← Back
City residence, one family
313 WEST 71 STREET
MANHATTAN · Upper West Side-Lincoln Square · BIN 1030961
💬 Discuss this project
1896Year Built
5Stories
A4Building Class
R8BZoning
—Gross Floor Area
1Units
6 Open Violations ▸FDNY Report ↗
City residence, one family · Owner of record: 313 WEST 71 REALTY LLC · 3.16 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ART. SEVENTH TRUST103/22/2026
313 WEST 71 REALTY LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.103/01/2021
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808103/01/2021
Building Lifecycle
All (26)Filed (1)Permit Issued (2)Signed Off (1)Violation (20)Special Inspection (2)
04/29/2026
Violation issued (HPD, open)
A
06/04/2025
Violation issued (HPD, open)
A
12/20/2024
Signed off — Alteration
M00340323-I1
11/22/2024
Violation issued (HPD, closed)
I
07/25/2024
Permit issued — Boiler Equipment
M00340323-I1-BE
04/01/2024
Violation issued (HPD, open)
A
11/15/2023
Violation issued (HPD, closed)
I
03/16/2023
Violation issued (HPD, open)
A
11/02/2022
Violation issued (HPD, closed)
I
02/16/2022
Violation issued (HPD, open)
A
02/16/2022
Violation issued (HPD, closed)
I
04/01/2021
Violation issued (HPD, closed)
I
04/01/2021
Violation issued (HPD, open)
A
03/05/2021
Permit issued — Boiler Equipment
M00340323-I1-BE
03/01/2021
Filed — Alteration
M00340323-I1
04/06/2020
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Joseph Bazini
04/06/2020
Special inspection requirement — HVAC and service water heating equipment
Joseph Bazini
10/10/2018
Violation issued (HPD, closed)
I
09/12/2017
Violation issued (ECB, closed)
Construction
10/26/2016
Violation issued (HPD, closed)
I
10/02/2015
Violation issued (HPD, closed)
I
02/03/2015
Violation issued (HPD, closed)
I
06/01/2010
Violation issued (FDNY_NOV, closed)
11/16/2000
Violation issued (ECB, closed)
Construction
04/04/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/04/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offMICHAEL S. KAPLAN07/25/2024
DOB NOWBoiler EquipmentSigned-offMICHAEL S. KAPLAN03/05/2021
BIS—ISSUEDNAIM CONSTRUCTION LLC02/29/2024
BISPLISSUEDI.M.P. PLBG. & HTG. CORP11/04/2021
BISPLISSUEDI.M.P. PLBG. & HTG. CORP01/09/2019
BISPLISSUEDI.M.P. PLBG. & HTG. CORP12/22/2017
BIS—ISSUEDPJA LLC GENERAL CONTR05/30/2002
BIS—ISSUEDPJA LLC GENERAL CONTR05/23/2001
BIS—ISSUEDPJA LLC GENERAL CONTR06/06/2000
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
04/06/2020Fuel-Oil Storage and Fuel-Oil Piping SystemsJoseph Bazinispecial
04/06/2020HVAC and service water heating equipment Joseph Bazinienergy_progress
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/04/2026M00340323-I1Request digital key ↗
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION9
03/11/2025101395731Open ↗
02/06/2025101395731Open ↗
04/25/2024101395731Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION2
02/29/2024101395731Open ↗
11/08/2021101395731Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/04/2017101395731Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026M00340323-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026M00340323-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026M00340323-I1Open ↗
▸Trade Schedules & Equipment5
▸BIS* SPRINKLER TEST(HYDROSTATIC) 27-9672
12/11/2023101395731Open ↗
12/11/2023101395731Open ↗
▸BISSCHEDULE B - PLUMBING2
12/11/2023101395731Open ↗
03/30/2022101395731Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/08/2018101395731Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026M00340323-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00340323-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00340323-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00340323-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/11/2023101395731Open ↗
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
12/11/2023101395731Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLANDMARKS SIGNOFF1
12/31/2024101395731Open ↗
▸BISLANDMARKS APPROVAL1
10/04/2024101395731Open ↗
▸BISSUPERSEDING LETTER1
02/29/2024101395731Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/12/2024101395731Open ↗
▸Filing & Intake Forms6
▸BISBOROUGH INTAKE FORM5
02/29/2024101395731Open ↗
03/08/2018101395731Open ↗
12/04/2017101395731Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION1
04/12/2024101395731Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
03/04/2025101395731Open ↗
▸BIS* FIRE STOPS 27-3451
12/11/2023101395731Open ↗