315 87 STREET
BROOKLYN · BIN 3153515
💬 Discuss this project
1927Year Built
4Stories
C6Building Class
R5BZoning
14,500 sfGross Floor Area
16Units
Rent Stabilized26 Open Violations 23 unresolved · 3 paperwork only ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 315 87TH OWNERS CORP · 4,000 sf lot · 3.63 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 2 filings · 6 docs
Floor 4Under Construction9p · 5 filings · 20 docs
Floor 3Under Construction9p · 5 filings · 20 docs
Floor 2Under Construction10p · 5 filings · 20 docs
Floor 1Under Construction9p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A A D CONSTRUCTION1809/13/2026
TITAN SERVICES USA308/29/2026
NEW BAY RIDGE CONSTRUCTION CORPORAT207/08/2026
315 87TH OWNERS CORP403/22/2026
31587 OWNERS CORP METROPO103/22/2026
318 87TH STREET OWNERS303/21/2026
318 87TH OWNERS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
IKRA CONSULTING LLC105/04/2026
ASR ENGINEERING PC105/01/2026
SERDAR CEYLAN ARCHITECT, PC704/02/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.A.D. CONSTRUCTION CORPGeneral Contractor404/09/2026
AURA PLUMBING INCPlumbing307/08/2026
TITAN SERVICES USA INCGeneral Contractor206/27/2026
TECHNO-VOLT ELEC, INCElectrical103/22/2026
NEW BAY RIDGE CONST CORPGeneral Contractor106/27/2026
TOPLINE NYC INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IKRA CONSULTING LLC7032105/04/2026
CEYLAN DESIGN AND CONSULT8422504/02/2026
Building Lifecycle
All (117)Filed (9)Permit Issued (11)Signed Off (2)Violation (60)Inspection (5)Special Inspection (30)
08/18/2026
Signed off — Alteration
PROPOSED OF RUSTED WINDOW LINTELS AND POINTING TO BE DONE AS NEEDED AS PER PLANS.NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01391603-I1
08/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/09/2026
Violation issued (ECB, open)
Unknown
07/09/2026
Violation issued (ECB, open)
Construction
06/24/2026
Violation issued (ECB, closed)
Construction
06/24/2026
Violation issued (ECB, open)
Construction
06/23/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/04/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/11/2026
Permit issued — General Construction
B01391603-I1-GC
05/08/2026
Permit issued — Plumbing
B01345715-I1-PL
05/08/2026
Permit issued — Plumbing
B01345702-I1-PL
05/07/2026
Permit issued — General Construction
B01391603-I1-GC
05/04/2026
Filed — Alteration
PROPOSED OF RUSTED WINDOW LINTELS AND POINTING TO BE DONE AS NEEDED AS PER PLANS.NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01391603-I1
05/04/2026
Permit issued — Supported Scaffold
B01394421-I1-SF
05/01/2026
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01394421-I1
05/01/2026
Permit issued — Supported Scaffold
B01394421-I1-SH
04/23/2026
Special inspection requirement — Final
MD MOSTAFA
04/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
MD MOSTAFA
04/23/2026
Special inspection requirement — Masonry
MD MOSTAFA
04/03/2026
Permit issued — Mechanical Systems
B01345710-I1-GC-CX
04/02/2026
Filed — Alteration
THE PLUMBING WORK TYPE IS FILED IN CONJUCTION WITH #B01345695 AS PER PLANS SUBMITTED. NO CHANGE IN EGRESS, USE AND OCCUPANCY.
B01345702-I1
04/02/2026
Filed — Alteration
THE PLUMBING WORK TYPE IS FILED IN CONJUCTION WITH #B01345710 AS PER PLANS SUBMITTED. NO CHANGE IN EGRESS, USE AND OCCUPANCY.
B01345715-I1
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERDAR CEYLAN
03/31/2026
Permit issued — Mechanical Systems
B01345695-I1-GC-CX
03/16/2026
Filed — Alteration
B01345710-I1
03/11/2026
Signed off — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION AND INSTALLATION OF MECHANICAL SYSTEMS IN APARTMENT 1B ON THE FIRST FLOOR, APARTMENT 2B ON THE SECOND FLOOR, APARTMENT 3B ON THE THIRD FLOOR, AND APARTMENT 4B ON THE FOURTH FLOOR OF A MULTI-FAMILY WALK-UP BUILDING
B01251100-I1
03/04/2026
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION AND INSTALLATION OF MECHANICAL SYSTEMS IN APARTMENT 1A ON THE FIRST FLOOR, APARTMENT 2A ON THE SECOND FLOOR, APARTMENT 3A ON THE THIRD FLOOR, AND APARTMENT 4A ON THE FOURTH FLOOR OF A MULTI-FAMILY WALK-UP BUILDING
B01345695-I1
03/02/2026
Permit issued — Mechanical Systems
B01251100-I1-GC-CX
01/13/2026
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
01/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
01/13/2026
Special inspection requirement — Insulation placement and R values
SERDAR CEYLAN
01/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
SERDAR CEYLAN
01/13/2026
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
01/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
SERDAR CEYLAN
01/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
01/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
SERDAR CEYLAN
01/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
01/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
SERDAR CEYLAN
01/13/2026
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
01/13/2026
Special inspection requirement — Mechanical Systems
SERDAR CEYLAN
01/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
SERDAR CEYLAN
01/13/2026
Special inspection requirement — Final
SERDAR CEYLAN
11/24/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/09/2025
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
10/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
SERDAR CEYLAN
10/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
09/30/2025
Filed — Alteration
THE PLUMBING WORK TYPE IS FILED IN CONJUCTION WITH #B01251100 AS PER PLANS SUBMITTED. NO CHANGE IN EGRESS, USE AND OCCUPANCY.
B01251236-P1
09/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
09/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
SERDAR CEYLAN
09/23/2025
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
09/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/23/2025
Permit issued — Plumbing
B01251236-I1-PL
07/22/2025
Permit issued — Mechanical Systems
B01251100-I1-GC-CX
07/07/2025
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION AND INSTALLATION OF MECHANICAL SYSTEMS IN APARTMENT 1B ON THE FIRST FLOOR, APARTMENT 2B ON THE SECOND FLOOR, APARTMENT 3B ON THE THIRD FLOOR, AND APARTMENT 4B ON THE FOURTH FLOOR OF A MULTI-FAMILY WALK-UP BUILDING
B01251100-I1
07/07/2025
Filed — Alteration
THE PLUMBING WORK TYPE IS FILED IN CONJUCTION WITH #B01251100 AS PER PLANS SUBMITTED. NO CHANGE IN EGRESS, USE AND OCCUPANCY.
B01251236-I1
07/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
SERDAR CEYLAN
07/03/2025
Special inspection requirement — Final
SERDAR CEYLAN
07/03/2025
Special inspection requirement — Mechanical Systems
SERDAR CEYLAN
Latest 60 of 117 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNEW BAY RIDGE CONST CORP05/11/2026
DOB NOWPlumbingPermit IssuedAURA PLUMBING INC05/08/2026
DOB NOWPlumbingPermit IssuedAURA PLUMBING INC05/08/2026
DOB NOWGeneral ConstructionSigned-offTOPLINE NYC INC05/07/2026
DOB NOWSupported ScaffoldPermit IssuedTITAN SERVICES USA INC05/04/2026
DOB NOWSupported ScaffoldPermit IssuedTITAN SERVICES USA INC05/01/2026
DOB NOWMechanical SystemsPermit IssuedA.A.D. CONSTRUCTION CORP04/03/2026
DOB NOWMechanical SystemsPermit IssuedA.A.D. CONSTRUCTION CORP03/31/2026
DOB NOWMechanical SystemsSigned-offA.A.D. CONSTRUCTION CORP03/02/2026
DOB NOWPlumbingPermit IssuedAURA PLUMBING INC07/23/2025
DOB NOWMechanical SystemsSigned-offA.A.D. CONSTRUCTION CORP07/22/2025
BISOTISSUEDFRANK CORIGLIANO CONTRACT02/22/2012
BISOTISSUEDKELTIC WOODWORK & CONSTRU02/13/2012
BISBLISSUEDGEE CEE MECH SERVICE INC03/19/2009
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.10/07/2003
1 project · most recent 03/04/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/04/2026Permit IssuedA.A.D. CONSTRUCTION CORPAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ-2D20NL 20,000 BTU · Heat Pump Outdoor ×4
3 projects · most recent 04/02/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/02/2026Permit IssuedAURA PLUMBING INCGas, Water/Sanitary
04/02/2026Permit IssuedAURA PLUMBING INCGas, Water/Sanitary
09/30/2025Permit IssuedAURA PLUMBING INCGas, Water/Sanitary
4 projects · most recent 05/01/2026
General Wiring
FiledStatusContractorScope
05/01/2026Permit IssuedRICHARD NEU—
04/07/2026Permit IssuedTECHNO-VOLT ELEC, INCGeneral Wiring
04/06/2026Permit IssuedTECHNO-VOLT ELEC, INCGeneral Wiring
07/21/2025Permit IssuedTECHNO-VOLT ELEC, INCGeneral Wiring
1 project · most recent 05/01/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/01/2026Permit IssuedTITAN SERVICES USA INCScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/23/2026Pass-Final PL - UndergroundPassView ↗
06/04/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/24/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
04/23/2026FinalMD MOSTAFAprogress
04/23/2026Tenant Protection Plan ComplianceMD MOSTAFAspecial
04/23/2026MasonryMD MOSTAFAspecial
04/02/2026Fire-Resistant Penetrations and JointsSERDAR CEYLANspecial
01/13/2026Energy Code Compliance InspectionsSERDAR CEYLANprogress
01/13/2026HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
01/13/2026Insulation placement and R valuesSERDAR CEYLANenergy_progress
01/13/2026Tenant Protection Plan ComplianceSERDAR CEYLANspecial
01/13/2026Energy Code Compliance InspectionsSERDAR CEYLANprogress
01/13/2026HVAC-R and service water heating equipmentSERDAR CEYLANenergy_progress
01/13/2026HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
01/13/2026HVAC-R and service water heating equipmentSERDAR CEYLANenergy_progress
01/13/2026HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
01/13/2026Tenant Protection Plan ComplianceSERDAR CEYLANspecial
01/13/2026Energy Code Compliance InspectionsSERDAR CEYLANprogress
01/13/2026Mechanical SystemsSERDAR CEYLANspecial
01/13/2026Tenant Protection Plan ComplianceSERDAR CEYLANspecial
01/13/2026FinalSERDAR CEYLANprogress
10/09/2025Tenant Protection Plan Compliance—special
10/09/2025Energy Code Compliance InspectionsSERDAR CEYLANprogress
10/09/2025HVAC-R and service water heating equipmentSERDAR CEYLANenergy_progress
10/09/2025HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
09/23/2025HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
09/23/2025HVAC-R and service water heating equipmentSERDAR CEYLANenergy_progress
09/23/2025Energy Code Compliance InspectionsSERDAR CEYLANprogress
Latest 25 of 32.
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/21/2026B01251100-I1Request digital key ↗
08/20/2026B01251236-I1Request digital key ↗
08/20/2026B01251236-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
02/29/2012320405101Open ↗
02/15/2012320405101Open ↗
03/24/2009310304257Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
09/13/2012320405101Open ↗
12/09/2011320405101Open ↗
03/13/2009310304257Open ↗
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature13
09/23/2026B01251100-I1Open ↗
09/23/2026B01345695-I1Open ↗
09/23/2026B01345695-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026B01251100-I1Open ↗
08/20/2026B01251236-P1Open ↗
08/20/2026B01251236-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026B01345695-I1Open ↗
09/23/2026B01251100-I1Open ↗
09/01/2026B01345702-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
10/12/2012320405101Open ↗
02/15/2012320405101Open ↗
12/09/2011320405101Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/13/2009310304257Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/13/2009310304257Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/13/2009310304257Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026B01251100-I1Open ↗
08/20/2026B01251236-P1Open ↗
08/20/2026B01251236-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
12/09/2011320405101Open ↗
03/13/2009310304257Open ↗
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS2
12/09/2011320405101Open ↗
03/13/2009310304257Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/19/2012320405101Open ↗
07/27/2009310304257Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
10/12/2012320405101Open ↗
09/13/2012320405101Open ↗
12/19/2011320405101Open ↗