Elevator cooperative
315 EAST 77 STREET
💬 Discuss this project
1928Year Built
6Stories
D4Building Class
R8BZoning
43,878 sfGross Floor Area
64Units
LL97 CoveredRent Stabilized4 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: 31577 OWNERS CORP · 10,217 sf lot · 4.29 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 7 docs
Bulkhead1p · 1 filing · 7 docs
Floor 62p · 1 filing · 19 docs
Floor 52p · 1 filing · 19 docs
Floor 42p · 1 filing · 19 docs
Floor 33p · 1 filing · 19 docs
Floor 2Under Construction10p · 2 filings · 20 docs
Floor 12p · 1 filing · 19 docs
Cellar3p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKAM ASSOCIATES1504/09/2026
PRAT ENTERPRISES CORP1303/22/2026
31577 OWNERS2303/22/2026
31577 OWNERS CORP./RUDD R103/22/2026
31477 OWNERS CORP.103/22/2026
BELLMARC PROPERTY MGMT SE103/22/2026
315 OWNERS503/21/2026
REALTY MANAGEMENT103/21/2026
DERMER MANAGEMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PRAT ENTERPRISES203/21/2026
HOWARD L ZIMMERMAN ARCHITECTS1003/21/2026
Rigid Structural Design, LLC303/21/2026
OUTSOURCE CONSULTANTS, INC.103/21/2026
J CALLAHAN CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRAT ENTERPRISES CORPGeneral Contractor1007/08/2026
WTC PLBG & HEATING CORPPlumbing207/08/2026
TORRES IVANElectrical103/21/2026
K.R.S. RENOVATION CORPGeneral Contractor104/09/2026
REMEDY ELECTRIC LLCElectrical103/22/2026
M&G PLUMBING AND HEATINGPlumbing107/08/2026
R & G MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HOWARD L ZIMMERMAN ARCHIT1712503/06/2024
CHEN ENGINEERING SERVICES1826111/14/2022
OUTSOURCE SPECIAL INSPECT2827111/04/2022
Building Lifecycle
All (109)Filed (16)Permit Issued (10)Signed Off (6)Facade (FISP) (12)Violation (36)Inspection (1)Objection (14)Special Inspection (14)
05/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/07/2026
Permit issued — General Construction
M00964516-I1-GC
11/07/2025
Permit issued — Plumbing
M00964516-S1-PL
07/15/2025
Special inspection requirement — Final
NORMAN DAVIS III
07/15/2025
Special inspection requirement — Preliminary
NORMAN DAVIS III
06/25/2025
Filed — Alteration
REPLACE KITCHEN SINK, SUPPLY VALVES, SUPPLY LINES, FAUCET, DRAIN. All work confined to Apt. 2G
M00964516-P3
05/27/2025
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00858869-I1
05/27/2025
Signed off — Alteration
INSTALLATION AND USE OF SUSPENDED SCAFFOLD FOR FACADE RESTORATION/INSPECTION AS PER PLANS SUBMITTED
M01122900-I1
05/09/2025
Special inspection requirement — Preliminary
NORMAN DAVIS III
05/09/2025
Special inspection requirement — Final
03/05/2025
Signed off — Alteration
MISCELLANEOUS FACADE RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08014635-I1
12/04/2024
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01087803-I1
10/28/2024
Cycle 9 facade report signed — SAFE
10/09/2024
Permit issued — Suspended Scaffold
M01122900-I1-SC
10/07/2024
Filed — Alteration
INSTALLATION AND USE OF SUSPENDED SCAFFOLD FOR FACADE RESTORATION/INSPECTION AS PER PLANS SUBMITTED
M01122900-I1
10/02/2024
Cycle 9 facade report submitted
09/24/2024
Cycle 9 facade inspection completed
08/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/31/2024
Permit issued — Supported Scaffold
M01087803-I1-SF
07/30/2024
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01087803-I1
06/07/2024
Permit issued — Sidewalk Shed
M00858869-I1-SH
05/06/2024
Signed off — Alteration
Gas piping replacement throughout building. No change in egress, use or occupancy.
M00206935-I1
04/18/2024
Signed off — Alteration
FILING HEREWITH MINOR PLUMBING CHANGES IN ASSOCIATE WITH ARCHITECTURAL WORK FILED AT THE BOROUGH OFFICE # 123791085 NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00225937-I1
03/27/2024
Violation issued (HPD, open)
B
03/27/2024
Violation issued (HPD, open)
C
03/27/2024
Violation issued (HPD, open)
C
03/06/2024
Filed — Alteration
Gas piping replacement throughout building. No change in egress, use or occupancy.
M00206935-P5
03/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jon Colatrella
03/01/2024
Permit issued — General Construction
M08014635-I1-GC
01/25/2024
Cycle 9 facade report submitted
01/25/2024
Cycle 9 facade report signed — UNSAFE
01/25/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/24/2024
Objection resolved — Addressed
01/24/2024
Objection resolved — Addressed
01/24/2024
Objection resolved — Addressed
01/24/2024
Objection resolved — Addressed
01/24/2024
Objection resolved — Addressed
01/24/2024
Objection resolved — Addressed
01/11/2024
Cycle 9 facade inspection completed
12/11/2023
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00858869-P1
12/08/2023
Objection raised — Other
12/08/2023
Objection raised — Other
12/08/2023
Objection raised — Other
12/08/2023
Objection raised — Other
12/08/2023
Objection raised — Other
12/08/2023
Objection raised — Other
11/29/2023
Filed — Alteration
REPLACE KITCHEN SINK, SUPPLY VALVES, SUPPLY LINES, FAUCET, DRAIN. All work confined to Apt. 2G
M00964516-S1
11/29/2023
Filed — Alteration
REPLACE KITCHEN SINK, SUPPLY VALVES, SUPPLY LINES, FAUCET, DRAIN. All work confined to Apt. 2G
M00964516-I1
06/29/2023
Permit issued — Sidewalk Shed
M00858869-I1-SH
06/28/2023
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00858869-I1
11/28/2022
Filed — Alteration
RENOVATION OF APARTMENT 1J TO INCLUDE MINOR REMOVAL AND INSTALLATION OF NON LOAD BEARING INTERIOR PARTITIONS AND FINISHES. REPLACE PLUMBING FIXTURES AS PER SCHEDULE B AND PLANS FILED HEREWITH. NO CHANGE, ETC.
M00787350-I1
11/14/2022
Filed — Alteration
M00787351-I1
11/04/2022
Filed — Alteration
MISCELLANEOUS FACADE RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08014635-I1
10/03/2022
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
10/03/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
JONAR MADRIAGA
10/03/2022
Special inspection requirement — Masonry
JONAR MADRIAGA
10/03/2022
Special inspection requirement — Final
Nicholas Ferrara
08/12/2022
Special inspection requirement — Lighting controls
Joshua Manes
08/12/2022
Special inspection requirement — Lighting in dwelling units
Joshua Manes
08/03/2022
Special inspection requirement — Final
Joshua Manes
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKRS RENOVATION01/07/2026
DOB NOWPlumbingSigned-offR & G MECHANICAL CORP11/07/2025
DOB NOWSuspended ScaffoldPermit IssuedPRATT CONSTRUCTION & RES10/09/2024
DOB NOWSupported ScaffoldSigned-offPRAT ENTERPRISES CORP07/31/2024
DOB NOWSidewalk ShedSigned-offPRAT ENTERPRISES CORP06/07/2024
DOB NOWGeneral ConstructionSigned-offPRAT ENTERPRISES CORP03/01/2024
DOB NOWSidewalk ShedSigned-offPRAT ENTERPRISES CORP06/29/2023
DOB NOWPlumbingSigned-offM&G PLUMBING AND HEATING03/03/2020
DOB NOWPlumbingSigned-offWTC PLBG & HEATING CORP01/03/2020
DOB NOWPlumbingSigned-offWTC PLBG & HEATING CORP09/26/2019
BISOTISSUEDC. MIZZI CONSTRUCTION COR02/21/2020
BISPLISSUEDP.S.I. MECHANICAL10/23/2017
BISEQISSUEDRSG CONSTRUCTION CORP12/16/2016
BISOTISSUEDJV CONSTRUCTION & PAINTIN12/06/2016
BISPLISSUEDJNR PLUMBING INC DBA03/18/2016
BISOTISSUEDC & M HOME IMPROVEMENT INC03/09/2016
BISOTISSUEDRCD RESTORATIONS INC02/04/2016
BISEQISSUEDROCKLEDGE SCAFFOLD CORP07/30/2015
BISOTISSUEDCITY DESIGN SERVICES LTD04/16/2014
BISOTISSUEDLEGACY BUILDERS/DEVELOPERS CORP01/17/2014
BISPLISSUEDTARDIO PLUMBING, LLC10/04/2012
BISFBISSUEDGEE CEE MECH SERVICE INC10/02/2012
BISOTISSUEDGPS PAINTING OF NY INC05/19/2009
BISOTISSUEDDF RESTORATION INC10/01/2007
BISPLISSUEDNEW YORK STANDARD MECH CORP03/30/2004
BISOTISSUEDDBA CODFISH PARK DESIGN03/03/2004
BISOTISSUEDHELENA CONTRACTING CORP09/10/2002
BISEQISSUEDROCKLEDGE SCAFFOLD09/25/1996
BISFSISSUEDOIL SAVE CORP.11/21/1990
1 project · most recent 06/25/2025
Water/Sanitary
FiledStatusContractorScope
06/25/2025Signed-offR & G MECHANICAL CORPWater/Sanitary
14 projects · most recent 05/07/2026
General Wiring
FiledStatusContractorScope
05/07/2026CompleteURBANO'S ELECTRICAL CORP—
05/05/2026CompleteSMART ELECTRIC SERVICESGeneral Wiring
04/24/2026CompleteSAFETECH ELECL CONTNG COR—
01/08/2026Permit IssuedBANNER ELECTRIC INCGeneral Wiring
08/17/2025CompleteURBANO'S ELECTRICAL CORPGeneral Wiring
05/21/2024CompleteURBANO'S ELECTRICAL CORPGeneral Wiring
04/04/2024CompletePAUL M. & SON'S ELECL CONGeneral Wiring
12/19/2023CompleteAURORA ELECL CONTG INC—
11/28/2022CompleteNY ELECT MAINT & DATA CORGeneral Wiring
04/20/2022CompletePAC ELECTRIC CORP.General Wiring
01/29/2021Permit IssuedREMEDY ELECTRIC LLCGeneral Wiring
07/10/2019Permit IssuedSTAR ELEC'L CONTRACTORS C—
08/19/2018Permit IssuedGRX EURO ELECTRIC CORPGeneral Wiring
04/11/2018CompleteBELMONT ELECTRICAL, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
07/15/2025FinalNORMAN DAVIS IIIprogress
07/15/2025PreliminaryNORMAN DAVIS IIIprogress
05/09/2025PreliminaryNORMAN DAVIS IIIprogress
05/09/2025Final—progress
03/06/2024Fire-Resistant Penetrations and JointsJon Colatrellaspecial
10/03/2022Post-installed AnchorsJONAR MADRIAGAspecial
10/03/2022Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
10/03/2022MasonryJONAR MADRIAGAspecial
10/03/2022FinalNicholas Ferraraprogress
08/12/2022Lighting controlsJoshua Manesenergy_progress
08/12/2022Lighting in dwelling unitsJoshua Manesenergy_progress
08/03/2022FinalJoshua Manesprogress
11/23/2021Fire-Resistant Penetrations and JointsJon Colatrellaspecial
02/03/2020Fire-Resistant Penetrations and JointsJon Colatrellaspecial
▾Documents — 183 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch10
09/01/2026M08014635-I1Request digital key ↗
09/01/2026M00787351-I1Request digital key ↗
09/01/2026M00787350-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00225937-I1Request digital key ↗
08/27/2026M00206935-I1Request digital key ↗
08/27/2026M00206935-P4Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits25
▸BISWORK PERMIT APPLICATION13
02/24/2020123791085Open ↗
10/26/2017122959478Open ↗
12/15/2016140585515Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
01/17/2020123791085Open ↗
04/19/2017122959478Open ↗
12/15/2016140585515Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications60
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/01/2026M00787350-I1Open ↗
08/30/2026M00858869-I1Open ↗
08/30/2026M00858869-P1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
02/24/2020123791085Open ↗
01/17/2020123791085Open ↗
12/26/2017122959478Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
12/15/2016140585515Open ↗
12/06/2016122959478Open ↗
12/06/2016122959478Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
12/06/2016122959478Open ↗
02/01/2016122668835Open ↗
08/11/2015122473910Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/26/2026M00787350-I1Open ↗
08/26/2026M00787350-I1Open ↗
08/26/2026M00787350-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026M00206935-P2Open ↗
08/24/2026M00206935-I1Open ↗
08/23/2026M08014635-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/15/2016140585515Open ↗
07/29/2015140382672Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/15/2016140585515Open ↗
07/29/2015140382672Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
10/02/2012121397167Open ↗
05/14/2009120035354Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
04/19/2017122959478Open ↗
12/06/2016122959478Open ↗
08/11/2015122473910Open ↗
▸BISSCHEDULE B - PLUMBING2
10/02/2012121397167Open ↗
05/14/2009120035354Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/02/2012121397167Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
03/14/2013121397167Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
03/14/2013121397167Open ↗
▸Safety & Tenant Protection7
▸DOB NOWTenant Protection Plan5
08/13/2026M00206935-I1Open ↗
08/13/2026M00206935-P4Open ↗
08/13/2026M00206935-P3Open ↗
Showing 3 of 5 on file for this type
▸BISTenant Protection Plan and Notes2
01/17/2020123791085Open ↗
12/06/2016122959478Open ↗
▸Environmental & Asbestos18
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
12/06/2019123791085Open ↗
12/06/2016122959478Open ↗
02/01/2016122668835Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026M00787350-I1Open ↗
08/23/2026M00964516-I1Open ↗
08/13/2026M08014635-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
05/13/2009120035354Open ↗
05/14/2009120035354Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
02/07/2014121857874Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/27/2026M00206935-I1Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
01/17/2020123791085Open ↗
12/26/2017122959478Open ↗
12/09/2016122959478Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
04/29/2021123791085Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
07/29/2015140382672Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/29/2021123791085Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
04/29/2021123791085Open ↗
04/29/2021123791085Open ↗
12/15/2016140585515Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
04/29/2021123791085Open ↗
12/26/2017122959478Open ↗
12/13/2016122473910Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
12/08/2016122959478Open ↗
10/02/2012121397167Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
04/29/2021123791085Open ↗
01/17/2020123791085Open ↗
12/26/2017122959478Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms12
▸BISEFILING COVER SHEET7
01/17/2020123791085Open ↗
12/06/2016122959478Open ↗
02/01/2016122668835Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
12/15/2016140585515Open ↗
07/29/2015140382672Open ↗
▸BISADDITIONAL INFORMATION2
04/19/2017122959478Open ↗
04/05/2017122959478Open ↗
▸BISBOROUGH INTAKE FORM1
12/26/2017122959478Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/15/2014121857874Open ↗
▸DOB NOWCalculations1
08/13/2026M01122900-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01122900-I1Open ↗