← Back
Office with commercial, 1-6 stories
Coalition for Hispanic Family Services
315 WYCKOFF AVENUE · Bushwick (East) · BIN 3076376
💬 Discuss this project
1929Year Built
6Stories
O5Building Class
R6Zoning
25,800 sfGross Floor Area
1Units
LL97 Covered6 Open Violations 3 unresolved · 3 paperwork only ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: 315 WYCKOFF HOLDING LLC · 22,690 sf lot · 1.14 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Roof11p · 3 filings · 20 docs
Floor 13p · 1 filing · 3 docs
Mezzanine3p · 1 filing · 3 docs
Cellar14p · 2 filings · 20 docs
Basement1p · 1 filing · 5 docs
Sub-Basement1p · 1 filing · 5 docs
Site & exterior1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MARGATE ATLANTIC2007/08/2026
CAPITAL ONE BANK1303/21/2026
GREENPOINT SAVINGS BANK1103/21/2026
HOME SAVINGS OF AMERICA903/21/2026
315 WYCKOFF HOLDING403/22/2026
SAVINGS OF AMERICA303/21/2026
CAPITOL ONE BANK203/21/2026
NORTH FORK BANK103/21/2026
CAPITAL ONE103/21/2026
GREENPOINT BANK103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GC1 EXPEDITING203/21/2026
PAUL FUSCO CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PERRY MECHANICAL CONTRACTGeneral Contractor303/21/2026
THE METRO GROUP PLBG LLCPlumbing207/08/2026
FEDER, IRVINGElectrical203/21/2026
VIVIANO, PAULElectrical203/21/2026
INTEGRATED HVAC SYS & SVCGeneral Contractor203/21/2026
METROPOLITAN MECHANICAL CGeneral Contractor203/21/2026
MILICIA ELECTRIC CORPGeneral Contractor203/21/2026
NAT'L MECH. SVCS PLBG LLCPlumbing207/08/2026
AZIZ ABDULElectrical103/21/2026
THE METRO GROUP, INCGeneral Contractor107/08/2026
ALKLEM PLUMBING INCPlumbing107/08/2026
CEESAY, BELALElectrical103/21/2026
CONA, ANGELOElectrical103/21/2026
ABDUL AZIZElectrical103/21/2026
PEIFLEY, MARKElectrical103/21/2026
RAPPO, FRANKElectrical103/21/2026
STEPHEN ROSTOWSKYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AGE ENGINEERING PLLC7746410/17/2025
METROPOLITAN MECHANICAL C2277111/10/2022
VINCENT J. LIOTTA P. E.1974106/27/2022
OBAID MIAN849101/16/2020
Building Lifecycle
All (99)Filed (11)Permit Issued (10)Signed Off (7)Violation (50)Inspection (3)Objection (2)Special Inspection (16)
06/11/2026
Violation issued (ECB, open)
Construction
12/11/2025
Signed off — Alteration
CONNECT REPLACEMENT GAS BURNER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01085423-S1
11/24/2025
Signed off — Alteration
CONNECT REPLACEMENT GAS BURNER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01085423-I1
11/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/05/2025
Signed off — Alteration
CONNECT REPLACEMENT GAS BURNER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01085423-S2
10/27/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
10/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
10/23/2025
Special inspection requirement — Maintenance information
Stephen Shishko
10/21/2025
Filed — Alteration
CONNECT REPLACEMENT GAS BURNER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01085423-P4
10/21/2025
Permit issued — Plumbing
B01085423-S1-PL
10/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
10/21/2025
Special inspection requirement — Maintenance information
Stephen Shishko
10/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
10/17/2025
Filed — Alteration
CONNECT REPLACEMENT GAS BURNER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01085423-P1
10/17/2025
Filed — Alteration
CONNECT REPLACEMENT GAS BURNER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01085423-P3
10/17/2025
Filed — Alteration
CONNECT REPLACEMENT GAS BURNER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01085423-P2
10/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
10/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
10/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Shishko
10/09/2025
Special inspection requirement — Final
Stephen Shishko
10/09/2025
Special inspection requirement — Chimneys and vents
Stephen Shishko
10/09/2025
Special inspection requirement — Mechanical Systems
Stephen Shishko
09/26/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/06/2025
Permit issued — Boiler Equipment
B01085423-I1-BE
05/06/2025
Permit issued — Plumbing
B01085423-S1-PL
08/15/2024
Permit issued — Plumbing
B01085423-S1-PL
08/13/2024
Permit issued — Boiler Equipment
B01085423-I1-BE
08/13/2024
Permit issued — Mechanical Systems
B01085423-S2-MS
08/09/2024
Filed — Alteration
CONNECT REPLACEMENT GAS BURNER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01085423-S1
08/09/2024
Filed — Alteration
CONNECT REPLACEMENT GAS BURNER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01085423-I1
08/09/2024
Filed — Alteration
CONNECT REPLACEMENT GAS BURNER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01085423-S2
03/06/2024
Signed off — Alteration
Carrier: T-Mobile. Modification of an existing antenna site. Install (1) new cabinet and replace (2) cabinets on existing platform. Replace (3) existing antennas and (6) existing RRUs on existing mounts on roof. No change in use, egress or occupancy.
B00886129-I1
12/13/2023
Violation issued (ECB, closed)
Plumbing
11/14/2023
Violation issued (FDNY_NOV, closed)
07/28/2023
Permit issued — Antenna
B00886129-I1-AN
07/12/2023
Objection raised — Other
07/12/2023
Objection resolved — Addressed
07/05/2023
Filed — Alteration
Carrier: T-Mobile. Modification of an existing antenna site. Install (1) new cabinet and replace (2) cabinets on existing platform. Replace (3) existing antennas and (6) existing RRUs on existing mounts on roof. No change in use, egress or occupancy.
B00886129-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/17/2023
Signed off — Alteration
REPLACEMENT OF COOLING TOWER. NO CHANGE TO USE, OCCUPANCY OR EGRESS
B08036327-I1
11/10/2022
Filed — Alteration
REPLACEMENT OF COOLING TOWER. NO CHANGE TO USE, OCCUPANCY OR EGRESS
B08036327-I1
11/10/2022
Permit issued — Mechanical Systems
B08036327-I1-MS
11/08/2022
Special inspection requirement — Final
PATRICK MCDONALD
11/08/2022
Special inspection requirement — Mechanical Systems
PATRICK MCDONALD
07/28/2022
Signed off — Alteration
INSTALLATION OF 1.5 TON SPLIT SYSTEM ON THE 1ST FLOOR OUTSIDE SPACE AND BASEMENT IT ROOM. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
B00712841-I1
07/05/2022
Permit issued — Mechanical Systems
B00712841-I1-MS
06/27/2022
Filed — Alteration
INSTALLATION OF 1.5 TON SPLIT SYSTEM ON THE 1ST FLOOR OUTSIDE SPACE AND BASEMENT IT ROOM. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
B00712841-I1
04/05/2022
Special inspection requirement — Final
Vincent Liotta
04/05/2022
Special inspection requirement — Mechanical Systems
Vincent Liotta
06/10/2021
Violation issued (FDNY_NOV, closed)
11/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/04/2020
Signed off — Alteration
B00204108-I1
01/17/2020
Permit issued — Mechanical Systems
B00204108-I1-MS
01/16/2020
Filed — Alteration
B00204108-I1
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/01/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALKLEM PLUMBING INC10/21/2025
DOB NOWBoiler EquipmentSigned-offTHE METRO GROUP PLBG LLC05/06/2025
DOB NOWPlumbingSigned-offTHE METRO GROUP PLBG LLC05/06/2025
DOB NOWPlumbingSigned-offNAT'L MECH. SVCS PLBG LLC08/15/2024
DOB NOWBoiler EquipmentSigned-offNAT'L MECH. SVCS PLBG LLC08/13/2024
DOB NOWMechanical SystemsSigned-offTHE METRO GROUP, INC08/13/2024
DOB NOWAntennaSigned-offMILICIA ELECTRIC CORP07/28/2023
DOB NOWMechanical SystemsSigned-offMETROPOLITAN MECHANICAL C11/10/2022
DOB NOWMechanical SystemsSigned-offINTEGRATED HVAC SYS SVC07/05/2022
DOB NOWMechanical SystemsSigned-offPERRY MECHANICAL CONTRACT01/17/2020
BISOTISSUEDVERICON CONSTRUCTION CO06/21/2019
BISOTISSUEDVERICON CONSTRUCTION CO03/28/2019
BISOTISSUEDFIVE STAR AWNINGS INC03/07/2019
BISOTISSUEDSQUAN CONSTRUCTION SERVIC10/21/2015
BISOTISSUEDSQUAN CONSTRUCTION SERVIC05/21/2015
BISOTISSUEDSECURITY VAULT WORKS INC10/30/2014
BISOTISSUEDMETROPOLITAN MECHANICAL C06/05/2013
BISEQISSUEDOUTDOOR INSTALLATIONS LLC05/02/2011
BISOTISSUEDAM&G WATERPROOFING LLC04/08/2011
BISEQISSUEDAM&G WATERPROOFING LLC04/08/2011
BISOTISSUEDADELHARDT CONST CORP03/30/2009
BISOTISSUEDADELHARDT CONST CORP03/30/2009
BISEQISSUEDADELHARDT CONST CORP03/30/2009
BISEQISSUEDADELHARDT CONST CORP09/03/2008
BISOTISSUEDADELHARDT CONST CORP09/03/2008
BIS—ISSUEDAMERICAN SIGN & ELECL CON03/04/2008
BIS—ISSUEDAMERICAN SIGN & ELECL CON03/04/2008
BISOTISSUEDMERCURY NATIONAL CONSTRUCTION11/14/2001
BISBLISSUEDJ H LOEWY INC08/23/2000
BISPLISSUEDJ H LOEWY INC08/23/2000
BISPLISSUEDVINESKI MAY PLUMBING & HEATING05/31/2000
BISOTISSUEDMARLITE CONST CORP01/07/2000
BISMHISSUEDMARLITE CONST CORP01/07/2000
BIS—ISSUEDGOING SIGN CO. INC.01/16/1996
BIS—ISSUEDGOING SIGN CO. INC.10/04/1995
BISOTISSUEDMARLITE11/18/1994
BISMHISSUEDCORSOCONTRACTINGCORP03/30/1994
BISPLISSUEDI.M.P. PLBG. & HTG. CORP09/08/1993
BISEQISSUEDJRS ARCHITECT P.C.03/05/1993
BISOTISSUEDJRS ARCHITECT P.C.03/05/1993
+ 11 more permits on file
3 projects · most recent 10/31/2023
General Wiring Lighting
FiledStatusContractorScope
10/31/2023Permit IssuedCODA ELECTRO CONT'G INC.9 meters
10/02/2019Permit IssuedCORP. ELEC'L TECHNOLOGIESGeneral Wiring, Lighting
04/25/2019Permit IssuedCORP. ELEC'L TECHNOLOGIESGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/27/2025Pass-Final Boiler Equipment InspectionPassView ↗
09/26/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
10/23/2025HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
10/23/2025HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
10/23/2025Maintenance informationStephen Shishkoenergy_progress
10/21/2025HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
10/21/2025Maintenance informationStephen Shishkoenergy_progress
10/21/2025HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
10/17/2025HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
10/17/2025HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
10/17/2025HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
10/09/2025FinalStephen Shishkoprogress
10/09/2025Chimneys and ventsStephen Shishkospecial
10/09/2025Mechanical SystemsStephen Shishkospecial
11/08/2022FinalPATRICK MCDONALDprogress
11/08/2022Mechanical SystemsPATRICK MCDONALDspecial
04/05/2022FinalVincent Liottaprogress
04/05/2022Mechanical SystemsVincent Liottaspecial
▾Documents — 234 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch10
08/29/2026B00712841-I1Request digital key ↗
08/28/2026B08036327-I1Request digital key ↗
08/24/2026B01085423-P4Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00204108-I1Request digital key ↗
▸Applications & Permits43
▸BISPLAN / WORK APPROVAL APPLICATION22
07/11/2019340666951Open ↗
03/27/2019340666951Open ↗
03/07/2019321609862Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION20
09/18/2019340666951Open ↗
06/24/2019340666951Open ↗
06/24/2019340666951Open ↗
Showing 3 of 20 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
06/25/2019340666951Open ↗
▸Seals & Professional Certifications62
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
03/18/2020321609862Open ↗
03/07/2019321609862Open ↗
12/18/2015321115486Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026B01085423-I1Open ↗
09/23/2026B01085423-I1Open ↗
09/23/2026B01085423-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/24/2026B01085423-I1Open ↗
08/24/2026B01085423-P2Open ↗
08/24/2026B01085423-S2Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
03/07/2019321609862Open ↗
06/06/2013320766863Open ↗
10/18/2010320227367Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
06/06/2013320766863Open ↗
10/18/2010320227367Open ↗
05/19/2010320160099Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B00712841-I1Open ↗
08/25/2026B08036327-I1Open ↗
08/25/2026B01085423-P3Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/27/2019340666951Open ↗
03/07/2019321609862Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/27/2019340666951Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/27/2019340666951Open ↗
▸Trade Schedules & Equipment12
▸BISEQUIPMENT USE APPLICATION/PERMIT4
07/08/2020340666951Open ↗
04/14/2010310133753Open ↗
04/14/2010310133753Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
07/08/2020340666951Open ↗
02/26/2014320766863Open ↗
04/17/2010310133753Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
08/14/2017321238219Open ↗
09/22/2015321115486Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/08/2010310133753Open ↗
▸BISSCHEDULE B - PLUMBING1
03/27/2019340666951Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/11/2019340666951Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/24/2026B01085423-P2Open ↗
08/24/2026B01085423-S2Open ↗
08/24/2026B01085423-S1Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
10/18/2010320227367Open ↗
05/13/2010320155988Open ↗
04/21/2008310133753Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
03/27/2019340666951Open ↗
09/22/2015321238219Open ↗
10/15/2014320972596Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
05/19/2010320160099Open ↗
05/13/2010320155979Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
12/18/2015321115486Open ↗
04/23/2015321115486Open ↗
03/20/2015320972596Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
07/06/2020340666951Open ↗
12/18/2015321115486Open ↗
03/20/2015320972596Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/06/2020340666951Open ↗
03/27/2019340666951Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B01085423-I1Open ↗
08/13/2026B01085423-S1Open ↗
▸BISNYCECC ANALYSIS1
03/27/2019340666951Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/27/2019340666951Open ↗
▸BISTR8: Energy Code Progress Inspections1
02/26/2014320766863Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
07/06/2020340666951Open ↗
07/06/2020340666951Open ↗
03/27/2019340666951Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs27
▸BISADMINISTRATIVE OBJECTIONS10
09/22/2015321238219Open ↗
04/23/2015321115486Open ↗
10/15/2014320972596Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
07/23/2020340666951Open ↗
03/18/2020321609862Open ↗
08/14/2017321238219Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
08/14/2017321238219Open ↗
10/12/2016321238219Open ↗
12/18/2015321115486Open ↗
Showing 3 of 7 on file for this type
▸Cost, Insurance & Ownership19
▸BISCOST AFFIDAVIT19
07/23/2020340666951Open ↗
03/18/2020321609862Open ↗
07/11/2019340666951Open ↗
Showing 3 of 19 on file for this type
▸Filing & Intake Forms19
▸BISEFILING COVER SHEET12
03/07/2019321609862Open ↗
09/22/2015321238219Open ↗
04/23/2015321115486Open ↗
Showing 3 of 12 on file for this type
▸BISADDITIONAL INFORMATION5
03/27/2020340666951Open ↗
03/27/2020340666951Open ↗
07/15/2019340666951Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM1
03/18/2020321609862Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/27/2019340666951Open ↗