313 SOUTH 4TH STREET
BROOKLYN · BIN 3063340
💬 Discuss this project
1915Year Built
4Stories
C1Building Class
R6Zoning
6,000 sfGross Floor Area
13Units
Rent Stabilized7 Active Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 313 South 4th Property Owner · 2,375 sf lot · 2.53 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof13p · 1 filing · 20 docs
Floor 413p · 1 filing · 20 docs
Floor 313p · 2 filings · 20 docs
Floor 213p · 1 filing · 20 docs
Floor 113p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
Site & exteriorHeavy duty sidewalk shed installation13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Holliswood 2Ave3807/08/2026
313 South 4th Property Owner103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/14/2023$4.0M—BH 431-433 WYTHE AVENUE LLC → 313 SOUTH 4TH PROPERTY OWNER LLC$658/sf building
07/09/2018$3.3M—— → —$550/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
James Chai Architect211/03/2025
Jon Powell Architecture512/19/2024
MSM Engineering Services108/26/2024
Jag Engineering203/07/2024
Me Engineers102/19/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Nexus Consulting NYC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Envision Design & ConstructionGeneral Contractor1707/08/2026
MNK Enterprises NYScaffold303/21/2026
Infiniti ElectricElectrical103/22/2026
Dynamic Plumbing & SprinklerPlumbing107/08/2026
RRP PlumbingPlumbing107/08/2026
Redirecting LicGeneral Contractor104/09/2026
T. Dirusso Electrical ContElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
James JH Chai & Associate6481211/03/2025
BHK Engineering9589109/30/2025
NS Engineering & Consulting3652812/19/2024
Building Lifecycle
All (140)Filed (11)Permit Issued (11)Signed Off (7)Violation (23)Inspection (5)Objection (55)Special Inspection (28)
02/12/2026
Violation issued (HPD, closed)
C
02/12/2026
Violation issued (HPD, closed)
C
02/05/2026
Violation issued (HPD, open)
C
12/16/2025
Signed off — Alteration
Plumbing modifications to remove kitchenette sink. No change to use, egress, or occupancy.
B01291864-I1
12/15/2025
Signed off — Alteration
Plumbing modifications to remove kitchenette sink. No change to use, egress, or occupancy.
B01291864-S2
12/02/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/01/2025
Permit issued — Plumbing
B01291864-S2-PL
11/26/2025
Permit issued — General Construction
B01291864-I1-GC
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/10/2025
Objection resolved — Addressed
11/03/2025
Filed — Alteration
Plumbing modifications to remove kitchenette sink. No change to use, egress, or occupancy.
B01291864-S2
10/30/2025
Objection resolved — Addressed
10/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
William DeGraaff
10/29/2025
Objection resolved — Addressed
10/29/2025
Objection resolved — Addressed
10/29/2025
Objection resolved — Addressed
10/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joon Ho Chai
10/10/2025
Objection raised — Zoning
10/10/2025
Objection raised — Zoning
10/10/2025
Objection raised — Other
10/10/2025
Objection raised — Inspections
10/10/2025
Objection raised — Scope
09/30/2025
Filed — Alteration
Plumbing modifications to remove kitchenette sink. No change to use, egress, or occupancy.
B01291864-I1
09/26/2025
Special inspection requirement — Lighting controls
Joon Ho Chai
09/26/2025
Special inspection requirement — Permanent certificate
Joon Ho Chai
09/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
Joon Ho Chai
09/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joon Ho Chai
09/23/2025
Special inspection requirement — Lighting in dwelling units
Joon Ho Chai
09/23/2025
Special inspection requirement — Final
JIN WOO LEE
09/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Joon Ho Chai
09/17/2025
Violation issued (HPD, closed)
C
09/17/2025
Violation issued (HPD, closed)
C
07/07/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01100189-I1
01/17/2025
Signed off — Alteration
ARCHITECTURAL MODIFICATIONS AND COMBINATION OF DWELING UNITS (D1 & D2) AS PER TPPN #3/97. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00977683-I1
01/16/2025
Signed off — Alteration
ARCHITECTURAL MODIFICATIONS AND COMBINATION OF DWELING UNITS (D1 & D2) AS PER TPPN #3/97. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00977683-S1
01/16/2025
Signed off — Alteration
ARCHITECTURAL MODIFICATIONS AND COMBINATION OF DWELING UNITS (D1 & D2) AS PER TPPN #3/97. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00977683-S2
01/16/2025
Signed off — Alteration
ARCHITECTURAL MODIFICATIONS AND COMBINATION OF DWELING UNITS (D1 & D2) AS PER TPPN #3/97. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00977683-S3
01/14/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/19/2024
Filed — Alteration
ARCHITECTURAL MODIFICATIONS AND COMBINATION OF DWELING UNITS (D1 & D2) AS PER TPPN #3/97. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00977683-P4
12/19/2024
Permit issued — General Construction
B00977683-I1-GC
12/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARI MOTWANI
12/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
NARI MOTWANI
08/26/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01100189-I1
08/26/2024
Permit issued — Sidewalk Shed
B01100189-I1-SH
07/01/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/05/2024
Objection raised — Fire_Protection
06/05/2024
Objection raised — Other
06/05/2024
Objection raised — Other
06/05/2024
Objection raised — Other
06/05/2024
Objection raised — Accessibility
05/30/2024
Filed — Alteration
ARCHITECTURAL MODIFICATIONS AND COMBINATION OF DWELING UNITS (D1 & D2) AS PER TPPN #3/97. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00977683-P2
05/30/2024
Filed — Alteration
ARCHITECTURAL MODIFICATIONS AND COMBINATION OF DWELING UNITS (D1 & D2) AS PER TPPN #3/97. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00977683-P3
05/29/2024
Special inspection requirement — Energy Code Compliance Inspections
NARI MOTWANI
05/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARI MOTWANI
05/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
NARI MOTWANI
05/29/2024
Special inspection requirement — Final
Jonathan Powell
05/29/2024
Special inspection requirement — Lighting in dwelling units
NARI MOTWANI
05/29/2024
Special inspection requirement — Interior lighting power
NARI MOTWANI
05/29/2024
Special inspection requirement — Lighting controls
NARI MOTWANI
Latest 60 of 140 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offRRP Plumbing12/01/2025
DOB NOWGeneral ConstructionSigned-offRedirecting Lic11/26/2025
DOB NOWGeneral ConstructionSigned-offEnvision Design & Construction12/19/2024
DOB NOWSidewalk ShedSigned-offMNK Enterprises NY08/26/2024
DOB NOWGeneral ConstructionSigned-offEnvision Design & Construction04/22/2024
DOB NOWMechanical SystemsSigned-offEnvision Design & Construction04/22/2024
DOB NOWStructuralSigned-offEnvision Design & Construction04/22/2024
DOB NOWStructuralSigned-offEnvision Design & Construction03/22/2024
DOB NOWPlumbingSigned-offCitywide Plumbing & Heating & SPKLS03/21/2024
DOB NOWGeneral ConstructionSigned-offEnvision Design & Construction03/07/2024
DOB NOWMechanical SystemsSigned-offEnvision Design & Construction03/07/2024
BIS—ISSUEDFrank DI Gregorio General Contracting02/20/2001
3 projects · most recent 03/19/2026
General Wiring
FiledStatusContractorScope
03/19/2026CompleteInfiniti ElectricGeneral Wiring
10/21/2025CompleteT. Dirusso Electrical ContGeneral Wiring
08/26/2024CompleteRichard Neu—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/02/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/14/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
10/30/2025Structural Stability – Alterations of existing buildingsWilliam DeGraaffspecial
10/29/2025Fire-Resistant Penetrations and JointsJoon Ho Chaispecial
09/26/2025Lighting controlsJoon Ho Chaienergy_progress
09/26/2025Permanent certificateJoon Ho Chaienergy_progress
09/23/2025Fire-Resistance Rated ConstructionJoon Ho Chaiprogress
09/23/2025Fire-Resistant Penetrations and JointsJoon Ho Chaispecial
09/23/2025Lighting in dwelling unitsJoon Ho Chaienergy_progress
09/23/2025FinalJIN WOO LEEprogress
09/23/2025Energy Code Compliance InspectionsJoon Ho Chaiprogress
12/16/2024Fire-Resistant Penetrations and JointsNARI MOTWANIspecial
12/16/2024Tenant Protection Plan ComplianceNARI MOTWANIspecial
05/29/2024Energy Code Compliance InspectionsNARI MOTWANIprogress
05/29/2024Structural Stability – Alterations of existing buildingsNARI MOTWANIspecial
05/29/2024Tenant Protection Plan ComplianceNARI MOTWANIspecial
05/29/2024FinalJonathan Powellprogress
05/29/2024Lighting in dwelling unitsNARI MOTWANIenergy_progress
05/29/2024Interior lighting powerNARI MOTWANIenergy_progress
05/29/2024Lighting controlsNARI MOTWANIenergy_progress
03/11/2024Tenant Protection Plan ComplianceNARI MOTWANIspecial
03/11/2024FinalJosh Greggprogress
03/11/2024Structural Stability – Alterations of existing buildingsNARI MOTWANIspecial
12/15/2023Tenant Protection Plan ComplianceNARI MOTWANIspecial
12/14/2023Lighting in dwelling unitsNARI MOTWANIenergy_progress
12/14/2023FinalJonathan Powellprogress
12/14/2023Energy Code Compliance InspectionsNARI MOTWANIprogress
Latest 25 of 28.
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/26/2026B00977683-S2Request digital key ↗
08/26/2026B00977683-S3Request digital key ↗
08/26/2026B00977683-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature17
08/28/2026B01291864-I1Open ↗
08/28/2026B01291864-I1Open ↗
08/28/2026B01291864-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/26/2026B00977683-S1Open ↗
08/26/2026B00977683-S2Open ↗
08/26/2026B00977683-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
08/28/2026B01291864-I1Open ↗
08/28/2026B01291864-I1Open ↗
08/28/2026B00977683-P4Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/26/2026B00977683-S1Open ↗
08/26/2026B00977683-S2Open ↗
08/26/2026B00977683-P3Open ↗
Showing 3 of 10 on file for this type