← Back
BuildNYC
Miscellaneous two family
313A 22ND STREET
BROOKLYN · BIN 3017607
💬 Discuss this project
1940Year Built
2Stories
B9Building Class
R6BZoning
2,112 sfGross Floor Area
2Units
7 Active Violations ▸FDNY Report ↗
Miscellaneous two family · Owner of record: Blossoms Blooming · 1,669 sf lot · 1.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBasement, 2nd floor, and roof demolition and constructionUnder Construction15p · 4 filings · 20 docs
Floor 2Basement, 2nd floor, and roof demolition and constructionUnder Construction24p · 6 filings · 20 docs
Floor 1Basement, 2nd floor, and roof demolition and constructionUnder Construction20p · 6 filings · 20 docs
BasementBasement, 2nd floor, and roof demolition and constructionUnder Construction3p · 2 filings · 18 docs
Sub-BasementUnder Construction14p · 3 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
City Line Properties1407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/19/2023$1.3M—Private party → BLOSSOMS BLOOMING LLC$627/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Construction Management & Safety Con505/05/2025
Prime Zone Building Consulting108/13/2024
LWL Associates102/21/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Prime Zone Building Consulting703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Yafe MeodGeneral Contractor907/08/2026
Rock E Small Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CMSC6098305/05/2025
M. International Engineering3129107/26/2024
Hsu & Associates8025101/16/2024
Lam and Co Consulting8864101/16/2024
Building Lifecycle
All (89)Filed (7)Permit Issued (6)Violation (8)Objection (38)Special Inspection (30)
02/05/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/28/2026
Permit issued — Foundation
B01220149-I1-FO
01/28/2026
Permit issued — Structural
B01074977-I1-ST
11/10/2025
Permit issued — General Construction
B00986879-I1-GC
11/07/2025
Violation issued (ECB, open)
Construction
09/04/2025
Objection resolved — Addressed
08/19/2025
Objection resolved — Addressed
08/19/2025
Objection resolved — Addressed
08/13/2025
Objection raised — Cost
08/13/2025
Objection raised — Structural
08/13/2025
Objection raised — Structural
07/31/2025
Objection resolved — Addressed
07/31/2025
Objection resolved — Addressed
06/24/2025
Objection raised — Scope
06/10/2025
Objection resolved — Addressed
06/10/2025
Objection resolved — Addressed
06/10/2025
Objection resolved — Addressed
06/10/2025
Objection resolved — Addressed
06/02/2025
Objection raised — Cost
05/21/2025
Objection resolved — Addressed
05/21/2025
Objection resolved — Addressed
05/21/2025
Objection resolved — Addressed
05/21/2025
Objection resolved — Addressed
05/21/2025
Objection resolved — Addressed
05/21/2025
Objection resolved — Addressed
05/13/2025
Objection raised — Structural
05/13/2025
Objection raised — Structural
05/13/2025
Objection raised — Structural
05/13/2025
Objection raised — Structural
05/13/2025
Objection raised — Structural
05/13/2025
Objection raised — Structural
05/13/2025
Objection raised — Admin
05/13/2025
Objection raised — Structural
05/13/2025
Objection raised — Structural
05/13/2025
Objection raised — Structural
05/05/2025
Filed — Alteration
HORIZONTAL REAR EXTENSION OF THE EXISTING TWO-STORY BUILDING WITH BASEMENT. THE PROPOSED FOUNDATION SHALL CONSIST OF REINFORCED CONCRETE.
B01220149-I1
05/05/2025
Filed — Alteration
HORIZONTAL REAR EXTENSION OF THE EXISTING TWO-STORY BUILDING WITH BASEMENT. THE PROPOSED EXTENSION SHALL UTILIZE CMU AND WOOD STRUCTURAL SYSTEM.
B01074977-I1
05/02/2025
Special inspection requirement — Footing and Foundation
EDUARD GRINFELD
05/02/2025
Special inspection requirement — Masonry
EDUARD GRINFELD
05/02/2025
Special inspection requirement — Structural Steel - Details
EDUARD GRINFELD
05/02/2025
Special inspection requirement — Structural Wood Frame
EDUARD GRINFELD
05/02/2025
Special inspection requirement — Concrete - Cast-In-Place
EDUARD GRINFELD
05/02/2025
Special inspection requirement — Subgrade Inspections
EDUARD GRINFELD
05/02/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Paul Raymond
05/02/2025
Special inspection requirement — Final
BENJAMIN SASSON
08/13/2024
Filed — Alteration
B01095334-I1
08/13/2024
Special inspection requirement — Final
08/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
08/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
08/13/2024
Special inspection requirement — Maintenance information
08/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
08/13/2024
Special inspection requirement — Shutoff dampers
08/13/2024
Special inspection requirement — Mechanical Systems
08/13/2024
Special inspection requirement — Heating Systems
08/13/2024
Special inspection requirement — Energy Code Compliance Inspections
07/26/2024
Filed — Alteration
INSTALL TEMPORARY SHORING AND BRACING AT REAR EXTENSION OF EXISTING 2-STORY W/BASEMENT WOOD FRAME BUILDING FOR STRUCTURAL STABILITY as order by Emergency Enforcement unit, no changes to use, egress or occupancy.
B01074086-P1
07/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
EDUARD GRINFELD
07/08/2024
Permit issued — General Construction
B01074086-I1-GC
07/01/2024
Filed — Alteration
INSTALL TEMPORARY SHORING AND BRACING AT REAR EXTENSION OF EXISTING 2-STORY W/BASEMENT WOOD FRAME BUILDING FOR STRUCTURAL STABILITY as order by Emergency Enforcement unit, no changes to use, egress or occupancy.
B01074086-I1
07/01/2024
Special inspection requirement — Final
BENJAMIN SASSON
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedYafe Meod01/28/2026
DOB NOWStructuralPermit IssuedYafe Meod01/28/2026
DOB NOWGeneral ConstructionPermit IssuedYafe Meod11/10/2025
DOB NOWGeneral ConstructionPermit IssuedYafe Meod07/08/2024
DOB NOWPlumbingPermit IssuedRock E Small Plumbing & Heating02/23/2024
DOB NOWGeneral ConstructionPermit IssuedYafe Meod02/22/2024
1 project · most recent 02/16/2024
General Wiring
FiledStatusContractorScope
02/16/2024Permit IssuedK.A.B. ElectricGeneral Wiring
2 projects · most recent 05/05/2025
Masonry Wood
FiledStatusContractorScope
05/05/2025Permit IssuedYafe Meod1 scope_items
05/05/2025Permit IssuedYafe MeodMasonry, Wood
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
05/02/2025Footing and FoundationEDUARD GRINFELDprogress
05/02/2025MasonryEDUARD GRINFELDspecial
05/02/2025Structural Steel - DetailsEDUARD GRINFELDspecial
05/02/2025Structural Wood FrameEDUARD GRINFELDprogress
05/02/2025Concrete - Cast-In-PlaceEDUARD GRINFELDspecial
05/02/2025Subgrade InspectionsEDUARD GRINFELDspecial
05/02/2025Subsurface Investigations (Borings/Test Pits)Paul Raymondspecial
05/02/2025FinalBENJAMIN SASSONprogress
08/13/2024Final—progress
08/13/2024HVAC-R and service water heating equipment—energy_progress
08/13/2024HVAC-R and service water heating system controls—energy_progress
08/13/2024Maintenance information—energy_progress
08/13/2024HVAC-R and service water piping design and insulation—energy_progress
08/13/2024Shutoff dampers—energy_progress
08/13/2024Mechanical Systems—special
08/13/2024Heating Systems—special
08/13/2024Energy Code Compliance Inspections—progress
07/26/2024Structural Stability – Alterations of existing buildingsEDUARD GRINFELDspecial
07/01/2024FinalBENJAMIN SASSONprogress
07/01/2024Structural Stability – Alterations of existing buildingsEDUARD GRINFELDspecial
01/09/2024Fenestration and door U-factor and product ratingsJICHEN SUNenergy_progress
01/09/2024Interior lighting powerJICHEN SUNenergy_progress
01/09/2024Protection of exposed foundation insulationJICHEN SUNenergy_progress
01/09/2024Fenestration areasJICHEN SUNenergy_progress
01/09/2024Fire-Resistant Penetrations and JointsJICHEN SUNspecial
Latest 25 of 32.
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026B00986879-I1Request digital key ↗
08/25/2026B01008716-I1Request digital key ↗
08/24/2026B01074086-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00986879-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/26/2026B00986879-I1Open ↗
08/24/2026B01074086-I1Open ↗
08/24/2026B01074086-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
10/04/2026B00986879-I1Open ↗
10/04/2026B00986879-I1Open ↗
10/01/2026B01074977-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
10/04/2026B00986879-I1Open ↗
10/04/2026B00986879-I1Open ↗
10/01/2026B01074977-I1Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B00986879-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/26/2026B00986879-I1Open ↗
08/24/2026B01074086-I1Open ↗
08/24/2026B01074086-P1Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01220149-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B01220149-I1Open ↗
▸Other Documents4
▸DOB NOWPlot Diagram2
08/13/2026B00986879-I1Open ↗
08/13/2026B01220149-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00986879-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B00986879-I1Open ↗