← Back
BuildNYC
Elevator cooperative
315 RIVERSIDE DRIVE
MANHATTAN · BIN 1057207
💬 Discuss this project
1930Year Built
19Stories
D4Building Class
R8Zoning
128,461 sfGross Floor Area
93Units
LL97 CoveredRent Stabilized4 Active Violations 2 likely answered ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · 8,683 sf lot · 14.79 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBasement and sidewalk workUnder Construction1p · 1 filing · 4 docs
Floor 17Supported scaffold installation2p · 1 filing · 10 docs
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12Unit 12D5p · 1 filing · 9 docs
Floor 11Unit 11D1 filing · 8 docs
Floor 10Unit 10D1 filing · 4 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Unit 1A1 filing · 14 docs
CellarBasement and sidewalk workUnder Construction1p · 2 filings · 18 docs
BasementBasement and sidewalk workUnder Construction1p · 1 filing · 4 docs
Sub-BasementBasement and sidewalk workUnder Construction1 filing · 4 docs
Site & exteriorTemporary construction fence installationUnder Construction26p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
315 Homes7503/21/2026
Matthew Adam Properties2203/21/2026
315 Riverside Drive203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
All City Engineering210/13/2026
KZ Engineering109/22/2026
Kushner Studios109/09/2026
Sarah Gordon Drake Architect109/18/2025
Cowley Engineering104/10/2024
Rand Engineering & Architecture212/28/2022
PCS Engineering510/25/2021
Pavane & Kwalbrun203/31/2021
Zirinsky Architecture103/11/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Zirinsky Architecture403/21/2026
Na & Partners Building Consultants1003/21/2026
Rand Engineering & Arch403/21/2026
Leslie McKenzie103/21/2026
Maryclare Nepogoda103/21/2026
Theresa Voltaggio103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
New Force ConstructionScaffold1007/08/2026
Constructors Trades & SkiGeneral Contractor307/08/2026
Sterling ElectricElectrical103/21/2026
R & L SystemsElectrical103/21/2026
Philip A. RobinsonElectrical103/21/2026
Delta Star ElectricElectrical103/21/2026
Arree ElectricElectrical103/22/2026
T. McCaffrey-T. McGovernElectrical103/22/2026
Monaco Group USAGeneral Contractor104/09/2026
Constructors Trades & SkiScaffold109/25/2026
Fried Electric CoElectrical103/21/2026
Norway ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sarah Gordon Drake Architects4744109/18/2025
Cowley Engineering186104/10/2024
Outsource Special Inspection2827104/10/2024
Rand Engineering & Architects266212/28/2022
Zirinsky Architecture1310103/11/2021
Building Lifecycle
All (146)Filed (17)Permit Issued (15)Signed Off (3)Facade (FISP) (12)Violation (60)Objection (14)Special Inspection (25)
10/13/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING RESIDENTIAL DWELLING UNIT INCLUDING NEW FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREIN. NO CHANGE IN USE, OCCUPANCY OR EGRESS
M01455383-S1
10/13/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING RESIDENTIAL DWELLING UNIT INCLUDING NEW FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREIN. NO CHANGE IN USE, OCCUPANCY OR EGRESS
M01455383-S2
10/02/2026
Objection resolved — Resolved
09/24/2026
Permit issued — Construction Fence
M01457686-I1-FN
09/22/2026
Filed — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01457686-I1
09/14/2026
Permit issued — Suspended Scaffold
M01120817-I1-SC
09/14/2026
Objection resolved — Resolved
09/11/2026
Objection raised — Scope
09/11/2026
Objection raised — Scope
09/09/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING RESIDENTIAL DWELLING UNIT INCLUDING NEW FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREIN. NO CHANGE IN USE, OCCUPANCY OR EGRESS
M01455383-I1
09/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/03/2026
Special inspection requirement — Energy Code Compliance Inspections
09/03/2026
Special inspection requirement — Final
09/03/2026
Special inspection requirement — Mechanical Systems
09/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/03/2026
Special inspection requirement — Lighting in dwelling units
09/03/2026
Special inspection requirement — Energy Code Compliance Inspections
09/03/2026
Special inspection requirement — Final
04/28/2026
Signed off — Alteration
M01277331-I1
04/06/2026
Permit issued — General Construction
M00992420-I1-GC
09/30/2025
Permit issued — Suspended Scaffold
M01120817-I1-SC
09/29/2025
Permit issued — General Construction
M01277331-I1-GC
09/18/2025
Filed — Alteration
M01277331-I1
08/25/2025
Special inspection requirement — Lighting in dwelling units
Sarah Drake
08/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sarah Drake
08/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Sarah Drake
08/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
Sarah Drake
08/25/2025
Special inspection requirement — Final
Sarah Drake
05/06/2025
Permit issued — General Construction
M00992420-I1-GC
10/03/2024
Permit issued — Suspended Scaffold
M01120817-I1-SC
10/02/2024
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD FOR FACADE INSPECTION / REPAIR.
M01120817-I1
06/05/2024
Permit issued — General Construction
M00992420-I1-GC
04/10/2024
Filed — Alteration
M00992420-I1
08/24/2023
Signed off — Alteration
INSTALL SIDEWALK SHED, AS SHOWN ON DRAWINGS. NO CHANGE IS USE, EGRESS OR OCCUPANCY.
M00418985-I1
06/09/2023
Cycle 9 facade report signed — SAFE
06/04/2023
Signed off — Alteration
INSTALL SUPPORTED SCAFFOLD, AS SHOWN ON DRAWINGS. NO CHANGE IN USE, EGRES OR OCCUPANCY.
M00424195-I1
02/17/2023
Cycle 9 facade report submitted
01/17/2023
Cycle 9 facade inspection completed
12/28/2022
Filed — Alteration
HVAC-related work for Apartment 11D renovation. No change to use, egress or occupancy.
M00451937-S1
11/23/2022
Permit issued — Sidewalk Shed
M00418985-I1-SH
11/30/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/30/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/22/2021
Permit issued — Sidewalk Shed
M00418985-I1-SH
11/19/2021
Permit issued — Supported Scaffold
M00424195-I1-SF
10/25/2021
Filed — Alteration
INSTALL SIDEWALK SHED, AS SHOWN ON DRAWINGS. NO CHANGE IS USE, EGRESS OR OCCUPANCY.
M00418985-P1
10/01/2021
Violation issued (HPD, open)
A
10/01/2021
Violation issued (HPD, open)
B
07/22/2021
Filed — Alteration
INSTALL SUPPORTED SCAFFOLD, AS SHOWN ON DRAWINGS. NO CHANGE IN USE, EGRES OR OCCUPANCY.
M00424195-P2
06/04/2021
Objection resolved — Addressed
04/14/2021
Objection raised — Other
04/06/2021
Filed — Alteration
INSTALL SUPPORTED SCAFFOLD, AS SHOWN ON DRAWINGS. NO CHANGE IN USE, EGRES OR OCCUPANCY.
M00424195-P1
04/01/2021
Filed — Alteration
HVAC-related work for Apartment 11D renovation. No change to use, egress or occupancy.
M00451937-I1
04/01/2021
Objection raised — Fire_Protection
04/01/2021
Objection resolved — Addressed
04/01/2021
Objection raised — Mechanical
04/01/2021
Objection resolved — Addressed
04/01/2021
Objection raised — Scope
04/01/2021
Objection resolved — Addressed
04/01/2021
Objection raised — Other
Latest 60 of 146 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedConstructors Trades & Ski09/24/2026
DOB NOWSuspended ScaffoldPermit IssuedConstructors Trades & Ski09/14/2026
DOB NOWGeneral ConstructionPermit IssuedConstructors Trades & Ski04/06/2026
DOB NOWSuspended ScaffoldPermit IssuedNew Force Construction09/30/2025
DOB NOWGeneral ConstructionSigned-offMonaco Group USA09/29/2025
DOB NOWGeneral ConstructionPermit IssuedConstructors Trades & Ski05/06/2025
DOB NOWSuspended ScaffoldPermit IssuedNew Force Construction10/03/2024
DOB NOWGeneral ConstructionPermit IssuedConstructors Trades & Ski06/05/2024
DOB NOWSidewalk ShedSigned-offNew Force Construction Co11/23/2022
DOB NOWSidewalk ShedSigned-offNew Force Construction Co11/22/2021
DOB NOWSupported ScaffoldSigned-offNew Force Construction Co11/19/2021
DOB NOWSidewalk ShedSigned-offNew Force Construction Co12/02/2020
DOB NOWSupported ScaffoldSigned-offNew Force Construction Co12/02/2020
DOB NOWSupported ScaffoldSigned-offNew Force Construction Co11/25/2020
DOB NOWSidewalk ShedSigned-offNew Force Construction Co11/02/2020
BISOTISSUEDNew Force Construction11/17/2021
BISOTISSUEDNew Force Construction01/26/2021
BISPLISSUEDMCM Plumbing & Heating05/07/2019
BISOTISSUEDJupiter Interiors05/03/2019
BISOTISSUEDGaradice Builders05/01/2019
BISPLISSUEDAqua Blue Plumbing Svces09/11/2018
BISPLISSUEDAqua Blue Plumbing Svces03/30/2017
BISPLISSUEDOrbit Plumbing & Heating01/11/2017
BISOTISSUEDLMC Construction12/14/2016
BISOTISSUEDLMC Construction12/09/2016
BISPLISSUEDCatman Plumbing09/03/2016
BISOTISSUEDJD Arch08/23/2016
BISEQISSUEDPowers Bridging & Scaffolding03/23/2016
BISOTISSUEDAccura Rest. & Waterproof02/04/2016
BISPLISSUEDP.S.I. Mechanical09/21/2015
BISOTISSUEDAccura Rest. & Waterproof07/28/2015
BISOTISSUEDEast Side Interiors07/07/2015
BISEQISSUEDPowers Bridging & Scaffolding03/30/2015
BISPLISSUEDTop Plumbing Group03/17/2015
BISOTISSUEDValmato Construction03/03/2015
BISPLISSUEDWynne Plumbing & Heating11/12/2014
BISPLISSUEDCC Controlled Plumbing Co10/10/2014
BISFBISSUEDC C Controlled Combustion10/10/2014
BISPLISSUEDAqua Blue Plumbing Svces07/18/2014
BISOTISSUEDEast River Contracting05/27/2014
+ 25 more permits on file
2 projects · most recent 12/28/2022
Heating and Air Conditioning Systems Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
12/28/2022——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PKFY-P12NLMU-E.TH 12,000 BTU · Vrf Indoor ×16
PKFY-P12NLMU-E.TH (INDOOR UNIT) 12,000 BTU · Vrf Indoor ×4
PUMY-P48NKMU3 48,000 BTU · Vrf Outdoor ×4
03/31/2021——Air Conditioning Systems, Heating Systems
Cooling
Daikin FXTQ12PAVJU 12,000 BTU · Vrf Indoor ×2
FXTQ18PAVJU 18,000 BTU · Vrf Indoor ×2
FAQ24PVJU 24,000 BTU · Fan Coil Indoor ×1
FXNQO7MVJU9 7,500 BTU · Vrf Indoor ×1
RXTQ60TAVJU 57,000 BTU · Vrf Outdoor ×1
RZR24PVJU 24,000 BTU · Condensing Unit ×1
Heating
Daikin FXAQ12PVJU 13,500 BTU · Vrf Indoor ×2
FXNQ07MVJU9 8,500 BTU · Vrf Indoor ×1
FXTQ18PAVJU 20,000 BTU · Vrf Indoor ×1
FZAQ18PVJU 20,000 BTU · Vrf Indoor ×1
RXTQ60TAVJU 57,000 BTU · Vrf Outdoor ×1
1 project · most recent 03/31/2021
Water/Sanitary
FiledStatusContractorScope
03/31/2021——Water/Sanitary
7 projects · most recent 05/22/2025
General Wiring
FiledStatusContractorScope
05/22/2025CompleteShuir Electrical ContractorsGeneral Wiring
02/02/2021Permit IssuedAccurate Electrical—
03/04/2020Permit IssuedA.C. Morgan ElectricGeneral Wiring
05/07/2019CompleteT. McCaffrey-T. McGovern—
05/05/2019CompleteHigh-Light ElectricalGeneral Wiring
12/17/2018CompleteJam Electrical—
09/04/2018CompleteArree Electric—
1 project · most recent 09/22/2026
Fence
FiledStatusContractorScope
09/22/2026Permit IssuedConstructors Trades & SkiFence
1 project · most recent 10/02/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
10/02/2024Permit IssuedConstructors Trades & SkiSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
09/04/2026Tenant Protection Plan Compliance—special
09/03/2026Fire-Resistant Penetrations and Joints—special
09/03/2026Energy Code Compliance Inspections—progress
09/03/2026Final—progress
09/03/2026Mechanical Systems—special
09/03/2026Fire-Resistant Penetrations and Joints—special
09/03/2026Lighting in dwelling units—energy_progress
09/03/2026Energy Code Compliance Inspections—progress
09/03/2026Final—progress
08/25/2025Lighting in dwelling unitsSarah Drakeenergy_progress
08/25/2025Fire-Resistant Penetrations and JointsSarah Drakespecial
08/25/2025Energy Code Compliance InspectionsSarah Drakeprogress
08/25/2025Fire-Resistance Rated ConstructionSarah Drakeprogress
08/25/2025FinalSarah Drakeprogress
03/29/2021HVAC-R and service water heating equipment—energy_progress
03/29/2021HVAC-R and service water heating system controls—energy_progress
03/29/2021HVAC-R and service water piping design and insulation—energy_progress
03/29/2021Duct leakage testing, insulation and design—energy_progress
03/29/2021Fire-Resistant Penetrations and Joints—special
03/29/2021Maintenance information—energy_progress
03/11/2021Final—progress
03/11/2021Mechanical Systems—special
01/27/2021Fire-Resistance Rated ConstructionSteven Zirinskyprogress
01/27/2021Fire-Resistant Penetrations and JointsSteven Zirinskyspecial
01/26/2021FinalSteven Zirinskyprogress
▾Documents — 590 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch8
10/04/2026M01455383-I1Request digital key ↗
10/04/2026M01457686-I1Request digital key ↗
09/04/2026M00461064-S2Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/04/2026M00424195-P2Request digital key ↗
09/04/2026M00424195-P1Request digital key ↗
09/04/2026M00424195-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00461064-I1Request digital key ↗
08/14/2026M00451937-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/04/2026M00418985-P1Request digital key ↗
09/04/2026M00418985-I1Request digital key ↗
▸Applications & Permits134
▸BISPLAN / WORK APPROVAL APPLICATION71
01/31/2023140966747Open ↗
01/24/2023140966747Open ↗
01/24/2023140966747Open ↗
Showing 3 of 71 on file for this type
▸BISWORK PERMIT APPLICATION54
01/26/2021140966747Open ↗
08/21/2019123805953Open ↗
05/03/2019123757684Open ↗
Showing 3 of 54 on file for this type
▸DOB NOWLPC Approval/Permit8
10/04/2026M01455383-I1Open ↗
09/04/2026M00461064-S2Open ↗
09/04/2026M00461064-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications104
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION59
02/26/2020123757684Open ↗
02/26/2020123757684Open ↗
12/17/2019122224501Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
10/04/2026M01455383-I1Open ↗
09/27/2026M01457686-I1Open ↗
09/04/2026M00418985-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
10/29/2020140969708Open ↗
10/16/2020140966747Open ↗
04/29/2019123805953Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
04/29/2019123805953Open ↗
04/10/2017123048852Open ↗
Showing 2 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/30/2026M01277331-I1Open ↗
09/30/2026M01277331-I1Open ↗
09/30/2026M01277331-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/29/2020140969708Open ↗
10/16/2020140966747Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/29/2020140969708Open ↗
10/16/2020140966747Open ↗
Showing 2 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/30/2026M01277331-I1Open ↗
08/22/2026M00461064-I1Open ↗
▸Trade Schedules & Equipment56
▸BISSELF-CERT PLUMBING NOTICE19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE16
01/21/2020123757684Open ↗
11/12/2019122224501Open ↗
06/03/2019123757684Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBOILER APPROVAL : 900A1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection11
▸BISTENANT PROTECTION PLAN AND NOTES5
10/29/2020140969708Open ↗
10/16/2020140966747Open ↗
11/04/2016140566787Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan5
09/04/2026M00418985-I1Open ↗
09/04/2026M00418985-P1Open ↗
09/04/2026M00424195-I1Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/23/2017120442075Open ↗
▸Environmental & Asbestos31
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
10/16/2020140966747Open ↗
05/06/2019123757684Open ↗
04/29/2019123805953Open ↗
Showing 3 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
10/04/2026M01455383-I1Open ↗
09/04/2026M00461064-S2Open ↗
09/04/2026M00461064-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/21/2026M01277331-I1Open ↗
▸Energy Compliance55
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS26
02/26/2020123757684Open ↗
02/26/2020123757684Open ↗
11/06/2019123805953Open ↗
Showing 3 of 26 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS13
09/21/2020122224501Open ↗
02/26/2020123757684Open ↗
12/17/2019122224501Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
01/31/2023140966747Open ↗
10/29/2020140969708Open ↗
10/22/2020122361194Open ↗
Showing 3 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
10/29/2020140969708Open ↗
10/16/2020140966747Open ↗
Showing 2 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
01/31/2023140966747Open ↗
10/01/2020122361194Open ↗
▸BISTR8 INSPECTOR TO CONFIRM AS-BUILT VALUES1
09/21/2020122224501Open ↗
▸BISNYCECC ANALYSIS1
10/16/2020140966747Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY8
01/31/2023140966747Open ↗
10/29/2020140969708Open ↗
10/22/2020122361194Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs59
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST23
02/01/2023140966747Open ↗
10/22/2020122361194Open ↗
09/21/2020122224501Open ↗
Showing 3 of 23 on file for this type
▸BISLANDMARKS APPROVAL12
10/29/2020140969708Open ↗
10/16/2020140966747Open ↗
11/06/2019123805953Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
12/17/2019122224501Open ↗
04/29/2019123805953Open ↗
04/29/2019123805953Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISLANDMARKS SIGNOFF2
02/01/2023140966747Open ↗
10/01/2020122361194Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership48
▸BISCOST AFFIDAVIT45
01/31/2023140966747Open ↗
01/30/2023140966747Open ↗
10/29/2020140969708Open ↗
Showing 3 of 45 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
01/31/2023140966747Open ↗
10/01/2020122361194Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms59
▸BISADDITIONAL INFORMATION19
01/31/2023140966747Open ↗
11/14/2021140969708Open ↗
09/01/2021140969708Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET18
04/29/2019123805953Open ↗
04/10/2017123048852Open ↗
Showing 2 of 18 on file for this type
▸BISBOROUGH INTAKE FORM17
03/24/2020122224501Open ↗
03/24/2020122224501Open ↗
02/26/2020123757684Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
10/29/2020140969708Open ↗
10/16/2020140966747Open ↗
Showing 2 of 5 on file for this type
▸Other Documents10
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
04/29/2019123805953Open ↗
Showing 1 of 5 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M01120817-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01120817-I1Open ↗
▸DOB NOWDHCR Document1
09/04/2026M00424195-I1Open ↗