ECB05/18/2022FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER : AT TIME OF INSPECTION, OBSERVED LOOSE PIECES OF CONSTRUCTION MATERIALS, RIGID FOAM BOARDS SCATTERED ON ROOF AT EXPOSURE 2 AT THE ABOVE LOCATION., REPAIR ANothing owed — awaiting certificate of correction
Post office · 12,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.