← Back
Five to six families
313 WEST 78 STREET
MANHATTAN · Upper West Side (Central) · BIN 1031116
💬 Discuss this project
1895Year Built
5Stories
C2Building Class
R8BZoning
4,245 sfGross Floor Area
6Units
Rent Stabilized1 Open Violation ▸
Five to six families · Owner of record: KHALEESI43 LLC · 1,600 sf lot · 2.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof1p · 1 filing · 10 docs
Floor 32p · 2 filings · 20 docs
Floor 21p · 2 filings · 20 docs
Floor 12p · 3 filings · 20 docs
Cellar3p · 3 filings · 20 docs
Sub-Basement1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KHALEESI435507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/15/2020$2.5M—Private party → KHALEESI43 LLC$577/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONCORD CONSULTING ENGINEERING PC710/11/2024
KEVIN LOUIS PELLON307/20/2023
JDJ ENGINEERING, DPC207/19/2023
JBM AND ASSOCIATES606/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KSTM EXPEDIRING SERVICES1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STONE REMODELING, INCGeneral Contractor603/21/2026
1625 DB INCGeneral Contractor407/08/2026
CITY SUBURB INCGeneral Contractor203/21/2026
CASE PLUMBING LLCFire Protection107/08/2026
SUPER COOL HVAC, LLCGeneral Contractor107/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
NEW YORK PARK PLBG&HTG COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION15191110/11/2024
Building Lifecycle
All (83)Filed (18)Permit Issued (11)Signed Off (6)Violation (10)Inspection (6)Objection (2)Special Inspection (30)
06/04/2025
Violation issued (HPD, closed)
A
04/17/2025
Signed off — Alteration
PROVIDE NEW SPRINKLER COVERAGE FOR THE EGRESS AREAS ONLY FOR EXISTING 5 STORY MULTI FAMILLY BUILDING. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00603183-I1
04/14/2025
Signed off — Alteration
PROVIDE NEW SPRINKLER COVERAGE FOR THE EGRESS AREAS ONLY FOR EXISTING 5 STORY MULTI FAMILLY BUILDING. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00603183-S1
01/03/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/19/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/10/2024
Permit issued — Sprinklers
M00603183-S1-EW-SP
10/11/2024
Filed — Alteration
PROVIDE NEW SPRINKLER COVERAGE FOR THE EGRESS AREAS ONLY FOR EXISTING 5 STORY MULTI FAMILLY BUILDING. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00603183-S1
10/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
10/07/2024
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
09/25/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
09/18/2024
Filed — Alteration
PROVIDE NEW SPRINKLER COVERAGE FOR THE EGRESS AREAS ONLY FOR EXISTING 5 STORY MULTI FAMILLY BUILDING. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00603183-P5
07/25/2024
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
06/26/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/07/2024
Signed off — Alteration
M00519902-I1
02/08/2024
Signed off — Alteration
PROPOSED INTERIOR STRUCTURAL REINFORCEMENT ON CELLAR, FIRST, SECOND, AND THIRD AS PER PLANS.
M00665918-I1
01/09/2024
Filed — Alteration
PROVIDE NEW SPRINKLER COVERAGE FOR THE EGRESS AREAS ONLY FOR EXISTING 5 STORY MULTI FAMILLY BUILDING. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00603183-P4
01/05/2024
Signed off — Alteration
Propose installation of split systems in cellar, 001, 002, 003, 004, 005 and roof all as per plans filed herewith. No change in use occupancy or egress under this application.7-10-23 Respecfully request to amend plans M-001.01,M-300.01,M-301.01,M-303.01,
M08018557-I1
12/07/2023
Permit issued — Plumbing
M00603183-I1-PL
11/03/2023
Permit issued — Mechanical Systems
M08018557-I1-MS
11/01/2023
Permit issued — General Construction
M00519902-I1-GC
07/25/2023
Filed — Alteration
PROVIDE NEW SPRINKLER COVERAGE FOR THE EGRESS AREAS ONLY FOR EXISTING 5 STORY MULTI FAMILLY BUILDING. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00603183-P3
07/24/2023
Special inspection requirement — Final
Younes Abouyaala
07/24/2023
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
07/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
07/24/2023
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
07/20/2023
Filed — Alteration
M00519902-P1
07/20/2023
Special inspection requirement — Final
NAVEEN KUMAR
07/20/2023
Special inspection requirement — Mechanical Systems
Younes Abouyaala
07/19/2023
Filed — Alteration
Propose installation of split systems in cellar, 001, 002, 003, 004, 005 and roof all as per plans filed herewith. No change in use occupancy or egress under this application.7-10-23 Respecfully request to amend plans M-001.01,M-300.01,M-301.01,M-303.01,
M08018557-P1
07/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/17/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
07/17/2023
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
07/17/2023
Special inspection requirement — Final
Younes Abouyaala
07/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
07/17/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
07/17/2023
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/23/2023
Signed off — Alteration
Propose exterior altaration on first second and third floor at rear of the building as plan filed herewith.
M00692954-I1
11/11/2022
Permit issued — Mechanical Systems
M08018557-I1-MS
10/13/2022
Filed — Alteration
Propose installation of split systems in cellar, 001, 002, 003, 004, 005 and roof all as per plans filed herewith. No change in use occupancy or egress under this application.7-10-23 Respecfully request to amend plans M-001.01,M-300.01,M-301.01,M-303.01,
M08018557-I1
08/17/2022
Filed — Alteration
PROVIDE NEW SPRINKLER COVERAGE FOR THE EGRESS AREAS ONLY FOR EXISTING 5 STORY MULTI FAMILLY BUILDING. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00603183-P2
08/17/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
08/17/2022
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
06/28/2022
Permit issued — Structural
M00692954-I1-ST
06/15/2022
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
06/15/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
06/15/2022
Special inspection requirement — Structural Cold-Formed Steel
Younes Abouyaala
06/15/2022
Special inspection requirement — Final
NAVEEN KUMAR
06/14/2022
Filed — Alteration
Propose exterior altaration on first second and third floor at rear of the building as plan filed herewith.
M00692954-P1
06/13/2022
Special inspection requirement — Structural Cold-Formed Steel
06/13/2022
Special inspection requirement — Structural Steel - Details
06/13/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/13/2022
Special inspection requirement — Final
05/12/2022
Permit issued — General Construction
M00519902-I1-GC
03/25/2022
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
03/25/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
03/22/2022
Filed — Alteration
PROPOSED INTERIOR STRUCTURAL REINFORCEMENT ON CELLAR, FIRST, SECOND, AND THIRD AS PER PLANS.
M00665918-P3
03/20/2022
Filed — Alteration
PROPOSED INTERIOR STRUCTURAL REINFORCEMENT ON CELLAR, FIRST, SECOND, AND THIRD AS PER PLANS.
M00665918-P2
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offS & L PLUMBING INC12/10/2024
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG12/07/2023
DOB NOWMechanical SystemsSigned-offSTONE REMODELING, INC11/03/2023
DOB NOWGeneral ConstructionSigned-offSTONE REMODELING, INC11/01/2023
DOB NOWMechanical SystemsSigned-offSUPER COOL HVAC, LLC11/11/2022
DOB NOWStructuralSigned-offCITY SUBURB INC06/28/2022
DOB NOWGeneral ConstructionSigned-off1625 DB INC05/12/2022
DOB NOWStructuralSigned-off1625 DB INC02/14/2022
DOB NOWPlumbingSigned-offNEW YORK PARK PLBG&HTG CO11/19/2021
DOB NOWGeneral ConstructionSigned-off1625 DB INC06/28/2021
DOB NOWGeneral ConstructionPermit Issued1625 DB INC06/10/2021
2 projects · most recent 12/16/2022
General Wiring
FiledStatusContractorScope
12/16/2022Permit IssuedT.M.T ELECTRIC INCGeneral Wiring
09/22/2021Permit IssuedGSA ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/19/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/25/2024Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
06/26/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/14/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 72
DateRequirementInspectorRole
10/10/2024Tenant Protection Plan ComplianceYounes Abouyaalaspecial
10/07/2024Sprinkler SystemsYounes Abouyaalaspecial
09/25/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
09/25/2024HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
07/24/2023FinalYounes Abouyaalaprogress
07/24/2023Lighting in dwelling unitsYounes Abouyaalaenergy_progress
07/24/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/24/2023Insulation placement and R valuesYounes Abouyaalaenergy_progress
07/24/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
07/20/2023FinalNAVEEN KUMARprogress
07/20/2023Mechanical SystemsYounes Abouyaalaspecial
07/17/2023Insulation placement and R valuesYounes Abouyaalaenergy_progress
07/17/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/17/2023FinalYounes Abouyaalaprogress
07/17/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
07/17/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
07/17/2023HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
07/17/2023Lighting in dwelling unitsYounes Abouyaalaenergy_progress
08/17/2022HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
08/17/2022Energy Code Compliance InspectionsYounes Abouyaalaprogress
06/15/2022Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
06/15/2022Structural Cold-Formed SteelYounes Abouyaalaspecial
06/15/2022FinalNAVEEN KUMARprogress
06/15/2022Structural Steel - DetailsYounes Abouyaalaspecial
06/13/2022Structural Steel - Details—special
Latest 25 of 72.
▾Documents — 127 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
09/03/2026M00495699-I1Request digital key ↗
09/03/2026M00519902-P1Request digital key ↗
09/03/2026M00519902-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits17
▸DOB NOWLPC Approval/Permit17
09/02/2026M00692954-I1Open ↗
09/02/2026M00692954-P1Open ↗
09/02/2026M00665918-P2Open ↗
Showing 3 of 17 on file for this type
▸Seals & Professional Certifications59
▸DOB NOWProgress Inspector Seal & Signature22
09/01/2026M08018557-I1Open ↗
08/31/2026M00603183-I1Open ↗
08/31/2026M00603183-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/01/2026M08018557-I1Open ↗
08/28/2026M00519902-P1Open ↗
08/27/2026M00692954-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/03/2026M00495699-I1Open ↗
09/03/2026M00519902-I1Open ↗
09/03/2026M00519902-P1Open ↗
Showing 3 of 18 on file for this type
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
09/03/2026M00495699-I1Open ↗
09/03/2026M00519902-I1Open ↗
09/03/2026M00519902-P1Open ↗
Showing 3 of 18 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00603183-I1Open ↗
08/13/2026M00519902-I1Open ↗
▸Other Documents13
▸DOB NOWDHCR Document13
08/26/2026M00603183-P4Open ↗
08/26/2026M00603183-P4Open ↗
08/26/2026M00603183-P3Open ↗
Showing 3 of 13 on file for this type