Hospital, sanitarium, mental institution
MSHS. MSBI Fierman Hall
313 EAST 17 STREET · Gramercy · BIN 1020430
💬 Discuss this project
1965Year Built
12Stories
I1Building Class
R8AZoning
70,848 sfGross Floor Area
2Units
LL97 Covered4 Open Violations ▸FISP: SAFE
Hospital, sanitarium, mental institution · Owner of record: 317 EAST 17TH STREET LLC · 11,024 sf lot · 6.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 2 filings
Floor 81p · 1 filing
Floor 7
Floor 6
Floor 5
Floor 4
Floor 32p · 1 filing
Floor 22 filings
Floor 11 filing
Cellar1 filing
Site & exterior8 filings · 16 docs
Filed — no permit issued1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP5707/08/2026
CONTINUUM HEALTH PARTNERS503/21/2026
317 EAST 17TH STREET LLC103/22/2026
B CONTRACTORS GROUP103/22/2026
BETH ISRAEL HOSPITAL103/21/2026
MOUNT SINAI HEALTH SYSTEMS103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/16/2024$27.6M—Private party → 317 EAST 17TH STREET LLC$389/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION3203/21/2026
OUTSOURCE CONSULTANTS, INC.1003/21/2026
BUILDINGS REPRISENTATIVE LLC3203/21/2026
ZV Drafting103/21/2026
HS DESIGN STUDIO203/21/2026
HOWARD I SHAPIRO ASSOCIATES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor2207/08/2026
TCHORS LLCGeneral Contractor1307/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor1004/09/2026
PRIME PIPING & HEATING INFire Protection407/08/2026
GILBANE BUILDING COMPANYGeneral Contractor407/08/2026
PAR ENVIRONMENTAL CORPORAGeneral Contractor307/08/2026
PRIME PIPING & HEATING INPlumbing207/08/2026
N TECH DESIGN OF AMERICAGeneral Contractor104/08/2026
UNIVERSAL BUILD SUPP LLCGeneral Contractor103/21/2026
WHEELER, RElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.3941307/21/2026
LEO Y LEE ASSOCIATES2481207/25/2025
SHAHRISH SHUVO ENGINEERIN8524105/29/2025
FC CONSULTING ENGINEER,PL1958302/27/2025
ALAN MARGOLIN & ASSOC423610/02/2023
Building Lifecycle
All (244)Filed (43)Permit Issued (38)Signed Off (19)Facade (FISP) (18)Violation (60)Inspection (16)Objection (20)Special Inspection (30)
09/03/2026
Violation issued (ECB, open)
Elevators
08/25/2026
Objection resolved — Resolved
07/29/2026
Objection raised — Other
07/21/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing work in conjunction with application #M01170336-I1
M01170336-A3
07/14/2026
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
07/14/2026
Special inspection requirement — Interior lighting power
Paul Raymond
07/14/2026
Special inspection requirement — Lighting controls
Paul Raymond
07/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
07/14/2026
Special inspection requirement — Fenestration air leakage
Paul Raymond
07/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
07/14/2026
Special inspection requirement — Metering
Paul Raymond
07/14/2026
Special inspection requirement — Insulation placement and R values
Paul Raymond
07/14/2026
Special inspection requirement — Lighting in dwelling units
Paul Raymond
07/14/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Paul Raymond
07/14/2026
Special inspection requirement — Exterior lighting power
Paul Raymond
07/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
07/14/2026
Special inspection requirement — Air barrier continuity plan testing
Paul Raymond
07/14/2026
Special inspection requirement — Maintenance information
Paul Raymond
07/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
07/14/2026
Special inspection requirement — Fenestration areas
Paul Raymond
07/14/2026
Special inspection requirement — Electrical motors and elevators
Paul Raymond
07/01/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/17/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/14/2026
Violation issued (HPD, closed)
A
05/14/2026
Violation issued (HPD, closed)
A
04/29/2026
Violation issued (HPD, closed)
A
04/26/2026
Cycle 10 facade inspection completed
04/24/2026
Cycle 10 facade report signed — SAFE
04/15/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
Plumbing work in conjunction with application #M01170336-I1
M01170336-S3
04/15/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
Plumbing work in conjunction with application #M01170336-I1
M01170336-S2
04/15/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
Plumbing work in conjunction with application #M01170336-I1
M01170336-S4
04/15/2026
Signed off — Alteration
APPLICATION FILED HEREWITH TO PERFORM DEMOLITION AND FRAMING AS INDICATED ON DRAWINGS IN CONJUNCTION WITH ALTCO APPLICATION M01170336-I1, REMOVE EXCESS DEBRIS, CAP/REMOVE MECHANICAL SYSTEMS.
M01162045-S1
04/12/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing work in conjunction with application #M01170336-I1
M01170336-A2
04/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
04/10/2026
Special inspection requirement — Lighting controls
Paul Raymond
04/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
04/10/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Paul Raymond
04/10/2026
Special inspection requirement — Metering
Paul Raymond
04/10/2026
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
04/10/2026
Special inspection requirement — Fenestration air leakage
Paul Raymond
04/10/2026
Special inspection requirement — Exterior lighting power
Paul Raymond
04/10/2026
Special inspection requirement — Interior lighting power
Paul Raymond
04/10/2026
Special inspection requirement — Maintenance information
Paul Raymond
04/10/2026
Special inspection requirement — Fenestration areas
Paul Raymond
04/10/2026
Special inspection requirement — Insulation placement and R values
Paul Raymond
04/10/2026
Special inspection requirement — Lighting in dwelling units
Paul Raymond
03/26/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00427144-I1
03/18/2026
Cycle 10 facade report submitted
03/17/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/06/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/04/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/27/2026
Permit issued — Suspended Scaffold
M01364371-I1-SC
02/26/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/25/2026
Filed — Alteration
M01364371-I1
02/23/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
Plumbing work in conjunction with application #M01170336-I1
M01170336-S5
02/20/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01228931-I1
02/19/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing work in conjunction with application #M01170336-I1
M01170336-A1
02/17/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
Latest 60 of 244 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedCENTRAL CONSTRUCTION MGMT02/27/2026
DOB NOWStandpipeSigned-offA M B MECHANICAL INC02/09/2026
DOB NOWGeneral ConstructionPermit IssuedTCHORS LLC02/04/2026
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC01/27/2026
DOB NOWGeneral ConstructionPermit IssuedTCHORS LLC01/20/2026
DOB NOWGeneral ConstructionPermit IssuedTCHORS LLC12/01/2025
DOB NOWStructuralSigned-offTCHORS LLC11/19/2025
DOB NOWMechanical SystemsSigned-offTCHORS LLC11/06/2025
DOB NOWStructuralSigned-offTCHORS LLC07/17/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/11/2025
DOB NOWGeneral ConstructionPermit IssuedTCHORS LLC06/24/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/02/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC05/27/2025
DOB NOWStandpipeSigned-offA M B MECHANICAL INC05/15/2025
DOB NOWSprinklersSigned-offA M B MECHANICAL INC05/15/2025
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN05/12/2025
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC03/26/2025
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC02/27/2025
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC02/24/2025
DOB NOWStandpipeSigned-offA M B MECHANICAL INC02/13/2025
DOB NOWGeneral ConstructionSigned-offN TECH DESIGN OF AMERICA01/23/2025
DOB NOWMechanical SystemsSigned-offTCHORS LLC01/13/2025
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN01/13/2025
DOB NOWConstruction FenceSigned-offTCHORS LLC01/08/2025
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC02/27/2024
DOB NOWStructuralSigned-offPAR ENVIRONMENTAL CORPORA11/13/2023
DOB NOWMechanical SystemsSigned-offGILBANE BUILDING COMPANY09/22/2023
DOB NOWGeneral ConstructionSigned-offGILBANE BUILDING COMPANY08/17/2023
DOB NOWGeneral ConstructionSigned-offPAR ENVIRONMENTAL CORPORA08/16/2023
DOB NOWSidewalk ShedSigned-offUNIVERSAL BUILD SUPP LLC06/26/2023
DOB NOWMechanical SystemsSigned-offGILBANE BUILDING COMPANY06/12/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC02/27/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/01/2022
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC11/13/2020
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC02/28/2020
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC12/19/2019
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC12/26/2018
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC08/24/2018
BIS—ISSUEDNORTH SHORE NEON SIGN CO12/21/2011
BISOTISSUEDNORTH SHORE NEON SIGN LLC12/21/2011
+ 30 more permits on file
1 project · most recent 07/21/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/21/2026Signed-offPRIME PIPING & HEATING INGas, Storm, Water/Sanitary
6 projects · most recent 05/04/2026
General Wiring
FiledStatusContractorScope
05/04/2026CompleteDENALI ELECTRIC CORP—
03/18/2026CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
03/08/2025CompleteSOLAS ELECTRICAL CORP—
01/28/2025CompleteHIVOLTS ELECTRICAL INC—
08/03/2023CompleteMARCEL ELEC'L CONTRG CORP—
08/22/2018CompleteTOP SHELF ELECTRIC CORP—
1 project · most recent 07/21/2026
Steel Concrete Masonry
FiledStatusContractorScope
07/21/2026Signed-offPRIME PIPING & HEATING INSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
07/01/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/17/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/17/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/06/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/17/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/08/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/05/2026Fail-Final SD - Fire PumpFailView ↗
12/24/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/11/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/26/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
05/26/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
05/26/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 129
DateRequirementInspectorRole
07/14/2026Maintenance informationPaul Raymondenergy_progress
07/14/2026Fenestration air leakagePaul Raymondenergy_progress
07/14/2026Lighting in dwelling unitsPaul Raymondenergy_progress
07/14/2026Lighting controlsPaul Raymondenergy_progress
07/14/2026Insulation placement and R valuesPaul Raymondenergy_progress
07/14/2026Interior lighting powerPaul Raymondenergy_progress
07/14/2026Exterior lighting powerPaul Raymondenergy_progress
07/14/2026MeteringPaul Raymondenergy_progress
07/14/2026Exterior Insulation and Finish Systems (EIFS)Paul Raymondspecial
07/14/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
07/14/2026Energy Code Compliance InspectionsPaul Raymondprogress
07/14/2026Fire-Resistance Rated ConstructionPaul Raymondprogress
07/14/2026Electrical motors and elevatorsPaul Raymondenergy_progress
07/14/2026Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
07/14/2026Fenestration areasPaul Raymondenergy_progress
07/14/2026Air barrier - visual inspectionPaul Raymondenergy_progress
07/14/2026Air barrier continuity plan testingPaul Raymondenergy_progress
04/10/2026Air barrier continuity plan testingPaul Raymondenergy_progress
04/10/2026Electrical motors and elevatorsPaul Raymondenergy_progress
04/10/2026Lighting in dwelling unitsPaul Raymondenergy_progress
04/10/2026Insulation placement and R valuesPaul Raymondenergy_progress
04/10/2026Maintenance informationPaul Raymondenergy_progress
04/10/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
04/10/2026Energy Code Compliance InspectionsPaul Raymondprogress
04/10/2026Fire-Resistance Rated ConstructionPaul Raymondprogress
Latest 25 of 129.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Mount Sinai Beth IsraelMedical / HealthcareCellar, Floor 2
Project M00854458 Alteration · LOC Issued · 05/25/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 308 on file (BIS + DOB NOW)
▸Plans & Drawings44
▸DOB NOWPlans/Sketch43
09/06/2026M00073004-I1Request digital key ↗
08/31/2026M00854458-I1Request digital key ↗
08/31/2026M00854458-P1Request digital key ↗
Showing 3 of 43 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00427144-I1Request digital key ↗
▸Applications & Permits25
▸BISPLAN / WORK APPROVAL APPLICATION17
02/18/2026103462539Open ↗
02/18/2026120610945Open ↗
01/30/2026100303761Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION8
01/03/2012120776384Open ↗
12/23/2011120776302Open ↗
12/23/2011120776295Open ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records14
▸DOB NOWZD1: DOB Zoning Diagram6
08/17/2026M01170336-A2Open ↗
08/17/2026M01170336-P6Open ↗
08/17/2026M01170336-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/17/2026M01170336-A2Open ↗
08/17/2026M01170336-P6Open ↗
08/17/2026M01170336-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/17/2026M01170336-P6Open ↗
08/17/2026M01170336-I1Open ↗
Showing 2 of 3 on file for this type
▸Seals & Professional Certifications105
▸DOB NOWDPL-1: Design Professional Seal & Signature43
09/06/2026M00073004-I1Open ↗
08/31/2026M00854458-I1Open ↗
08/31/2026M00854458-P1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature26
09/29/2026M01162045-P2Open ↗
09/29/2026M01162045-P2Open ↗
09/01/2026M01170336-P6Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
09/29/2026M01162045-P2Open ↗
09/01/2026M01170336-P6Open ↗
09/01/2026M01170336-P6Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
07/11/2018123376113Open ↗
03/14/2013120621283Open ↗
03/11/2013120621283Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/26/2009120085843Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/26/2009120085843Open ↗
▸Trade Schedules & Equipment8
▸BISSELF-CERT PLUMBING NOTICE2
09/26/2011120621283Open ↗
08/26/2011120621283Open ↗
▸DOB NOWFDNY: Letter of No Objection2
08/17/2026M01170336-S3Open ↗
08/13/2026M01170336-P9Open ↗
▸BISSCHEDULE B - PLUMBING1
03/03/2011120621283Open ↗
▸BISEQUIPMENT USE PERMITS1
02/22/2013120621283Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
02/22/2013120621283Open ↗
▸BISSIGN HANGER CERTIFICATE1
12/23/2011120776384Open ↗
▸Safety & Tenant Protection16
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist10
09/06/2026M00073004-I1Open ↗
08/29/2026M00854452-P1Open ↗
08/29/2026M00854452-I1Open ↗
Showing 3 of 10 on file for this type
▸BISHPD-1 - Anti-Harassment Area Checklist5
10/04/2011120776393Open ↗
09/29/2011120776295Open ↗
09/19/2011120776384Open ↗
Showing 3 of 5 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
07/11/2018123376113Open ↗
▸Environmental & Asbestos24
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/31/2026M00854458-I1Open ↗
08/31/2026M00854458-P1Open ↗
08/24/2026M01162045-P2Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS-CERTIFICATION (DEP ACP5)2
03/03/2011120610945Open ↗
03/03/2011120610945Open ↗
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
03/03/2011120621283Open ↗
03/03/2011120610945Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026M00854452-I1Open ↗
08/13/2026M00854452-S1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/26/2009120085843Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/11/2018123376113Open ↗
03/11/2013120621283Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/17/2026M01170336-S2Open ↗
08/13/2026M01170336-S1Open ↗
▸BISTR8: Energy Code Progress Inspections1
04/05/2011120621283Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/03/2011120621283Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/11/2013120621283Open ↗
▸Approvals, Objections & Sign-offs20
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
09/06/2026M00073004-I1Open ↗
08/31/2026M00854458-I1Open ↗
08/31/2026M00854458-P1Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
08/09/2011120776393Open ↗
08/04/2011120776302Open ↗
08/04/2011120776384Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/18/2026103462539Open ↗
02/18/2026120610945Open ↗
08/14/2018123376113Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
07/11/2018123376113Open ↗
03/14/2013120621283Open ↗
08/09/2011120776393Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET8
07/11/2018123376113Open ↗
08/09/2011120776393Open ↗
08/04/2011120776302Open ↗
Showing 3 of 8 on file for this type
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST5
10/04/2011120776393Open ↗
09/19/2011120776384Open ↗
09/19/2011120776302Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION1
08/14/2018123376113Open ↗
▸BISeFiling Job Application Cover Sheet1
06/26/2009120085843Open ↗
▸Other Documents22
▸DOB NOWSite Survey: Initial6
08/17/2026M01170336-A2Open ↗
08/17/2026M01170336-P6Open ↗
08/17/2026M01170336-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification5
08/17/2026M01170336-A2Open ↗
08/17/2026M01170336-P6Open ↗
08/17/2026M01170336-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/17/2026M01170336-A2Open ↗
08/17/2026M01170336-P6Open ↗
08/17/2026M01170336-I1Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/23/2011120776393Open ↗
04/05/2011120621283Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026M00427144-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026M01170336-I1Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01364371-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M00854452-S1Open ↗