← Back
BuildNYC
Elevator cooperative
315 WEST 25TH STREET
MANHATTAN · BIN 1083600
💬 Discuss this project
1963Year Built
22Stories
D4Building Class
R8Zoning
232,793 sfGross Floor Area
189Units
LL97 CoveredRent Stabilized0 Active ViolationsFDNY Report ↗
Elevator cooperative · 59,250 sf lot · 3.93 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMutual Redevelopment House INC14p · 2 filings · 20 docs
Floor 1Mutual Redevelopment House INC14p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Mutual Redevelopment Housing4409/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Howard L Zimmerman Arch & Engineering806/05/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Howard L Zimmerman Architects1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
The Metro GroupGeneral Contractor207/08/2026
Village ElectricElectrical103/21/2026
Fresh Meadow Mechanical PlumbingPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Howard L Zimmerman Architects1712506/05/2026
Building Lifecycle
All (25)Filed (8)Permit Issued (3)Signed Off (1)Violation (2)Inspection (1)Special Inspection (10)
06/15/2026
Signed off — Alteration
Mechanical work to accommodate replacement of Diesel generator #1 with a new natural gas generator. MH work consists of the installation of new fresh air intake fan and connection of new exhaust breaching to existing Diesel exhaust header per plans.
M00979619-I1
06/11/2026
Special inspection requirement — Post-installed Anchors
Jon Colatrella
06/05/2026
Filed — Alteration
Replacement of Diesel generator with a new natural gas generator per plans submitted herewith. No change in use, egress or occupancy.
M00979411-P4
06/01/2026
Special inspection requirement — Post-installed Anchors
Jon Colatrella
12/29/2025
Inspection — Pass-Final PL - Co-Generator
Pass
View inspection ↗
12/04/2025
Filed — Alteration
Replacement of Diesel generator with a new natural gas generator per plans submitted herewith. No change in use, egress or occupancy.
M00979411-P3
12/03/2025
Special inspection requirement — Post-installed Anchors
Jon Colatrella
08/20/2025
Permit issued — Plumbing
M00979411-I1-PL
07/11/2025
Permit issued — Mechanical Systems
M00979619-I1-MS
05/09/2025
Special inspection requirement — Mechanical Systems
Jon Colatrella
05/09/2025
Special inspection requirement — Final
Jon Colatrella
04/30/2025
Filed — Alteration
Mechanical work to accommodate replacement of Diesel generator #1 with a new natural gas generator. MH work consists of the installation of new fresh air intake fan and connection of new exhaust breaching to existing Diesel exhaust header per plans.
M00979619-P2
04/30/2025
Filed — Alteration
Replacement of Diesel generator with a new natural gas generator per plans submitted herewith. No change in use, egress or occupancy.
M00979411-P2
04/14/2025
Special inspection requirement — Mechanical Systems
Jon Colatrella
04/14/2025
Special inspection requirement — Final
Jon Colatrella
08/13/2024
Permit issued — Mechanical Systems
M00979619-I1-MS
02/07/2024
Filed — Alteration
Mechanical work to accommodate replacement of Diesel generator #1 with a new natural gas generator. MH work consists of the installation of new fresh air intake fan and connection of new exhaust breaching to existing Diesel exhaust header per plans.
M00979619-P1
02/07/2024
Filed — Alteration
Replacement of Diesel generator with a new natural gas generator per plans submitted herewith. No change in use, egress or occupancy.
M00979411-P1
02/07/2024
Special inspection requirement — Post-installed Anchors
02/07/2024
Special inspection requirement — Mechanical Systems
02/07/2024
Special inspection requirement — Final
02/05/2024
Filed — Alteration
Mechanical work to accommodate replacement of Diesel generator #1 with a new natural gas generator. MH work consists of the installation of new fresh air intake fan and connection of new exhaust breaching to existing Diesel exhaust header per plans.
M00979619-I1
02/05/2024
Filed — Alteration
Replacement of Diesel generator with a new natural gas generator per plans submitted herewith. No change in use, egress or occupancy.
M00979411-I1
01/13/2004
Violation issued (ECB, closed)
Boilers
01/13/2004
Violation issued (ECB, closed)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMichael Burns P&H08/20/2025
DOB NOWMechanical SystemsSigned-offThe Metro Group07/11/2025
DOB NOWMechanical SystemsSigned-offThe Metro Group08/13/2024
BISOTISSUEDFresh Meadow Mechanical07/07/2016
BISOTISSUEDFresh Meadow Mechanical07/07/2016
BISMHISSUEDFresh Meadow Mechanical12/11/2015
BISOTISSUEDFresh Meadow Mechanical12/11/2015
BISPLISSUEDFresh Meadow Mechanical Plumbing12/11/2015
BISFSISSUEDPeter Agliardo Contractor09/09/2015
BISOTISSUEDFresh Meadow Mechanical07/14/2015
BISMHISSUEDFresh Meadow Mechanical06/16/2015
BISBLISSUEDPeter Agliardo Contractor04/29/2015
BISPLISSUEDFresh Meadow Mechanical Plumbing04/28/2015
BISMHISSUEDFresh Meadow Mechanical04/28/2015
BISFSISSUEDPeter Agliardo Contractor12/30/2014
BISOTISSUEDFresh Meadow Mechanical10/31/2014
BISPLISSUEDMagic Mechanical05/27/2011
BISMHISSUEDEast End Builders and As02/14/2011
BISMHISSUEDJersey Boilder05/11/2005
BISEQISSUEDTwin and Swing Scaffolding12/22/2003
BISEQISSUEDTwin and Swing Scaffolding11/14/2003
BISFBISSUEDMmi Mechanical05/01/2003
BISPLRE-ISSUEDUnflat Associates05/01/2003
1 project · most recent 04/30/2025
Generators
FiledStatusContractorScopeMake / Model / Capacity
04/30/2025Signed-offThe Metro GroupGenerators
Generators
Caterpillar CATERPILLAR G3512 750 kW · Generator ×3
1 project · most recent 06/05/2026
Gas
FiledStatusContractorScope
06/05/2026Signed-offFresh Meadow Mechanical PlumbingGas
2 projects · most recent 06/18/2026
General Wiring
FiledStatusContractorScope
06/18/2026CompleteSafetech Electrical ContngGeneral Wiring
04/23/2019Permit IssuedSafetech Electrical ContngGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
12/29/2025Pass-Final PL - Co-GeneratorPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/11/2026Post-installed AnchorsJon Colatrellaspecial
06/01/2026Post-installed AnchorsJon Colatrellaspecial
12/03/2025Post-installed AnchorsJon Colatrellaspecial
05/09/2025Mechanical SystemsJon Colatrellaspecial
05/09/2025FinalJon Colatrellaprogress
04/14/2025Mechanical SystemsJon Colatrellaspecial
04/14/2025FinalJon Colatrellaprogress
02/07/2024Post-installed Anchors—special
02/07/2024Mechanical Systems—special
02/07/2024Final—progress
▾Documents — 204 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/28/2026M00979411-P4Request digital key ↗
08/28/2026M00979411-P3Request digital key ↗
08/28/2026M00979411-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits42
▸BISWORK PERMIT APPLICATION23
07/22/2019140855590Open ↗
07/10/2019140855590Open ↗
07/19/2016122465625Open ↗
Showing 3 of 23 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION19
08/27/2021122237230Open ↗
08/13/2021122248479Open ↗
07/10/2019140855590Open ↗
Showing 3 of 19 on file for this type
▸Seals & Professional Certifications56
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION24
09/30/2019140855590Open ↗
09/28/2016122465625Open ↗
01/11/2016122465625Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
09/16/2016122465625Open ↗
05/25/2016122465625Open ↗
05/04/2016122465625Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/28/2026M00979411-P4Open ↗
08/28/2026M00979411-P2Open ↗
08/28/2026M00979411-P1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
07/10/2019140855590Open ↗
01/11/2016122465625Open ↗
05/05/2015122235955Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
10/12/2026M00979619-I1Open ↗
08/24/2026M00979411-I1Open ↗
08/23/2026M00979411-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
10/12/2026M00979619-I1Open ↗
08/22/2026M00979619-P2Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/10/2019140855590Open ↗
▸BISProfessional and Owner Certification (POC3)1
06/29/2015122237230Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/10/2019140855590Open ↗
▸Trade Schedules & Equipment19
▸BISEQUIPMENT USE PERMITS4
09/30/2019140855590Open ↗
09/30/2019140855590Open ↗
09/30/2019140855590Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
06/29/2015122237230Open ↗
06/26/2015122237230Open ↗
05/05/2015122235955Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
06/13/2016122235955Open ↗
01/11/2016122465625Open ↗
05/05/2015122235955Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
09/30/2019140855590Open ↗
09/16/2016122465625Open ↗
09/16/2016122465625Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING1
03/25/2010120297231Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
06/30/2015122235955Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
08/25/2010120297231Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/28/2026M00979411-P4Open ↗
08/28/2026M00979411-P2Open ↗
08/28/2026M00979411-P1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
07/10/2019140855590Open ↗
01/11/2016122465625Open ↗
03/20/2015122235946Open ↗
Showing 3 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
05/05/2015122235955Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/25/2010120297231Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
09/30/2019140855590Open ↗
01/06/2017122465625Open ↗
05/25/2016122465625Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
09/30/2019140855590Open ↗
01/06/2017122465625Open ↗
07/07/2015122235955Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/10/2019140855590Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/10/2019140855590Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/19/2021122248479Open ↗
07/10/2019140855590Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
01/06/2017122465625Open ↗
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
08/19/2021122248479Open ↗
09/30/2019140855590Open ↗
01/06/2017122465625Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/30/2019140855590Open ↗
▸BISFINAL1
08/19/2021122248479Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/25/2010120297231Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT15
09/30/2019140855590Open ↗
07/10/2019140855590Open ↗
01/06/2017122465625Open ↗
Showing 3 of 15 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
08/02/2021122248479Open ↗
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET8
01/11/2016122465625Open ↗
01/11/2016122465625Open ↗
06/29/2015122237230Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION6
01/06/2017122465625Open ↗
09/16/2016122465625Open ↗
05/25/2016122465625Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM1
09/30/2019140855590Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/10/2019140855590Open ↗
▸Other Documents2
▸BISFUEL-OIL STORAGE AND FUEL-OIL PIPING SYSTEMS1
08/19/2021122248479Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/04/2016122465625Open ↗