← Back
BuildNYC
One family attached or semi-detached
3132 TIEMANN AVENUE
BRONX · BIN 2062035
💬 Discuss this project
1960Year Built
2Stories
A5Building Class
R5Zoning
1,080 sfGross Floor Area
1Units
One family attached or semi-detached · 1,710 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
PlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Replace gas pipe, furnace, and hot water heater1p · 1 filing · 8 docs
CellarReplace gas pipe, furnace, and hot water heater2 filings · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Colombo Architectural Studio311/18/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Junior Carter MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Colombo Architectural Stu4930211/18/2022
Building Lifecycle
03/15/2023
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
X00783950-I1-PL
11/18/2022
Filed — Alteration
APPLICATION FILED TO REPLACE SECTION OF GAS PIPE AT METER AREA. ALSO REPLACE GAS FURNACE AND GAS HOT WATER HEATER AT CELLAR OF EX. FAMILY DWELLING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00783950-P1
11/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yahaira Volquez Colombo
11/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yahaira Volquez Colombo
11/15/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJunior Carter Mechanical09/26/2022
1 project · most recent 11/18/2022
Gas
FiledStatusContractorScope
11/18/2022Permit IssuedJunior Carter MechanicalGas
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/07/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/31/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
11/18/2022Fire-Resistant Penetrations and JointsYahaira Volquez Colombospecial
11/17/2022Fire-Resistant Penetrations and JointsYahaira Volquez Colombospecial
11 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account