← Back
Primarily 2 family with 1 store or office
312 TYSENS LANE
STATEN ISLAND · BIN 5058407
💬 Discuss this project
1960Year Built
2Stories
S2Building Class
R3XZoning
2,584 sfGross Floor Area
3Units
Primarily 2 family with 1 store or office · Owner of record: EDEN II SCHOOL FOR AUTISTIC CHILDREN, IN C. · 6,800 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Floor 24p · 2 filings · 20 docs
Floor 13p · 1 filing · 17 docs
Cellar4p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EDEN II SCHOOL FOR AUTIS1507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL DERUVO & ASSOC. ARCHITECTS302/01/2024
ANN FALUTICO ARCHITECT PC207/27/2023
MOTTOLA RINI ENGINEERS410/06/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IDA GALEA, ARCHITECT1203/21/2026
PATRICIA L. GASS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACTIVE PLBG & HTG CORPPlumbing207/08/2026
ACTIVE PLMBG & HTG CORPFire Protection107/08/2026
AHTRAM SERVICES CORPGeneral Contractor107/08/2026
KCM PLUMBING & HEATING COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IDA GALEA, ARCHITECT838207/27/2023
MOTTOLA RINI ENGINEERS, P3251410/06/2022
Building Lifecycle
All (58)Filed (9)Permit Issued (5)Signed Off (4)Inspection (10)Special Inspection (30)
02/09/2024
Signed off — Alteration
APPLICATION FILED HEREWITH TO INSTALL NEW 22 KW GAS FIRED ELECTRIC GENERATOR AT SIDE OF EXISTING BUILDING.
S00822644-I1
02/01/2024
Filed — Alteration
APPLICATION FILED HEREWITH TO INSTALL NEW 22 KW GAS FIRED ELECTRIC GENERATOR AT SIDE OF EXISTING BUILDING.
S00822644-P2
11/15/2023
Signed off — Alteration
SPRINKLER WORK IN CONJUNCTION WITH APPLICATION S00684925
S00684953-I1
11/01/2023
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH APPLICATION S00684925
S00684945-I1
10/02/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/19/2023
Filed — Alteration
APPLICATION FILED HEREWITH TO INSTALL NEW 22 KW GAS FIRED ELECTRIC GENERATOR AT SIDE OF EXISTING BUILDING.
S00822644-P1
08/18/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/31/2023
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
07/28/2023
Signed off — Alteration
APPLICATION FILED FOR INTERIOR & EXTERIOR RENOVATION TO EXISTING TWO FAMILY AS PER PLANS FILED HEREWITH. PLUMBING WORK FILED SEPARATELY. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
S00684925-I1
07/28/2023
Special inspection requirement — Concrete - Cast-In-Place
Ida Galea
07/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ida Galea
07/28/2023
Special inspection requirement — Energy Code Compliance Inspections
Ida Galea
07/28/2023
Special inspection requirement — Final
Ida Galea
07/28/2023
Special inspection requirement — Fire-Resistance Rated Construction
Ida Galea
07/28/2023
Special inspection requirement — Fenestration air leakage
Ida Galea
07/28/2023
Special inspection requirement — Interior lighting power
Ida Galea
07/28/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Ida Galea
07/28/2023
Special inspection requirement — Air barrier - visual inspection
Ida Galea
07/28/2023
Special inspection requirement — Fenestration areas
Ida Galea
07/27/2023
Filed — Alteration
APPLICATION FILED FOR INTERIOR & EXTERIOR RENOVATION TO EXISTING TWO FAMILY AS PER PLANS FILED HEREWITH. PLUMBING WORK FILED SEPARATELY. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
S00684925-P1
07/14/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/11/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/10/2023
Special inspection requirement — Concrete - Cast-In-Place
Ida Galea
07/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ida Galea
07/10/2023
Special inspection requirement — Energy Code Compliance Inspections
Ida Galea
07/10/2023
Special inspection requirement — Final
Ida Galea
07/10/2023
Special inspection requirement — Fire-Resistance Rated Construction
Ida Galea
07/10/2023
Special inspection requirement — Air barrier - visual inspection
Ida Galea
07/10/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Ida Galea
07/10/2023
Special inspection requirement — Interior lighting power
Ida Galea
07/10/2023
Special inspection requirement — Fenestration air leakage
Ida Galea
07/10/2023
Special inspection requirement — Fenestration areas
Ida Galea
06/21/2023
Permit issued — Plumbing
S00684945-I1-PL
06/21/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/20/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/09/2023
Permit issued — Plumbing
S00822644-I1-PL
02/08/2023
Filed — Alteration
APPLICATION FILED HEREWITH TO INSTALL NEW 22 KW GAS FIRED ELECTRIC GENERATOR AT SIDE OF EXISTING BUILDING.
S00822644-I1
10/06/2022
Filed — Alteration
SPRINKLER WORK IN CONJUNCTION WITH APPLICATION S00684925
S00684953-P1
10/06/2022
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH APPLICATION S00684925
S00684945-P1
10/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Rini, III
10/06/2022
Special inspection requirement — Energy Code Compliance Inspections
Anthony Rini, III
10/06/2022
Special inspection requirement — HVAC-R and service water heating system controls
Anthony Rini, III
10/06/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Anthony Rini, III
10/06/2022
Special inspection requirement — HVAC-R and service water heating equipment
Anthony Rini, III
10/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Rini, III
10/03/2022
Special inspection requirement — Energy Code Compliance Inspections
Anthony Rini, III
10/03/2022
Special inspection requirement — HVAC-R and service water heating equipment
Anthony Rini, III
10/03/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Anthony Rini, III
10/03/2022
Special inspection requirement — HVAC-R and service water heating system controls
Anthony Rini, III
09/23/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/01/2022
Permit issued — Sprinklers
S00684953-I1-EW-SP
08/31/2022
Permit issued — Plumbing
S00684945-I1-PL
07/28/2022
Filed — Alteration
SPRINKLER WORK IN CONJUNCTION WITH APPLICATION S00684925
S00684953-I1
07/28/2022
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH APPLICATION S00684925
S00684945-I1
07/28/2022
Permit issued — General Construction
S00684925-I1-GC
07/26/2022
Filed — Alteration
APPLICATION FILED FOR INTERIOR & EXTERIOR RENOVATION TO EXISTING TWO FAMILY AS PER PLANS FILED HEREWITH. PLUMBING WORK FILED SEPARATELY. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
S00684925-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offACTIVE PLBG & HTG CORP06/21/2023
DOB NOWPlumbingSigned-offKCM PLUMBING & HEATING CO02/09/2023
DOB NOWSprinklersSigned-offACTIVE PLMBG & HTG CORP09/01/2022
DOB NOWPlumbingSigned-offACTIVE PLBG & HTG CORP08/31/2022
DOB NOWGeneral ConstructionSigned-offAHTRAM SERVICES CORP07/28/2022
2 projects · most recent 03/28/2023
General Wiring
FiledStatusContractorScope
03/28/2023CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
02/08/2023CompleteAQUATECH MECH,PLBG & ELEC2 meters
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
10/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/18/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/31/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
07/14/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/11/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/21/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/20/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/23/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
07/28/2023Concrete - Cast-In-PlaceIda Galeaspecial
07/28/2023Fire-Resistant Penetrations and JointsIda Galeaspecial
07/28/2023Energy Code Compliance InspectionsIda Galeaprogress
07/28/2023FinalIda Galeaprogress
07/28/2023Fire-Resistance Rated ConstructionIda Galeaprogress
07/28/2023Fenestration air leakageIda Galeaenergy_progress
07/28/2023Interior lighting powerIda Galeaenergy_progress
07/28/2023Fenestration and door U-factor and product ratingsIda Galeaenergy_progress
07/28/2023Air barrier - visual inspectionIda Galeaenergy_progress
07/28/2023Fenestration areasIda Galeaenergy_progress
07/10/2023Concrete - Cast-In-PlaceIda Galeaspecial
07/10/2023Fire-Resistant Penetrations and JointsIda Galeaspecial
07/10/2023Energy Code Compliance InspectionsIda Galeaprogress
07/10/2023FinalIda Galeaprogress
07/10/2023Fire-Resistance Rated ConstructionIda Galeaprogress
07/10/2023Air barrier - visual inspectionIda Galeaenergy_progress
07/10/2023Fenestration and door U-factor and product ratingsIda Galeaenergy_progress
07/10/2023Interior lighting powerIda Galeaenergy_progress
07/10/2023Fenestration air leakageIda Galeaenergy_progress
07/10/2023Fenestration areasIda Galeaenergy_progress
10/06/2022Fire-Resistant Penetrations and JointsAnthony Rini, IIIspecial
10/06/2022Energy Code Compliance InspectionsAnthony Rini, IIIprogress
10/06/2022HVAC-R and service water heating system controlsAnthony Rini, IIIenergy_progress
10/06/2022HVAC-R and service water piping design and insulationAnthony Rini, IIIenergy_progress
10/06/2022HVAC-R and service water heating equipmentAnthony Rini, IIIenergy_progress
Latest 25 of 30.
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/24/2026S00684945-I1Request digital key ↗
08/24/2026S00684945-P1Request digital key ↗
08/23/2026S00684953-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature12
08/29/2026S00684945-I1Open ↗
08/29/2026S00684945-I1Open ↗
08/29/2026S00684945-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/24/2026S00684945-I1Open ↗
08/24/2026S00684945-P1Open ↗
08/22/2026S00684925-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026S00684945-I1Open ↗
08/27/2026S00684925-I1Open ↗
08/26/2026S00684945-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026S00684945-I1Open ↗
08/24/2026S00684945-P1Open ↗
08/22/2026S00684925-P1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026S00684945-I1Open ↗
08/13/2026S00684925-I1Open ↗