← Back
Public elementary, junior or senior high
P.S. 11: the Sarah J. Garnet Elementary School
315 WEST 20 STREET · BIN 1013260
💬 Discuss this project
1925Year Built
5Stories
W1Building Class
R7BZoning
89,802 sfGross Floor Area
3Units
LL97 Covered10 Open Violations 1 unresolved · 9 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 27,600 sf lot · 3.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Floor 21p · 1 filing · 5 docs
Floor 1
Basement3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC DEPARTMENT OF EDUCATION103/22/2026
ANVA103/22/2026
ADAM'S EUROPEAN CONTRACTI203/22/2026
DOE 040503/22/2026
D.O.E. 0103/22/2026
DOE PS 11 040303/22/2026
DEPARTMENT OF EDUCATION603/22/2026
DOE PS 011 040303/22/2026
DEPT.OF EDUCATION PS 11303/22/2026
DOE/P.S. 111103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EME GROUP/SALAS O'BRIEN207/14/2025
NELLIGAN WHITE ARCHITECTS, PLLC411/01/2024
SHENOY ENGINEERING, P.C.208/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NELLIGAN WHITE ARCHITECTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DRL SERVICES LLCGeneral Contractor607/08/2026
VARSITY PLBG AND HTG INCPlumbing307/08/2026
RISHI BUNSEEElectrical203/21/2026
CHAYUT, ALLENElectrical203/21/2026
FLORENTINE ARTISTIC IRONElectrical203/21/2026
SCHWERDTFEGER, MARCUSElectrical203/21/2026
LUPINSKI, MAREKElectrical203/21/2026
GATZONIS, CElectrical103/21/2026
ANTHONY COMOElectrical103/21/2026
DIMARCO, JOSEPHElectrical103/21/2026
FRANK DISTEFANOElectrical103/21/2026
ANTHONY CAULOElectrical103/21/2026
LEVIS ELECTR'L CONTR. CORElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC LOGISTICS DBA JPCL EN351107/14/2025
20/20 INSPECTIONS INC1471411/01/2024
Building Lifecycle
All (99)Filed (8)Permit Issued (7)Signed Off (2)Violation (60)Inspection (2)Objection (6)Special Inspection (14)
04/22/2026
Violation issued (ECB, open)
Construction
04/22/2026
Violation issued (ECB, open)
Construction
01/12/2026
Violation issued (ECB, closed)
Construction
07/14/2025
Filed — Alteration
INSTALLATION OF SUPPLEMENTAL COOLING SYSTEM IN THE CAFETERIA.
M01251835-I1
07/11/2025
Violation issued (ECB, open)
Construction
07/11/2025
Violation issued (ECB, open)
Construction
07/11/2025
Violation issued (ECB, open)
Construction
07/10/2025
Filed — Alteration
Installation of Supplemental Cooling System in Auditorium indoor evaporator and Outdoor Condenser Units.
M01250747-I1
07/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
07/07/2025
Special inspection requirement — Post-installed Anchors
Asma Hashmi
07/07/2025
Special inspection requirement — Mechanical Systems
Asma Hashmi
07/07/2025
Special inspection requirement — Final
Asma Hashmi
07/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/02/2025
Special inspection requirement — Mechanical Systems
07/02/2025
Special inspection requirement — Post-installed Anchors
07/02/2025
Special inspection requirement — Final
03/10/2025
Signed off — Alteration
Upgrades to the furniture and finishes in the boys and girls changing rooms at the cellar.
M00671745-S1
03/07/2025
Signed off — Alteration
Upgrades to the furniture and finishes in the boys and girls changing rooms at the cellar.
M00671745-I1
02/27/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/12/2024
Permit issued — Plumbing
M00671745-S1-PL
11/26/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
11/05/2024
Special inspection requirement — Post-installed Anchors
JACOB HAAS
11/01/2024
Filed — Alteration
Upgrades to the furniture and finishes in the boys and girls changing rooms at the cellar.
M00671745-P4
10/31/2024
Special inspection requirement — Post-installed Anchors
JACOB HAAS
10/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
09/10/2024
Violation issued (ECB, closed)
Construction
09/10/2024
Violation issued (ECB, open)
Construction
09/10/2024
Violation issued (ECB, open)
Construction
08/20/2024
Permit issued — General Construction
M00671745-I1-GC
08/08/2024
Filed — Alteration
Upgrades to the furniture and finishes in the boys and girls changing rooms at the cellar.
M00671745-P3
08/08/2024
Filed — Alteration
Upgrades to the furniture and finishes in the boys and girls changing rooms at the cellar.
M00671745-P2
12/13/2023
Permit issued — Plumbing
M00671745-S1-PL
06/15/2023
Violation issued (ECB, closed)
Construction
06/15/2023
Violation issued (ECB, closed)
Construction
06/15/2023
Violation issued (ECB, open)
Construction
06/15/2023
Violation issued (ECB, open)
Construction
03/28/2023
Permit issued — General Construction
M00671745-I1-GC
03/27/2023
Permit issued — General Construction
M00671745-I1-GC
12/15/2022
Permit issued — Plumbing
M00671745-S1-PL
12/14/2022
Permit issued — General Construction
M00671745-I1-GC
10/26/2022
Objection resolved — Addressed
08/26/2022
Objection raised — Other
08/25/2022
Filed — Alteration
Upgrades to the furniture and finishes in the boys and girls changing rooms at the cellar.
M00671745-P1
08/22/2022
Special inspection requirement — Post-installed Anchors
JACOB HAAS
08/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
02/17/2022
Objection raised — Other
02/17/2022
Objection resolved — Addressed
02/17/2022
Objection raised — Other
02/17/2022
Objection resolved — Addressed
02/09/2022
Filed — Alteration
Upgrades to the furniture and finishes in the boys and girls changing rooms at the cellar.
M00671745-S1
02/03/2022
Filed — Alteration
Upgrades to the furniture and finishes in the boys and girls changing rooms at the cellar.
M00671745-I1
05/07/2021
Violation issued (ECB, closed)
Construction
05/07/2021
Violation issued (ECB, closed)
Construction
05/07/2021
Violation issued (ECB, closed)
Construction
05/07/2021
Violation issued (ECB, closed)
Construction
12/08/2020
Violation issued (ECB, closed)
Construction
06/10/2019
Violation issued (ECB, closed)
Construction
04/19/2019
Violation issued (ECB, closed)
Construction
04/19/2019
Violation issued (ECB, closed)
Construction
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC12/12/2024
DOB NOWGeneral ConstructionSigned-offDRL SERVICES LLC08/20/2024
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC12/13/2023
DOB NOWGeneral ConstructionSigned-offDRL SERVICES LLC03/28/2023
DOB NOWGeneral ConstructionSigned-offDRL SERVICES LLC03/27/2023
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC12/15/2022
DOB NOWGeneral ConstructionSigned-offDRL SERVICES LLC12/14/2022
BISOTISSUEDADAM'S EUROPEAN CONTRACTING03/06/2026
BISOTISSUEDADAM'S EUROPEAN CONTRACTING03/06/2026
BISPLISSUEDVARSITY PLBG AND HTG INC06/13/2025
BISMHISSUEDTAMEER INC06/05/2025
BISOTISSUEDADAM'S EUROPEAN CONTRACTING03/13/2025
BISOTISSUEDADAM'S EUROPEAN CONTRACTING03/13/2025
BISPLISSUEDVARSITY PLBG AND HTG INC06/18/2024
BISMHISSUEDTAMEER INC06/13/2024
BISEQISSUEDADAM'S EUROPEAN CONTRACTING06/06/2024
BISEQISSUEDADAM'S EUROPEAN CONTRACTING06/06/2024
BISEQISSUEDADAM'S EUROPEAN CONTRACTING06/06/2024
BISEQISSUEDADAM'S EUROPEAN CONTRACTING06/06/2024
BISOTISSUEDADAM'S EUROPEAN CONTRACTING03/12/2024
BISOTISSUEDADAM'S EUROPEAN CONTRACTING03/12/2024
BISOTISSUEDADAM'S EUROPEAN CONTRACTING03/12/2024
BISPLISSUEDVARSITY PLBG AND HTG INC06/23/2023
BISEQISSUEDADAM'S EUROPEAN CONTRACTING06/08/2023
BISEQISSUEDADAM'S EUROPEAN CONTRACTING06/08/2023
BISEQISSUEDADAM'S EUROPEAN CONTRACTING06/08/2023
BISEQISSUEDADAM'S EUROPEAN CONTRACTING06/08/2023
BISMHISSUEDTAMEER INC06/08/2023
BISOTISSUEDADAM'S EUROPEAN CONTRACTING03/14/2023
BISOTISSUEDADAM'S EUROPEAN CONTRACTING03/14/2023
BISPLISSUEDVARSITY PLBG AND HTG INC06/28/2022
BISMHISSUEDTAMEER INC06/10/2022
BISEQISSUEDADAM'S EUROPEAN CONTRACTING06/06/2022
BISEQISSUEDADAM'S EUROPEAN CONTRACTING06/06/2022
BISEQISSUEDADAM'S EUROPEAN CONTRACTING06/06/2022
BISEQISSUEDADAM'S EUROPEAN CONTRACTING06/06/2022
BISOTISSUEDADAM'S EUROPEAN CONTRACTING03/21/2022
BISOTISSUEDADAM'S EUROPEAN CONTRACTING03/21/2022
BISMHISSUEDTAMEER INC01/28/2022
BISPLISSUEDVARSITY PLBG AND HTG INC06/30/2021
+ 17 more permits on file
2 projects · most recent 07/14/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/14/2025——Air Conditioning Systems
Cooling
Fujitsu FUJITSU - ASUA36TLAV2 34,000 BTU · Fan Coil Indoor ×13
FUJITSU - AOU120RLAVL 360,000 BTU · Vrf Outdoor ×4
07/10/2025——Air Conditioning Systems
Cooling
Fujitsu FUJITSU - ASUA36TLAV2 34,000 BTU · Fan Coil Indoor ×11
FUJITSU - AOU120RLAVL 360,000 BTU · Vrf Outdoor ×1
18 projects · most recent 02/04/2026
General Wiring
FiledStatusContractorScope
02/04/2026CompleteGEMINI ELECTRIC CO., INC.—
12/16/2025CompleteGEMINI ELECTRIC CO., INC.—
09/10/2025CompleteDVM ELECTRICAL SERVICES LGeneral Wiring
08/07/2025CompleteKLK ELECTRIC, INC—
07/15/2025CompleteKLK ELECTRIC, INCGeneral Wiring
06/25/2024CompleteANCO ELECTL CONTCTNG INC—
10/16/2023CompleteGEMINI ELECTRIC CO., INC.—
05/23/2023CompleteANCO ELECTL CONTCTNG INC—
09/26/2022CompleteENERGIZE ELC'L CNTRG CORPGeneral Wiring
06/07/2022CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
10/20/2021CompleteZIGGY'S ELECL CONTNG CORP—
10/20/2021CompleteZIGGY'S ELECL CONTNG CORP—
02/10/2021CompleteLEVIS ELECTR'L CONTR. CORGeneral Wiring
06/12/2019CompleteSAMCO ELECTRIC CORP.—
05/16/2019Permit IssuedSAMCO ELECTRIC CORP.—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/27/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/26/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
07/07/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
07/07/2025Post-installed AnchorsAsma Hashmispecial
07/07/2025Mechanical SystemsAsma Hashmispecial
07/07/2025FinalAsma Hashmiprogress
07/02/2025Fire-Resistant Penetrations and Joints—special
07/02/2025Mechanical Systems—special
07/02/2025Post-installed Anchors—special
07/02/2025Final—progress
11/05/2024Fire-Resistant Penetrations and JointsJACOB HAASspecial
11/05/2024Post-installed AnchorsJACOB HAASspecial
10/31/2024Post-installed AnchorsJACOB HAASspecial
10/31/2024Fire-Resistant Penetrations and JointsJACOB HAASspecial
08/22/2022Post-installed AnchorsJACOB HAASspecial
08/22/2022Fire-Resistant Penetrations and JointsJACOB HAASspecial
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/02/2026M00671745-P4Request digital key ↗
09/02/2026M00671745-P3Request digital key ↗
09/02/2026M00671745-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/22/2026M01251835-I1Open ↗
08/13/2026M00671745-S1Open ↗
08/13/2026M00671745-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026M00671745-P4Open ↗
08/28/2026M00671745-P4Open ↗
08/27/2026M00671745-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026M00671745-S1Open ↗
08/13/2026M00671745-I1Open ↗
▸Approvals, Objections & Sign-offs20
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/13/2026M01251835-I1Open ↗
08/13/2026M00671745-P1Open ↗
08/13/2026M00671745-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)8
08/13/2026M01251835-I1Open ↗
08/13/2026M01250747-I1Open ↗
08/13/2026M00671745-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026M00671745-I1Open ↗
08/13/2026M00671745-S1Open ↗
▸DOB NOWDEP Variance (V5) letter2
08/13/2026M00671745-I1Open ↗
08/13/2026M00671745-S1Open ↗
▸Other Documents10
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal6
08/13/2026M00671745-P1Open ↗
08/13/2026M00671745-S1Open ↗
08/13/2026M00671745-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProof of Historic Building2
08/13/2026M01250747-I1Open ↗
08/13/2026M01251835-I1Open ↗
▸DOB NOWNYCSCA Exhibit 22
08/13/2026M00671745-I1Open ↗
08/13/2026M00671745-S1Open ↗