← Back
One story - permanent living quarter
313 MAYFAIR DRIVE NORTH
BROOKLYN · BIN 3243420
💬 Discuss this project
1965Year Built
1Stories
A2Building Class
R2Zoning
2,360 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story - permanent living quarter · 5,108 sf lot · 0.46 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbing
Roof1p · 1 filing · 15 docs
Floor 31 filing · 15 docs
Floor 21p · 2 filings · 20 docs
Floor 1
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DOMOVOY303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/05/2024$950K—Private party → Private party$403/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MLS COMPLETE ENGINEERING510/19/2025
EDWARD C. HICKS RA310/31/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BLOK ASSOCIATES803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DOMOVOY LLCGeneral Contractor1004/12/2026
MMI PLUMBING & HEATING INC.Plumbing307/08/2026
MAC ELECT'L CONTR. INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITISCAPE CONSULTING LTD762310/19/2025
Building Lifecycle
All (111)Filed (8)Permit Issued (11)Signed Off (4)Violation (3)Inspection (6)Objection (54)Special Inspection (25)
04/10/2026
Signed off — Alteration
Installation of new and replacement of existing plumbing and gas fixtures in conjunction with GC Application #B01028580-I1.
B01028580-I1
03/17/2026
Signed off — Alteration
Installation of new and replacement of existing plumbing and gas fixtures in conjunction with GC Application #B01028580-I1.
B01028580-S2
03/17/2026
Signed off — Alteration CO
Installation of new and replacement of existing plumbing fixtures in conjunction with GC Application #B01062483-I1.
B01062483-S1
02/25/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/13/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/05/2026
Permit issued — Structural
B01062483-I1-GC
02/02/2026
Permit issued — Structural
B01062483-I1-ST
01/12/2026
Signed off — Alteration
B01020334-I1
01/08/2026
Permit issued — Plumbing
B01062483-S1-PL
11/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
Joe Lieberman
11/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Joe Lieberman
11/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Joe Lieberman
11/03/2025
Special inspection requirement — Permanent certificate
Joe Lieberman
11/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joe Lieberman
10/19/2025
Filed — Alteration CO
Installation of new and replacement of existing plumbing fixtures in conjunction with GC Application #B01062483-I1.
B01062483-S1
09/22/2025
Objection resolved — Addressed
09/19/2025
Objection raised — Scope
09/10/2025
Permit issued — Construction Fence
B01020334-I1-FN
09/09/2025
Filed — Alteration
Installation of new and replacement of existing plumbing and gas fixtures in conjunction with GC Application #B01028580-I1.
B01028580-P3
08/28/2025
Permit issued — Structural
B01062483-I1-GC
07/29/2025
Permit issued — Plumbing
B01028580-S2-PL
06/03/2025
Objection resolved — Addressed
06/02/2025
Objection raised — Cost
05/21/2025
Objection resolved — Addressed
04/08/2025
Permit issued — General Construction
B01028580-I1-GC-CX
03/17/2025
Objection raised — Other
03/14/2025
Objection resolved — Addressed
02/13/2025
Permit issued — Structural
B01028580-I1-GC-CX
12/02/2024
Objection raised — Other
11/26/2024
Objection resolved — Addressed
11/19/2024
Special inspection requirement — Fenestration areas
Joe Lieberman
11/19/2024
Special inspection requirement — Lighting in dwelling units
Joe Lieberman
11/19/2024
Special inspection requirement — Fenestration air leakage
Joe Lieberman
11/19/2024
Special inspection requirement — Air barrier - visual inspection
Joe Lieberman
11/19/2024
Special inspection requirement — Insulation placement and R values
Joe Lieberman
11/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joe Lieberman
11/19/2024
Special inspection requirement — Concrete - Cast-In-Place
Joe Lieberman
11/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Joe Lieberman
11/19/2024
Special inspection requirement — Final
Joe Lieberman
11/19/2024
Special inspection requirement — Lowest Floor Elevation
Joe Lieberman
11/15/2024
Objection resolved — Addressed
11/13/2024
Objection raised — Other
11/06/2024
Objection resolved — Addressed
11/05/2024
Objection resolved — Addressed
11/01/2024
Objection raised — Other
10/31/2024
Filed — Alteration
Installation of new and replacement of existing plumbing and gas fixtures in conjunction with GC Application #B01028580-I1.
B01028580-P1
10/31/2024
Filed — Alteration
Installation of new and replacement of existing plumbing and gas fixtures in conjunction with GC Application #B01028580-I1.
B01028580-P2
10/31/2024
Objection raised — Scope
10/29/2024
Special inspection requirement — Air barrier - visual inspection
EDWARD HICKS
10/29/2024
Special inspection requirement — Insulation placement and R values
EDWARD HICKS
10/29/2024
Special inspection requirement — Fenestration areas
EDWARD HICKS
10/29/2024
Special inspection requirement — Fenestration air leakage
EDWARD HICKS
10/29/2024
Special inspection requirement — Lighting in dwelling units
EDWARD HICKS
10/29/2024
Special inspection requirement — Lowest Floor Elevation
Joe Lieberman
10/29/2024
Special inspection requirement — Final
Joe Lieberman
10/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Joe Lieberman
10/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joe Lieberman
10/29/2024
Special inspection requirement — Concrete - Cast-In-Place
Joe Lieberman
09/16/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedDOMOVOY LLC02/05/2026
DOB NOWStructuralSigned-offDOMOVOY LLC02/02/2026
DOB NOWPlumbingSigned-offMICHAEL ITSKOVICH01/08/2026
DOB NOWConstruction FenceSigned-offDOMOVOY LLC09/10/2025
DOB NOWStructuralPermit IssuedDOMOVOY LLC08/28/2025
DOB NOWPlumbingSigned-offMICHAEL ITSKOVICH07/29/2025
DOB NOWGeneral ConstructionSigned-offDOMOVOY LLC04/08/2025
DOB NOWStructuralSigned-offDOMOVOY LLC02/13/2025
DOB NOWPlumbingSigned-offMICHAEL ITSKOVICH07/12/2024
DOB NOWGeneral ConstructionSigned-offDOMOVOY LLC06/17/2024
DOB NOWConstruction FenceSigned-offDOMOVOY LLC05/07/2024
1 project · most recent 10/19/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/19/2025Signed-offMMI PLUMBING & HEATING INGas, Water/Sanitary
2 projects · most recent 11/20/2025
General Wiring
FiledStatusContractorScope
11/20/2025Permit IssuedMAC ELECT'L CONTR. INC.General Wiring
11/20/2025CompleteMAC ELECT'L CONTR. INC.General Wiring
1 project · most recent 10/19/2025
Wood
FiledStatusContractorScope
10/19/2025Permit IssuedDOMOVOY LLCWood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/25/2026Pass-Final General Construction Non-Directive 14PassView ↗
02/13/2026Pass-Final CND-Occupancy InspectionPassView ↗
09/16/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/22/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/22/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
11/21/2025HVAC-R and service water heating system controlsJoe Liebermanenergy_progress
11/21/2025HVAC-R and service water piping design and insulationJoe Liebermanenergy_progress
11/21/2025HVAC-R and service water heating equipmentJoe Liebermanenergy_progress
11/03/2025Permanent certificateJoe Liebermanenergy_progress
11/03/2025Fire-Resistant Penetrations and JointsJoe Liebermanspecial
11/19/2024Fenestration areasJoe Liebermanenergy_progress
11/19/2024Lighting in dwelling unitsJoe Liebermanenergy_progress
11/19/2024Fenestration air leakageJoe Liebermanenergy_progress
11/19/2024Air barrier - visual inspectionJoe Liebermanenergy_progress
11/19/2024Insulation placement and R valuesJoe Liebermanenergy_progress
11/19/2024Fire-Resistant Penetrations and JointsJoe Liebermanspecial
11/19/2024Concrete - Cast-In-PlaceJoe Liebermanspecial
11/19/2024Structural Stability – Alterations of existing buildingsJoe Liebermanspecial
11/19/2024FinalJoe Liebermanprogress
11/19/2024Lowest Floor ElevationJoe Liebermanprogress
10/29/2024Air barrier - visual inspectionEDWARD HICKSenergy_progress
10/29/2024Insulation placement and R valuesEDWARD HICKSenergy_progress
10/29/2024Fenestration areasEDWARD HICKSenergy_progress
10/29/2024Fenestration air leakageEDWARD HICKSenergy_progress
10/29/2024Lighting in dwelling unitsEDWARD HICKSenergy_progress
10/29/2024Lowest Floor ElevationJoe Liebermanprogress
10/29/2024FinalJoe Liebermanprogress
10/29/2024Structural Stability – Alterations of existing buildingsJoe Liebermanspecial
10/29/2024Fire-Resistant Penetrations and JointsJoe Liebermanspecial
10/29/2024Concrete - Cast-In-PlaceJoe Liebermanspecial
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/25/2026B01020334-I1Request digital key ↗
08/24/2026B01062483-S1Request digital key ↗
08/23/2026B01028580-S2Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/14/2026B01028580-P2Open ↗
08/14/2026B01028580-I1Open ↗
08/13/2026B01062483-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01062483-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature9
08/26/2026B01062483-S1Open ↗
08/23/2026B01028580-P2Open ↗
08/23/2026B01028580-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026B01062483-S1Open ↗
08/23/2026B01028580-P2Open ↗
08/23/2026B01028580-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026B01062483-S1Open ↗
08/23/2026B01028580-P2Open ↗
08/22/2026B01028580-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist1
08/15/2026B01062483-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B01062483-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026B01028580-S2Open ↗
08/14/2026B01028580-P1Open ↗
08/14/2026B01028580-P2Open ↗
Showing 3 of 5 on file for this type
▸Other Documents11
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/14/2026B01028580-P2Open ↗
08/14/2026B01028580-I1Open ↗
08/13/2026B01062483-I1Open ↗
▸DOB NOWPlot Diagram3
08/14/2026B01028580-P2Open ↗
08/14/2026B01028580-I1Open ↗
08/13/2026B01062483-I1Open ↗
▸DOB NOWSite Survey: Initial3
08/14/2026B01028580-P2Open ↗
08/14/2026B01028580-I1Open ↗
08/13/2026B01062483-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026B01062483-I1Open ↗
▸DOB NOWFinal Survey1
08/15/2026B01062483-I1Open ↗