ECB06/25/2026ATOI, OBSERVED ONGOING CONSTRUCTION WORK ON THE SECOND FLOOR WITHOUT ANY PERMIT ON FILE FOR THE SCOPE OF WORK. IT APPEARS THAT STRUCTURAL BEAMS ARE BEING INSTALLED AND PARTITIONS ARE BEING REMOVED THROUGHOUT TH$2K due
HPD10/27/2005SECTION 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY ?11-06(B)(2) CEILING IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
HPD12/08/2001SECTION 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE all sty public hall
HPD10/25/2000SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILE IN THE BATHROOM LOCATED AT APT 2, 2nd STORY
HPD10/25/2000SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS CEILINGS &TRIM IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY
HPD10/25/2000SECTION 27-2005 ADM CODE PROPERLY SECURE THE LOOSE METAL KICK PLATE BUILDING ENTRANCE DOOR.
HPD10/25/2000SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS, CEILINGS & TRIM THROUGHOUT ALL STORIES, AT PUBLIC HALL
HPD10/25/2000SECTION 27-2005 ADM CODE PROPERLY SECURE THE LOOSE HANDRAILS 1ST &2ND STY AT PUBLIC HALL
HPD10/25/2000SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CAULKING AROUND WINDOW IN THE PRIVATE HALLWAY LOCATED AT APT 2, 2nd STORY
HPD10/25/2000SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILE IN THE BATHROOM LOCATED AT APT 2, 2nd STORY