← Back
BuildNYC
Walk-up cooperative
315 87TH STREET
BROOKLYN · Bay Ridge · BIN 3153515
💬 Discuss this project
1927Year Built
4Stories
C6Building Class
R5BZoning
14,500 sfGross Floor Area
16Units
Rent Stabilized19 Active Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 315 87th Owners · 4,000 sf lot · 3.63 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 4 filings · 20 docs
Floor 4Unit 4A, Unit 4B, Unit 4C +1Under Construction9p · 7 filings · 20 docs
Floor 3Unit 3A, Unit 3B, Unit 3C +1Under Construction9p · 7 filings · 20 docs
Floor 2Unit 2A, Unit 2B, Unit 2C +1Under Construction10p · 7 filings · 20 docs
Floor 1Unit 1A, Unit 1B, Unit 1C +1Under Construction29p · 8 filings · 20 docs
Site & exteriorFacade repair, window lintels, and pointing3p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
315 87th Owners803/22/2026
New Bay Ridge Construction207/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Serdar Ceylan Architect910/05/2026
Ikra Consulting105/04/2026
Asr Engineering105/01/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.A.D. ConstructionGeneral Contractor404/09/2026
Aura PlumbingPlumbing307/08/2026
Titan Services USAScaffold206/27/2026
Techno-Volt ElectricElectrical103/22/2026
New Bay Ridge ConstructionGeneral Contractor106/27/2026
Topline NYCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ceylan Design and Consulting8422610/02/2026
Ikra Consulting7032105/04/2026
Building Lifecycle
All (117)Filed (11)Permit Issued (11)Signed Off (2)Violation (60)Inspection (3)Special Inspection (30)
10/05/2026
Filed — Alteration
SUBSEQUENTLY FILED THE PLUMBING WORK TYPE AS PER PLANS SUBMITTED. NO CHANGE IN EGRESS, USE AND OCCUPANCY.
B01345722-S1
10/02/2026
Filed — Alteration
SUBSEQUENTLY FILED THE PLUMBING WORK TYPE AS PER PLANS SUBMITTED. NO CHANGE IN EGRESS, USE AND OCCUPANCY.
B01345722-I1
09/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
09/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
09/15/2026
Special inspection requirement — Energy Code Compliance Inspections
09/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/18/2026
Signed off — Alteration
PROPOSED OF RUSTED WINDOW LINTELS AND POINTING TO BE DONE AS NEEDED AS PER PLANS.NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01391603-I1
07/09/2026
Violation issued (ECB, closed)
Construction
07/09/2026
Violation issued (ECB, closed)
Unknown
06/24/2026
Violation issued (ECB, closed)
Construction
06/24/2026
Violation issued (ECB, closed)
Construction
06/23/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/04/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/11/2026
Permit issued — General Construction
B01391603-I1-GC
05/08/2026
Permit issued — Plumbing
B01345715-I1-PL
05/08/2026
Permit issued — Plumbing
B01345702-I1-PL
05/07/2026
Permit issued — General Construction
B01391603-I1-GC
05/04/2026
Filed — Alteration
PROPOSED OF RUSTED WINDOW LINTELS AND POINTING TO BE DONE AS NEEDED AS PER PLANS.NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01391603-I1
05/04/2026
Permit issued — Supported Scaffold
B01394421-I1-SF
05/01/2026
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01394421-I1
05/01/2026
Permit issued — Sidewalk Shed
B01394421-I1-SH
04/23/2026
Special inspection requirement — Masonry
MD MOSTAFA
04/23/2026
Special inspection requirement — Final
MD MOSTAFA
04/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
MD MOSTAFA
04/03/2026
Permit issued — General Construction
B01345710-I1-GC-CX
04/02/2026
Filed — Alteration
THE PLUMBING WORK TYPE IS FILED IN CONJUCTION WITH #B01345695 AS PER PLANS SUBMITTED. NO CHANGE IN EGRESS, USE AND OCCUPANCY.
B01345702-I1
04/02/2026
Filed — Alteration
THE PLUMBING WORK TYPE IS FILED IN CONJUCTION WITH #B01345710 AS PER PLANS SUBMITTED. NO CHANGE IN EGRESS, USE AND OCCUPANCY.
B01345715-I1
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERDAR CEYLAN
03/31/2026
Permit issued — General Construction
B01345695-I1-GC-CX
03/16/2026
Filed — Alteration
B01345710-I1
03/11/2026
Signed off — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION AND INSTALLATION OF MECHANICAL SYSTEMS IN APARTMENT 1B ON THE FIRST FLOOR, APARTMENT 2B ON THE SECOND FLOOR, APARTMENT 3B ON THE THIRD FLOOR, AND APARTMENT 4B ON THE FOURTH FLOOR OF A MULTI-FAMILY WALK-UP BUILDING
B01251100-I1
03/04/2026
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION AND INSTALLATION OF MECHANICAL SYSTEMS IN APARTMENT 1A ON THE FIRST FLOOR, APARTMENT 2A ON THE SECOND FLOOR, APARTMENT 3A ON THE THIRD FLOOR, AND APARTMENT 4A ON THE FOURTH FLOOR OF A MULTI-FAMILY WALK-UP BUILDING
B01345695-I1
03/02/2026
Permit issued — Mechanical Systems
B01251100-I1-GC-CX
01/13/2026
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
01/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
SERDAR CEYLAN
01/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
01/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
SERDAR CEYLAN
01/13/2026
Special inspection requirement — Mechanical Systems
SERDAR CEYLAN
01/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
SERDAR CEYLAN
01/13/2026
Special inspection requirement — Final
SERDAR CEYLAN
01/13/2026
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
01/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
01/13/2026
Special inspection requirement — Insulation placement and R values
SERDAR CEYLAN
01/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
SERDAR CEYLAN
01/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
SERDAR CEYLAN
01/13/2026
Special inspection requirement — Mechanical Systems
SERDAR CEYLAN
01/13/2026
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
01/13/2026
Special inspection requirement — Final
SERDAR CEYLAN
01/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
01/13/2026
Special inspection requirement — Insulation placement and R values
SERDAR CEYLAN
01/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
SERDAR CEYLAN
01/13/2026
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
01/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
11/24/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
10/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/30/2025
Filed — Alteration
THE PLUMBING WORK TYPE IS FILED IN CONJUCTION WITH #B01251100 AS PER PLANS SUBMITTED. NO CHANGE IN EGRESS, USE AND OCCUPANCY.
B01251236-P1
07/23/2025
Permit issued — Plumbing
B01251236-I1-PL
07/22/2025
Permit issued — Mechanical Systems
B01251100-I1-GC-CX
07/07/2025
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION AND INSTALLATION OF MECHANICAL SYSTEMS IN APARTMENT 1B ON THE FIRST FLOOR, APARTMENT 2B ON THE SECOND FLOOR, APARTMENT 3B ON THE THIRD FLOOR, AND APARTMENT 4B ON THE FOURTH FLOOR OF A MULTI-FAMILY WALK-UP BUILDING
B01251100-I1
Latest 60 of 117 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNew Bay Ridge Construction05/11/2026
DOB NOWPlumbingPermit IssuedAura Plumbing05/08/2026
DOB NOWPlumbingPermit IssuedAura Plumbing05/08/2026
DOB NOWGeneral ConstructionSigned-offTopline NYC05/07/2026
DOB NOWSupported ScaffoldPermit IssuedTitan Services USA05/04/2026
DOB NOWSidewalk ShedPermit IssuedTitan Services USA05/01/2026
DOB NOWGeneral ConstructionPermit IssuedA.A.D. Construction04/03/2026
DOB NOWGeneral ConstructionPermit IssuedA.A.D. Construction03/31/2026
DOB NOWMechanical SystemsSigned-offA.A.D. Construction03/02/2026
DOB NOWPlumbingPermit IssuedAura Plumbing07/23/2025
DOB NOWMechanical SystemsSigned-offA.A.D. Construction07/22/2025
BISOTISSUEDFrank Corigliano Contracting02/22/2012
BISOTISSUEDKeltic Woodwork & Construction02/13/2012
BISBLISSUEDGee Cee Mechanical Service03/19/2009
BISEQISSUEDYork Scaffold Equipment10/07/2003
2 projects · most recent 10/05/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/05/2026——Air Conditioning Systems
Cooling
Mitsubishi Electric MXZ-2D20NL 20,000 BTU · Heat Pump Outdoor ×4
03/04/2026Permit IssuedA.A.D. ConstructionAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ-2D20NL 20,000 BTU · Heat Pump Outdoor ×4
4 projects · most recent 10/05/2026
Gas Water/Sanitary
FiledStatusContractorScope
10/05/2026——Gas, Water/Sanitary
04/02/2026Permit IssuedAura PlumbingGas, Water/Sanitary
04/02/2026Permit IssuedAura PlumbingGas, Water/Sanitary
09/30/2025Permit IssuedAura PlumbingGas, Water/Sanitary
4 projects · most recent 05/01/2026
General Wiring
FiledStatusContractorScope
05/01/2026Permit IssuedRichard Neu—
04/07/2026Permit IssuedTechno-Volt ElectricGeneral Wiring
04/06/2026Permit IssuedTechno-Volt ElectricGeneral Wiring
07/21/2025Permit IssuedTechno-Volt ElectricGeneral Wiring
1 project · most recent 05/01/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/01/2026Permit IssuedTitan Services USAScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/23/2026Pass-Final PL - UndergroundPassView ↗
06/04/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/24/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
09/15/2026HVAC-R and service water heating equipment—energy_progress
09/15/2026HVAC-R and service water piping design and insulation—energy_progress
09/15/2026Energy Code Compliance Inspections—progress
09/15/2026Tenant Protection Plan Compliance—special
04/23/2026MasonryMD MOSTAFAspecial
04/23/2026FinalMD MOSTAFAprogress
04/23/2026Tenant Protection Plan ComplianceMD MOSTAFAspecial
04/02/2026Fire-Resistant Penetrations and JointsSERDAR CEYLANspecial
01/13/2026Energy Code Compliance InspectionsSERDAR CEYLANprogress
01/13/2026HVAC-R and service water heating equipmentSERDAR CEYLANenergy_progress
01/13/2026HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
01/13/2026HVAC-R and service water heating equipmentSERDAR CEYLANenergy_progress
01/13/2026Mechanical SystemsSERDAR CEYLANspecial
01/13/2026Tenant Protection Plan ComplianceSERDAR CEYLANspecial
01/13/2026FinalSERDAR CEYLANprogress
01/13/2026Energy Code Compliance InspectionsSERDAR CEYLANprogress
01/13/2026HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
01/13/2026Insulation placement and R valuesSERDAR CEYLANenergy_progress
01/13/2026Tenant Protection Plan ComplianceSERDAR CEYLANspecial
01/13/2026Tenant Protection Plan ComplianceSERDAR CEYLANspecial
01/13/2026Mechanical SystemsSERDAR CEYLANspecial
01/13/2026Energy Code Compliance InspectionsSERDAR CEYLANprogress
01/13/2026FinalSERDAR CEYLANprogress
01/13/2026HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
01/13/2026Insulation placement and R valuesSERDAR CEYLANenergy_progress
Latest 25 of 42.
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
10/04/2026B01345722-I1Request digital key ↗
08/21/2026B01251100-I1Request digital key ↗
08/20/2026B01251236-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
02/29/2012320405101Open ↗
02/15/2012320405101Open ↗
03/24/2009310304257Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
09/13/2012320405101Open ↗
12/09/2011320405101Open ↗
03/13/2009310304257Open ↗
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature15
10/07/2026B01345722-I1Open ↗
10/07/2026B01345722-I1Open ↗
09/23/2026B01251100-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
10/07/2026B01345722-S1Open ↗
10/04/2026B01345722-I1Open ↗
08/21/2026B01251100-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
10/07/2026B01345722-I1Open ↗
09/23/2026B01251100-I1Open ↗
09/23/2026B01345695-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
10/12/2012320405101Open ↗
02/15/2012320405101Open ↗
12/09/2011320405101Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/13/2009310304257Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/13/2009310304257Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/13/2009310304257Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
10/07/2026B01345722-S1Open ↗
10/04/2026B01345722-I1Open ↗
08/21/2026B01251100-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
12/09/2011320405101Open ↗
03/13/2009310304257Open ↗
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS2
12/09/2011320405101Open ↗
03/13/2009310304257Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/19/2012320405101Open ↗
07/27/2009310304257Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
10/12/2012320405101Open ↗
09/13/2012320405101Open ↗
12/19/2011320405101Open ↗