← Back
One family attached or semi-detached
315 NARROWS ROAD NORTH
STATEN ISLAND · BIN 5130185
💬 Discuss this project
1998Year Built
2Stories
A5Building Class
R3-2Zoning
1,176 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
One family attached or semi-detached · 2,987 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER OF 315 NARROWS R103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WILLY C. YUIN ARCH. PLLC401/13/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AHMED AMIN PE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
123 HEATING & COOLINGGeneral Contractor204/09/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
Building Lifecycle
All (27)Filed (4)Permit Issued (3)Signed Off (2)Violation (7)Inspection (5)Special Inspection (6)
03/13/2026
Signed off — Alteration
INSTALLATIONS OF NEW LAVATORY, TOILET ,SHOWER STALL AND SLOPE SINK. CAP AND REMOVE ONE GAS RANGE, LAVATROY, TOILET, SHOWER STALL , KITCHEN SINK . RELOACTE EXISTING GAS DRYER AND WASHING MACHINE AS PER PLANS.
S01181998-I1
02/27/2026
Signed off — Alteration
INSTALLATIONS OF NEW LAVATORY, TOILET ,SHOWER STALL AND SLOPE SINK. CAP AND REMOVE ONE GAS RANGE, LAVATROY, TOILET, SHOWER STALL , KITCHEN SINK . RELOACTE EXISTING GAS DRYER AND WASHING MACHINE AS PER PLANS.
S01181998-S2
01/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Willy Yuin
01/13/2026
Filed — Alteration
INSTALLATIONS OF NEW LAVATORY, TOILET ,SHOWER STALL AND SLOPE SINK. CAP AND REMOVE ONE GAS RANGE, LAVATROY, TOILET, SHOWER STALL , KITCHEN SINK . RELOACTE EXISTING GAS DRYER AND WASHING MACHINE AS PER PLANS.
S01181998-P2
10/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/22/2025
Filed — Alteration
INSTALLATIONS OF NEW LAVATORY, TOILET ,SHOWER STALL AND SLOPE SINK. CAP AND REMOVE ONE GAS RANGE, LAVATROY, TOILET, SHOWER STALL , KITCHEN SINK . RELOACTE EXISTING GAS DRYER AND WASHING MACHINE AS PER PLANS.
S01181998-P1
09/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Willy Yuin
08/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/30/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/08/2025
Permit issued — Plumbing
S01181998-S2-PL
04/22/2025
Permit issued — General Construction
S01181998-I1-GC
04/02/2025
Permit issued — General Construction
S01181998-I1-GC
03/25/2025
Filed — Alteration
INSTALLATIONS OF NEW LAVATORY, TOILET ,SHOWER STALL AND SLOPE SINK. CAP AND REMOVE ONE GAS RANGE, LAVATROY, TOILET, SHOWER STALL , KITCHEN SINK . RELOACTE EXISTING GAS DRYER AND WASHING MACHINE AS PER PLANS.
S01181998-S2
02/25/2025
Filed — Alteration
INSTALLATIONS OF NEW LAVATORY, TOILET ,SHOWER STALL AND SLOPE SINK. CAP AND REMOVE ONE GAS RANGE, LAVATROY, TOILET, SHOWER STALL , KITCHEN SINK . RELOACTE EXISTING GAS DRYER AND WASHING MACHINE AS PER PLANS.
S01181998-I1
02/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Willy Yuin
02/20/2025
Special inspection requirement — Fenestration areas
Willy Yuin
02/20/2025
Special inspection requirement — Fenestration air leakage
Willy Yuin
02/15/2025
Special inspection requirement — Final
Willy Yuin
05/04/2021
Violation issued (ECB, closed)
Construction
06/03/2020
Violation issued (ECB, closed)
Construction
02/19/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/23/2019
Violation issued (ECB, closed)
Unknown
11/23/2019
Violation issued (ECB, closed)
Construction
06/12/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/14/1998
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP05/08/2025
DOB NOWGeneral ConstructionSigned-off123 HEATING & COOLING04/22/2025
DOB NOWGeneral ConstructionSigned-off123 HEATING & COOLING04/02/2025
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/30/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/30/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
01/20/2026HVAC-R and service water piping design and insulationWilly Yuinenergy_progress
09/11/2025HVAC-R and service water piping design and insulationWilly Yuinenergy_progress
02/20/2025Fenestration and door U-factor and product ratingsWilly Yuinenergy_progress
02/20/2025Fenestration areasWilly Yuinenergy_progress
02/20/2025Fenestration air leakageWilly Yuinenergy_progress
02/15/2025FinalWilly Yuinprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026S01181998-I1Request digital key ↗
08/20/2026S01181998-S2Request digital key ↗
08/20/2026S01181998-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/20/2026S01181998-S2Open ↗
08/20/2026S01181998-P1Open ↗
08/13/2026S01181998-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026S01181998-I1Open ↗
09/02/2026S01181998-I1Open ↗
08/25/2026S01181998-S2Open ↗
Showing 3 of 4 on file for this type