💬 Discuss this project
2012Year Built
12Stories
W8Building Class
C8-4Zoning
101,243 sfGross Floor Area
1Units
LL97 Covered0 Active ViolationsFISP: SWARMP
Other private school · Owner of record: Trevor Day School · 10,465 sf lot · 9.67 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsTrevor Day School Upper3 filings
RoofTrevor Day School UpperUnder Construction1p · 4 filings · 13 docs
Floor 15Trevor Day School Upper1p · 1 filing · 3 docs
Floor 14
Floor 13
Floor 12
Floor 11Trevor Day School Upper7p · 4 filings · 17 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6Trevor Day School Upper7p · 3 filings · 17 docs
Floor 5
Floor 4Trevor Day School Upper1 filing · 2 docs
Floor 31p · 3 filings · 6 docs
Floor 2Trevor Day School Upper1 filing · 8 docs
Floor 1Trevor Day School Upper1p · 2 filings · 2 docs
Mezzanine3 filings · 6 docs
CellarTrevor Day School Upper4p · 4 filings · 14 docs
Site & exteriorTrevor Day School Upper4 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Trevor Day School7607/08/2026
TDS Acquisition403/21/2026
Truffa Day School403/21/2026
Ken-Kal Associates303/21/2026
East 95th203/21/2026
East 95th Street203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Walter T. Gorman, P.E305/14/2025
KN3 Engineering104/22/2024
Geiger Engineers104/10/2024
Tohfaz Uddin PE503/25/2024
MEP Geothermal Engineering705/25/2023
Format Architecture Office105/23/2023
G. Blinn Consulting101/31/2023
Silman206/08/2022
Aaris Design Architects106/01/2022
Pace Engineering107/18/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution403/21/2026
Walter T. Gorman, PE303/21/2026
DVA Advisors903/21/2026
William Vitacco Associates303/21/2026
Spring Scaffolding1003/21/2026
Eurocelt Expediting203/21/2026
A1 Expediting Service203/21/2026
Walter T Gorman Pepc303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S&E Bridge & ScaffoldScaffold709/09/2026
Spring ScaffoldingScaffold607/08/2026
JT Magen & CompanyGeneral Contractor507/08/2026
Skyline Restorationspecialty_contractor403/21/2026
Qwest ContractingGeneral Contractor307/08/2026
Republic Scaffold & HoistScaffold303/21/2026
Enobrac PlumbingFire Protection107/08/2026
Jte Electrical ServicesElectrical103/21/2026
Advanced Plumbing, Mechanical & SprinklerFire Protection107/08/2026
Enobrac PlumbingPlumbing107/08/2026
Top Shelf ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Soni Engineering Consulting9819103/13/2026
Leo Y Lee Associates2481104/22/2024
Skyline Engineering2671204/10/2024
G. Blinn Consulting2894101/31/2023
Building Lifecycle
All (173)Filed (24)Permit Issued (23)Signed Off (15)Facade (FISP) (3)Violation (60)Inspection (6)Objection (12)Special Inspection (30)
09/08/2026
Permit issued — Protection and Mechanical Methods
M00820075-I1-PMM
03/19/2026
Permit issued — Suspended Scaffold
M01370325-I1-SC
03/17/2026
Objection resolved — Addressed
03/16/2026
Objection raised — Other
03/13/2026
Filed — Alteration
M01370325-I1
03/11/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
03/11/2026
Special inspection requirement — Post-installed Anchors
nayan soni
09/12/2025
Permit issued — Protection and Mechanical Methods
M00820075-I1-PMM
05/14/2025
Filed — No Work
M01153238-I1
01/24/2025
Signed off — Alteration
General construction and structural work to include facade repairs as shown on plans (Local Law 11 - FISP CYC 9B).
M01030916-I1
01/08/2025
Permit issued — General Construction
M01030916-I1-ST
01/06/2025
Violation issued (ECB, closed)
Unknown
01/03/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
M01025220-I1
01/03/2025
Violation issued (ECB, closed)
Unknown
10/14/2024
Signed off — Alteration
Installation of suspended scaffold for facade work or insepction
M01038444-I1
09/27/2024
Permit issued — Protection and Mechanical Methods
M00820075-I1-PMM
06/07/2024
Filed — No Work
M00963169-I1
05/20/2024
Permit issued — Structural
M01030916-I1-GC
05/14/2024
Permit issued — Suspended Scaffold
M01038444-I1-SC
05/02/2024
Objection raised — Scope
05/02/2024
Objection resolved — Addressed
04/22/2024
Filed — Alteration
Installation of suspended scaffold for facade work or insepction
M01038444-I1
04/10/2024
Filed — Alteration
General construction and structural work to include facade repairs as shown on plans (Local Law 11 - FISP CYC 9B).
M01030916-I1
03/26/2024
Permit issued — Sidewalk Shed
M01025220-I1-SH
03/25/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
M01025220-I1
12/04/2023
Permit issued — Protection and Mechanical Methods
M00820075-I1-PMM
09/28/2023
Signed off — Alteration
Modifications to an existing sprinkler system
M00836080-I1
09/27/2023
Permit issued — Protection and Mechanical Methods
M00820075-I1-PMM
09/26/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
09/22/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/21/2023
Signed off — Alteration
Mechanical work as shown on plans (Trevor Day School).
M00836086-I1
09/21/2023
Signed off — Alteration
General construction work as shown on plans to include interior renovation to non-load bearing partitions and finishes. (Trevor Day School).
M00836070-I1
09/11/2023
Permit issued — Mechanical Systems
M00836086-I1-MS
06/23/2023
Permit issued — Sprinklers
M00836080-I1-EW-SP
06/07/2023
Filed — No Work
M00881565-I1
06/07/2023
Permit issued — General Construction
M00836070-I1-GC
05/25/2023
Filed — Alteration
Modifications to an existing sprinkler system
M00836080-I1
05/25/2023
Filed — Alteration
Mechanical work as shown on plans (Trevor Day School).
M00836086-I1
05/23/2023
Filed — Alteration
General construction work as shown on plans to include interior renovation to non-load bearing partitions and finishes. (Trevor Day School).
M00836070-I1
05/16/2023
Signed off — Alteration
Structural work as shown on plans.
M00713810-I1
05/16/2023
Signed off — Alteration
General construction work as shown on plans.
M00713060-I1
05/15/2023
Signed off — Alteration
Mechanical work as shown on plans.
M00718364-I1
05/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
Matthew Wavro
05/01/2023
Special inspection requirement — Energy Code Compliance Inspections
Matthew Wavro
05/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Matthew Wavro
05/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
Matthew Wavro
05/01/2023
Special inspection requirement — Maintenance information
Matthew Wavro
05/01/2023
Special inspection requirement — Shutoff dampers
Matthew Wavro
04/20/2023
Special inspection requirement — Lighting controls
Andrew McGee
04/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
04/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Andrew McGee
04/20/2023
Special inspection requirement — Interior lighting power
Andrew McGee
04/20/2023
Special inspection requirement — Final
Andrew McGee
03/07/2023
Permit issued — Protection and Mechanical Methods
M00820075-I1-PMM
02/28/2023
Special inspection requirement — Final
Matthew Wavro
02/28/2023
Special inspection requirement — Mechanical Systems
Matthew Wavro
02/27/2023
Special inspection requirement — Post-installed Anchors
GREG BLINN
02/24/2023
Signed off — Alteration
Plumbing work as shown on plans.
M00718346-I1
02/21/2023
Cycle 9 facade report submitted
02/18/2023
Cycle 9 facade report signed — SWARMP
Latest 60 of 173 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold09/08/2026
DOB NOWSuspended ScaffoldPermit IssuedSkyline Restoration03/19/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold09/12/2025
DOB NOWGeneral ConstructionSigned-offSkyline Restoration01/08/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold09/27/2024
DOB NOWStructuralSigned-offSkyline Restoration05/20/2024
DOB NOWSuspended ScaffoldSigned-offSkyline Restoration05/14/2024
DOB NOWSidewalk ShedSigned-offSpring Scaffolding03/26/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold12/04/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold09/27/2023
DOB NOWMechanical SystemsSigned-offQwest Contracting09/11/2023
DOB NOWSprinklersSigned-offAdvanced Plumbing, Mechanical & Sprinkler06/23/2023
DOB NOWGeneral ConstructionSigned-offQwest Contracting06/07/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold03/07/2023
DOB NOWSprinklersSigned-offEnobrac Plumbing07/12/2022
DOB NOWStructuralPermit IssuedJT Magen & Company06/09/2022
DOB NOWPlumbingSigned-offEnobrac Plumbing06/08/2022
DOB NOWGeneral ConstructionSigned-offJT Magen & Company06/07/2022
DOB NOWMechanical SystemsSigned-offJT Magen & Company06/07/2022
DOB NOWSidewalk ShedSigned-offSpring Scaffolding06/03/2022
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding06/03/2022
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding06/03/2022
DOB NOWSidewalk ShedSigned-offRepublic Scaffold & Hoist07/19/2018
BISPLISSUEDAdvanced Plumbing Mechanical08/28/2018
BIS—ISSUEDQwest Contracting08/03/2018
BIS—ISSUEDQwest Contracting08/03/2018
BIS—ISSUEDQwest Contracting05/02/2018
BISOTISSUEDNorth Shore Neon Sign02/10/2017
BIS—ISSUEDNorth Shore Neon Sign Co02/10/2017
BIS—ISSUEDNorth Shore Neon Sign Co02/10/2017
BIS—ISSUEDJT Magen & Company12/10/2015
BIS—ISSUEDJT Magen & Company03/20/2015
BISPLISSUEDAshland Plumbing03/16/2015
BISEQISSUEDAtlantic Hoisting & Scaff12/26/2014
BISEQISSUEDAtlantic Hoisting & Scaff12/26/2014
BISEQISSUEDAtlantic Hoisting & Scaff12/24/2014
BISSDISSUEDPreferred Sprinkler and Mechanical11/13/2014
BISSPISSUEDPreferred Sprinkler and Mechanical10/14/2014
BISEQISSUEDW & W Glass10/01/2014
BISMHISSUEDJT Magen & Company09/30/2014
+ 33 more permits on file
5 projects · most recent 10/02/2024
General Wiring
FiledStatusContractorScope
10/02/2024Permit IssuedTop Shelf Electric—
04/18/2024CompleteJte Electrical Services—
01/13/2023CompleteM.C. Electrical NYGeneral Wiring
05/02/2022CompleteTop Shelf Electric—
07/16/2018CompleteNash Electric Services—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/26/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/22/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/19/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/17/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
03/11/2026Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
03/11/2026Post-installed Anchorsnayan sonispecial
05/01/2023HVAC-R and service water heating system controlsMatthew Wavroenergy_progress
05/01/2023Energy Code Compliance InspectionsMatthew Wavroprogress
05/01/2023HVAC-R and service water piping design and insulationMatthew Wavroenergy_progress
05/01/2023HVAC-R and service water heating equipmentMatthew Wavroenergy_progress
05/01/2023Maintenance informationMatthew Wavroenergy_progress
05/01/2023Shutoff dampersMatthew Wavroenergy_progress
04/20/2023Lighting controlsAndrew McGeeenergy_progress
04/20/2023Fire-Resistant Penetrations and JointsMatthew Wavrospecial
04/20/2023Energy Code Compliance InspectionsAndrew McGeeprogress
04/20/2023Interior lighting powerAndrew McGeeenergy_progress
04/20/2023FinalAndrew McGeeprogress
02/28/2023FinalMatthew Wavroprogress
02/28/2023Mechanical SystemsMatthew Wavrospecial
02/27/2023Post-installed AnchorsGREG BLINNspecial
01/25/2023Fire-Resistant Penetrations and JointsMatthew Wavrospecial
11/10/2022Fire-Resistant Penetrations and JointsMatthew Wavrospecial
06/09/2022Structural Steel - WeldingMatthew Wavrospecial
06/09/2022Structural Stability – Alterations of existing buildingsMatthew Wavrospecial
06/09/2022FinalMatthew Wavroprogress
06/09/2022Structural Steel - DetailsMatthew Wavrospecial
06/09/2022Structural Steel - High Strength BoltingMatthew Wavrospecial
06/09/2022Post-installed AnchorsMatthew Wavrospecial
06/07/2022Post-installed AnchorsMatthew Wavrospecial
Latest 25 of 43.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Trevor Day School UpperEducationEntire building
Project M01370325 Alteration · Permit Entire · 03/13/2026
Project M01038444 Alteration · LOC Issued · 04/22/2024
Project M01030916 Alteration · LOC Issued · 04/10/2024
Project M01025220 Alteration · LOC Issued · 03/25/2024
Project M00836080 Alteration · LOC Issued · 05/25/2023
Project M00836086 Alteration · LOC Issued · 05/25/2023
Project M00836070 Alteration · LOC Issued · 05/23/2023
Project M00820075 Alteration · Permit Entire · 01/31/2023
Project M00763972 Alteration · LOC Issued · 07/07/2022
Project M00726611 Alteration · LOC Issued · 06/03/2022
Project M00726631 Alteration · LOC Issued · 06/03/2022
Project M00750642 Alteration · LOC Issued · 06/03/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 797 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch21
09/06/2026M00062432-I1Request digital key ↗
09/02/2026M00718364-I1Request digital key ↗
09/02/2026M00713060-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly3
08/31/2026M00881565-I1Request digital key ↗
08/27/2026M00963169-I1Request digital key ↗
08/23/2026M01153238-I1Request digital key ↗
▸Applications & Permits153
▸BISPLAN / WORK APPROVAL APPLICATION67
05/20/2020140902673Open ↗
05/24/2019110347250Open ↗
05/09/2019110347250Open ↗
Showing 3 of 67 on file for this type
▸BISWORK PERMIT APPLICATION66
08/28/2018123125947Open ↗
08/03/2018110347250Open ↗
05/02/2018110347250Open ↗
Showing 3 of 66 on file for this type
▸BISPLACE OF ASSEMBLY17
11/18/2025122037081Open ↗
05/14/2019122037081Open ↗
05/14/2019122037081Open ↗
Showing 3 of 17 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/05/2015110347250Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
04/10/2019110347250Open ↗
▸Seals & Professional Certifications216
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION113
05/14/2019122037081Open ↗
05/14/2019122037081Open ↗
08/21/2018123125947Open ↗
Showing 3 of 113 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
09/06/2026M00062432-I1Open ↗
09/02/2026M00713060-I1Open ↗
09/02/2026M00726611-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/01/2026M00713810-P1Open ↗
08/28/2026M00713060-I1Open ↗
08/28/2026M00713060-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/01/2026M00718346-P1Open ↗
09/01/2026M00713810-P1Open ↗
09/01/2026M00713810-P1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
08/21/2018123125947Open ↗
05/23/2016122769450Open ↗
05/23/2016122769423Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
05/20/2020140902673Open ↗
08/21/2018123125947Open ↗
05/23/2016122769450Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
05/20/2020140902673Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
05/20/2020140902673Open ↗
Showing 1 of 3 on file for this type
▸Trade Schedules & Equipment50
▸BISSELF-CERT PLUMBING NOTICE28
05/27/2015110347250Open ↗
05/27/2015110347250Open ↗
05/22/2015110347250Open ↗
Showing 3 of 28 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
08/21/2018123125947Open ↗
Showing 1 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
05/17/2017120834008Open ↗
Showing 1 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
12/22/2017110347250Open ↗
12/22/2017110347250Open ↗
▸BISEQUIPMENT USE PERMITS1
12/22/2017110347250Open ↗
▸Safety & Tenant Protection5
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
08/01/2017120652720Open ↗
08/01/2017120652720Open ↗
▸Environmental & Asbestos21
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/02/2026M00713060-I1Open ↗
09/02/2026M00713810-I1Open ↗
09/02/2026M00763972-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISRODENT CONTROL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance22
▸BISAS-BUILT ENERGY ANALYSIS5
03/07/2018122746993Open ↗
10/05/2015140261552Open ↗
07/13/2015140201680Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
08/21/2018123125947Open ↗
03/07/2018122769450Open ↗
03/07/2018122769423Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
05/20/2020140902673Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
05/20/2020140902673Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
09/02/2026M00713060-I1Open ↗
08/13/2026M00718364-I1Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEN1 - Energy Costs Budget Worksheet1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY4
05/20/2020140902673Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE-TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISConcrete Design Mix - 2008 CODE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs121
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST53
06/04/2019110347250Open ↗
05/14/2019110347250Open ↗
05/07/2019123125947Open ↗
Showing 3 of 53 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION19
05/14/2019122037081Open ↗
04/09/2019110347250Open ↗
05/02/2018110347250Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE18
01/23/2019110347250Open ↗
03/14/2018110347250Open ↗
09/04/2015110347250Open ↗
Showing 3 of 18 on file for this type
▸BISSUPERSEDING LETTER5
08/03/2018110347250Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
09/06/2026M00062432-I1Open ↗
08/13/2026M01030916-I1Open ↗
08/13/2026M01370325-I1Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
08/01/2017120652720Open ↗
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT12
05/20/2020140902673Open ↗
05/07/2019123125947Open ↗
08/21/2018123125947Open ↗
Showing 3 of 12 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE7
08/03/2018110347250Open ↗
05/02/2018110347250Open ↗
Showing 2 of 7 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE (PGLI)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
08/01/2017120652720Open ↗
▸Filing & Intake Forms92
▸BISADDITIONAL INFORMATION33
12/09/2025122037081Open ↗
05/02/2019123125947Open ↗
05/02/2019123125947Open ↗
Showing 3 of 33 on file for this type
▸BISEFILING COVER SHEET30
08/21/2018123125947Open ↗
05/23/2016122769450Open ↗
05/23/2016122769423Open ↗
Showing 3 of 30 on file for this type
▸BISBOROUGH INTAKE FORM23
06/04/2019110347250Open ↗
05/14/2019110347250Open ↗
05/09/2019110347250Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
05/20/2020140902673Open ↗
Showing 1 of 6 on file for this type
▸Other Documents45
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION38
05/14/2019122037081Open ↗
08/21/2018123125947Open ↗
08/08/2018123125947Open ↗
Showing 3 of 38 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026M01370325-I1Open ↗
08/13/2026M01038444-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M01038444-I1Open ↗
08/13/2026M01370325-I1Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type