← Back
BROOKLYN
316 22 STREET
BROOKLYN · Sunset Park (West) · BIN 3332133
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof116p · 7 filings · 20 docs
Floor 57p · 1 filing · 11 docs
Floor 485p · 3 filings · 20 docs
Floor 3110p · 6 filings · 20 docs
Floor 2105p · 6 filings · 20 docs
Floor 1110p · 7 filings · 20 docs
Cellar89p · 3 filings · 20 docs
Site & exterior11p · 2 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
316 22ND5507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MURAT MUTLU ARCHITECT605/23/2023
ADG ENGINEERING304/12/2023
ENGINEERING SOLUTIONS704/06/2023
ENTHINK ENGINEERS LLC607/20/2022
INOA ARCHITECTURE INC. PC106/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOYD CONSULTING3403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW LEAF DEVELOPMENT LLCGeneral Contractor1507/08/2026
A PLUS PLUMBING CORPPlumbing407/08/2026
PHOENIX SUTTON STR INCGeneral Contractor307/08/2026
MURAT MUTLUElectrical103/21/2026
E.M.P. FIRE SPRINKLER LLCFire Protection107/08/2026
ELPO ELECTRICAL CONTG INCElectrical103/22/2026
MAC FELDER INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPECIAL TESTING & CONSULT16881305/23/2023
Building Lifecycle
All (128)Filed (22)Permit Issued (12)Signed Off (8)Violation (9)Inspection (9)Objection (38)Special Inspection (30)
10/25/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/20/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/31/2023
Signed off — Alteration
PROVIDE NEW DOMESTIC COLD AND HOT WATER SYSTEM FOR A 4 STORY RESIDENTIAL LOW-RISE WITH SANITARY AND STORM DRAINAGE COMNECTION TO EXISTING SYSTEMS.
B00596259-I1
05/31/2023
Signed off — Alteration
PROVIDE AIR CONDITIONING AND VENTILATION SYSTEM FOR 4 FOUR STORY LOW RISE BUILDING.
B00658555-I1
05/25/2023
Special inspection requirement — Lighting in dwelling units
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Energy Code Compliance Inspections
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Fenestration air leakage
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Interior lighting power
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Fire-Resistance Rated Construction
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Lighting controls
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Metering
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Air barrier - visual inspection
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Fenestration areas
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Concrete - Cast-In-Place
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Subgrade Inspections
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Exterior lighting power
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Maintenance information
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Permanent certificate
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Insulation placement and R values
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Electrical motors and elevators
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Energy Code Compliance Inspections
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Concrete - Cast-In-Place
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Subgrade Inspections
SEBASTIAN SETTEDUCATE JR., P.E
05/25/2023
Special inspection requirement — Fire-Resistance Rated Construction
SEBASTIAN SETTEDUCATE JR., P.E
05/23/2023
Filed — Alteration CO
PROPOSED RESIDENTIAL CONVERSION UNDER ARTICLE 2 CHAPTER 3 FOR EXISTING THREE STORY STORAGE FACILITY INTO 4 STORY 9 FAMILY MULTIPLE DWELLING UNIT BUILDING AS PER C OF O AUG, 11 1949. FILED WITH JOB #B00124194.
B00583060-P3
04/25/2023
Signed off — Alteration
Addition of new stairway and elevator through the building. Removal of existing ramp and new infill slabs. New openings in existing slabs. Infill floor slab at 4th Floor and new Roof slab.
B00581780-I1
04/20/2023
Signed off — Alteration
Propose to remove all non-bearing, non-structural interior components, and preparation to commence construction activity, filed under separate application number. No change to use, egress or occupancy
B00581651-I1
04/14/2023
Objection raised — Other
04/14/2023
Objection resolved — Addressed
04/13/2023
Objection raised — Admin
04/13/2023
Objection resolved — Addressed
04/12/2023
Filed — Alteration
Addition of new stairway and elevator through the building. Removal of existing ramp and new infill slabs. New openings in existing slabs. Infill floor slab at 4th Floor and new Roof slab.
B00581780-P2
04/11/2023
Signed off — Alteration
FILING TO PROVIDE AN AUTOMATIC SPRINKLER SYSTEM FOR A FOUR (4) STORY RESIDENTIAL LOW-RISE BUILDING.
B00596310-I1
04/10/2023
Filed — Alteration CO
PROPOSED RESIDENTIAL CONVERSION UNDER ARTICLE 2 CHAPTER 3 FOR EXISTING THREE STORY STORAGE FACILITY INTO 4 STORY 9 FAMILY MULTIPLE DWELLING UNIT BUILDING AS PER C OF O AUG, 11 1949. FILED WITH JOB #B00124194.
B00583060-P1
04/06/2023
Filed — Alteration
PROVIDE AIR CONDITIONING AND VENTILATION SYSTEM FOR 4 FOUR STORY LOW RISE BUILDING.
B00658555-P1
03/13/2023
Filed — Alteration
FILING TO PROVIDE AN AUTOMATIC SPRINKLER SYSTEM FOR A FOUR (4) STORY RESIDENTIAL LOW-RISE BUILDING.
B00596310-P2
01/17/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/12/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/06/2023
Objection resolved — Addressed
01/05/2023
Objection raised — Scope
01/03/2023
Filed — Alteration
FILING TO PROVIDE AN AUTOMATIC SPRINKLER SYSTEM FOR A FOUR (4) STORY RESIDENTIAL LOW-RISE BUILDING.
B00596310-P1
01/03/2023
Filed — Alteration
PROVIDE NEW DOMESTIC COLD AND HOT WATER SYSTEM FOR A 4 STORY RESIDENTIAL LOW-RISE WITH SANITARY AND STORM DRAINAGE COMNECTION TO EXISTING SYSTEMS.
B00596259-P1
12/21/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/30/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/31/2022
Signed off — Alteration
B00750034-I1
10/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/27/2022
Permit issued — Plumbing
B00596259-I1-PL
09/09/2022
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00623148-I1
09/09/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00595937-I1
09/09/2022
Permit issued — General Construction
B00581651-I1-GC
Latest 60 of 128 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA PLUS PLUMBING CORP09/27/2022
DOB NOWGeneral ConstructionSigned-offNEW LEAF DEVELOPMENT LLC09/09/2022
DOB NOWStructuralSigned-offNEW LEAF DEVELOPMENT LLC08/22/2022
DOB NOWGeneral ConstructionPermit IssuedNEW LEAF DEVELOPMENT LLC08/11/2022
DOB NOWConstruction FenceSigned-offNEW LEAF DEVELOPMENT LLC07/06/2022
DOB NOWMechanical SystemsSigned-offNEW LEAF DEVELOPMENT LLC04/22/2022
DOB NOWSprinklersSigned-offE.M.P. FIRE SPRINKLER LLC03/28/2022
DOB NOWGeneral ConstructionPermit IssuedNEW LEAF DEVELOPMENT LLC02/14/2022
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC11/03/2021
DOB NOWPlumbingSigned-offMAC FELDER INC10/22/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC09/17/2021
DOB NOWGeneral ConstructionSigned-offNEW LEAF DEVELOPMENT LLC09/09/2021
4 projects · most recent 08/31/2026
General Wiring
FiledStatusContractorScope
08/31/2026Permit IssuedCLAIRMONT ELEC'L CONTR'GGeneral Wiring
12/06/2022CompleteAROUND ELECTRIC CORP.General Wiring
08/25/2022CompleteTITAN ELEC'L & ELEV CONTR—
09/15/2021CompleteELPO ELECTRICAL CONTG INC—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
10/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/17/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/12/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/30/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/28/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/28/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 101
DateRequirementInspectorRole
05/25/2023Air barrier - visual inspectionSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/25/2023Fenestration air leakageSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/25/2023Permanent certificateSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/25/2023Lighting controlsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/25/2023Lighting in dwelling unitsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/25/2023HVAC-R and service water piping design and insulationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/25/2023Electrical motors and elevatorsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/25/2023MeteringSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/25/2023Air barrier - visual inspectionSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/25/2023Fenestration and door U-factor and product ratingsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/25/2023Fenestration areasSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/25/2023Insulation placement and R valuesSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/25/2023Exterior lighting powerSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/25/2023Interior lighting powerSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/25/2023Subgrade InspectionsSEBASTIAN SETTEDUCATE JR., P.Especial
05/25/2023Mastic and Intumescent Fire-resistant CoatingsSEBASTIAN SETTEDUCATE JR., P.Especial
05/25/2023Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
05/25/2023Exterior Insulation and Finish Systems (EIFS)SEBASTIAN SETTEDUCATE JR., P.Especial
05/25/2023Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
05/25/2023Fire-Resistance Rated ConstructionSEBASTIAN SETTEDUCATE JR., P.Eprogress
05/25/2023Exterior lighting powerSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/25/2023Maintenance informationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/25/2023Lighting controlsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/25/2023Fenestration air leakageSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/25/2023Permanent certificateSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
Latest 25 of 101.
▾Documents — 148 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch23
09/01/2026B00581651-I1Request digital key ↗
09/01/2026B00595937-I1Request digital key ↗
09/01/2026B00595937-P1Request digital key ↗
Showing 3 of 23 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation1
08/01/2022340823808Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
10/12/2021340823808Open ↗
▸BISWORK PERMIT APPLICATION1
12/07/2022322161129Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B00583060-P3Open ↗
08/13/2026B00583060-P2Open ↗
08/13/2026B00583060-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
01/20/2023322161129Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/20/2023322161129Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/20/2023322161129Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00583060-I1Open ↗
▸Seals & Professional Certifications54
▸DOB NOWDPL-1: Design Professional Seal & Signature23
09/01/2026B00581651-I1Open ↗
09/01/2026B00581651-P1Open ↗
09/01/2026B00595937-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/28/2026B00581651-P1Open ↗
09/25/2026B00596259-P1Open ↗
09/02/2026B00583060-P3Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/28/2026B00581651-P1Open ↗
09/02/2026B00583060-P3Open ↗
09/02/2026B00583060-P3Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/12/2021340823808Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026B00583060-P2Open ↗
08/13/2026B00583060-P1Open ↗
08/13/2026B00583060-P3Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist4
08/27/2026B00583060-P2Open ↗
08/27/2026B00583060-P3Open ↗
08/27/2026B00583060-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
08/01/2022340823808Open ↗
▸BISSTREET TREE CHECKLIST1
08/01/2022340823808Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00583060-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00583060-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00583060-I1Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
09/01/2026B00581651-I1Open ↗
09/01/2026B00596259-I1Open ↗
09/01/2026B00596259-P1Open ↗
Showing 3 of 16 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00583060-I1Open ↗
08/13/2026B00658555-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION4
01/20/2023322161129Open ↗
01/20/2023322161129Open ↗
12/08/2022322161129Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
10/12/2021340823808Open ↗
▸BISADDITIONAL INFORMATION1
08/01/2022340823808Open ↗
▸BISEFILING COVER SHEET1
12/07/2022322161129Open ↗
▸Other Documents22
▸DOB NOWProperty Ownership Certification4
08/27/2026B00583060-I1Open ↗
08/27/2026B00583060-P3Open ↗
08/27/2026B00583060-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026B00583060-I1Open ↗
08/13/2026B00583060-P1Open ↗
08/13/2026B00583060-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B00583060-I1Open ↗
08/13/2026B00583060-P2Open ↗
08/13/2026B00583060-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026B00583060-P1Open ↗
08/13/2026B00583060-I1Open ↗
08/13/2026B00583060-P2Open ↗
Showing 3 of 4 on file for this type
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
01/20/2023322161129Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/01/2022340823808Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
01/20/2023322161129Open ↗
▸BISPLOT DIAGRAM1
01/20/2023322161129Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00583060-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00583060-I1Open ↗