/04/2017140625376Open ↗
03/28/2017140622360Open ↗
04/19/2016140477188Open ↗
Showing 3 of 6 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
04/19/2016140477188Open ↗
▸Approvals, Objections & Sign-offs19
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
04/08/2019140625376Open ↗
03/06/2019140625376Open ↗
10/23/2018140622360Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
03/06/2019140625376Open ↗
03/06/2019140625376Open ↗
04/05/2017140625376Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
01/11/2010120242727Open ↗
07/06/2009120094771Open ↗
Showing 2 of 3 on file for this type
▸BISSUPERSEDING LETTER2
12/15/2025140440146Open ↗
11/10/2016140440146Open ↗
▸BISCONSTRUCTION CODE DETERMINATION2
06/14/2010120094771Open ↗
07/29/2010120094771Open ↗
▸BISFINAL1
04/19/2016140477188Open ↗
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT17
03/06/2019140625376Open ↗
10/23/2018140622360Open ↗
04/04/2017140625376Open ↗
Showing 3 of 17 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST5
04/05/2017140625376Open ↗
03/29/2017140622360Open ↗
01/04/2017140440146Open ↗
Showing 3 of 5 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
04/04/2017140625376Open ↗
03/28/2017140622360Open ↗
08/19/2009120094771Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms18
▸BISEFILING JOB APPLICATION COVER SHEET6
04/04/2017140625376Open ↗
03/28/2017140622360Open ↗
04/19/2016140477188Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM5
04/11/2019140625376Open ↗
04/08/2019140625376Open ↗
03/06/2019140625376Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION4
09/26/2025140440146Open ↗
02/26/2019140625376Open ↗
02/08/2019140625376Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
08/15/2016122862143Open ↗
01/11/2010120242727Open ↗
Showing 2 of 3 on file for this type
▸Other Documents10
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
04/04/2017140625376Open ↗
04/04/2017140625376Open ↗
03/28/2017140622360Open ↗
Showing 3 of 7 on file for this type
▸BISSP/SD DEVICE CERT : LTR-LIC ELECT1
10/23/2018140622360Open ↗
▸DOB NOWIRA Certification1
08/13/2026M00929308-S1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026M01325610-I1Open ↗