BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
316 BOWERY
MANHATTAN · Greenwich Village · BIN 1008200
💬 Discuss this project
1868Year Built
4Stories
RMBuilding Class
C6-1Zoning
9,017 sfGross Floor Area
4Units
Rent Stabilized1 Active Violation 3 old, status unconfirmed ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 2 Bleeker Street Condominium · 1,795 sf lot · 5.02 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 42 Bleecker Street Condo1p · 1 filing · 5 docs
Floor 3
Floor 2
Floor 1J.Crew11p · 4 filings · 17 docs
CellarTwo hour rated interior partition6p · 2 filings · 8 docs
Site & exterior2 Bleecker Street Condo8p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
316 Bowery Realty3703/21/2026
316 Bowery1303/21/2026
2 Bleecker Street Condo503/22/2026
316 Bowery Corp %Murat Bugdaycay203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Enthink Engineers208/16/2023
Revans Design PE107/05/2023
HC Engineering202/10/2023
Ida Galea, Architect104/15/2022
Montroy Architecture208/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Suska203/21/2026
JP Expedite403/21/2026
Beam Living203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Andamio ScaffoldingScaffold603/21/2026
Kanaris ContractingGeneral Contractor207/08/2026
Signs CadSign hanger207/08/2026
Will Cos Electric CoElectrical103/21/2026
Demar MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Revans Design PE4617107/05/2023
Building Lifecycle
All (82)Filed (8)Permit Issued (7)Signed Off (7)Violation (43)Inspection (1)Objection (7)Special Inspection (9)
04/29/2026
Violation issued (HPD, closed)
A
06/23/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/04/2025
Violation issued (HPD, closed)
A
12/04/2024
Signed off — Alteration
REGISTER EXISTING CONDENSING BOILER IN 4TH FLOOR DWELLING. NO CHANGE INMEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
M00887837-I1
04/26/2024
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00915369-I1
04/26/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00865601-I1
01/19/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/08/2023
Signed off — Alteration
ERECT NON-ILLUMINATED ACCESSORY WALL SIGN-A1 ON STOREFRONT, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M00822030-I1
11/08/2023
Signed off — Alteration
ERECT NON-ILLUMINATED ACCESSORY WALL SIGN-A2 ON STOREFRONT, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M00822054-I1
08/16/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00915369-I1
08/16/2023
Permit issued — Supported Scaffold
M00915369-I1-SF
07/26/2023
Permit issued — Boiler Equipment
M00887837-I1-BE
07/05/2023
Filed — Alteration
REGISTER EXISTING CONDENSING BOILER IN 4TH FLOOR DWELLING. NO CHANGE INMEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
M00887837-I1
06/08/2023
Special inspection requirement — Heating Systems
PAUL REVANS
06/08/2023
Special inspection requirement — HVAC-R and service water heating equipment
PAUL REVANS
06/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL REVANS
06/08/2023
Special inspection requirement — HVAC-R and service water heating system controls
PAUL REVANS
06/08/2023
Special inspection requirement — Maintenance information
PAUL REVANS
05/04/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00865601-I1
05/04/2023
Permit issued — Sidewalk Shed
M00865601-I1-SH
04/24/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/24/2023
Violation issued (ECB, closed)
Construction
02/10/2023
Filed — Alteration
ERECT NON-ILLUMINATED ACCESSORY WALL SIGN-A1 ON STOREFRONT, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M00822030-I1
02/10/2023
Filed — Alteration
ERECT NON-ILLUMINATED ACCESSORY WALL SIGN-A2 ON STOREFRONT, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M00822054-I1
02/10/2023
Permit issued — Sign
M00822030-I1-SG
02/10/2023
Permit issued — Sign
M00822054-I1-SG
02/01/2023
Special inspection requirement — Final
Hackjong Choi
06/29/2022
Signed off — Alteration
M00714241-I1
06/27/2022
Permit issued — General Construction
M00714241-I1-GC
04/15/2022
Filed — Alteration
M00714241-I1
10/20/2021
Signed off — Alteration
Filing for General Construction interior demo to the Cellar and 1st floor as per plans filed herewith. No change in use, egress, or occupancy.
M00495139-I1
10/04/2021
Objection raised — Other
10/04/2021
Objection raised — Other
10/04/2021
Objection raised — Other
10/04/2021
Objection raised — Other
10/04/2021
Objection raised — Other
10/01/2021
Objection raised — Fire_Protection
10/01/2021
Objection raised — Fire_Protection
09/29/2021
Permit issued — General Construction
M00495139-I1-GC
08/24/2021
Filed — Alteration CO
General construction modification in the cellar and 1st floor for new egress stair as per plans filed herewith. Application submitted for a partial certificate of occupancy in Cellar and 1st Floor.
M00486690-I1
07/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/15/2021
Special inspection requirement — Fire-Resistance Rated Construction
06/08/2021
Filed — Alteration
Filing for General Construction interior demo to the Cellar and 1st floor as per plans filed herewith. No change in use, egress, or occupancy.
M00495139-I1
04/16/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/30/2021
Special inspection requirement — Final
DANIEL MONTROY
10/23/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/04/2020
Violation issued (ECB, closed)
Construction
05/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/05/2018
Violation issued (HPD, closed)
I
03/21/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/19/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/19/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/19/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/19/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/19/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/24/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/11/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/23/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/23/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding08/16/2023
DOB NOWBoiler EquipmentSigned-offDemar Mechanical07/26/2023
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding05/04/2023
DOB NOWSignSigned-offSigns Cad02/10/2023
DOB NOWSignSigned-offSigns Cad02/10/2023
DOB NOWGeneral ConstructionSigned-offKanaris Contracting06/27/2022
DOB NOWGeneral ConstructionSigned-offKanaris Contracting09/29/2021
BIS—ISSUEDIdeal Renovation08/23/2011
BISPLISSUEDForte Express P & H07/27/2009
BISPLISSUEDForte Express P & H05/20/2008
BISEQISSUEDArsenal Scaffold05/05/2008
BISMHISSUEDTFN Development Corp Dba/E.coast04/07/2008
BISOTISSUEDTFN Development Corp Dba/E.coast04/07/2008
BISMHISSUEDHN Group03/14/2008
BISOTISSUEDHN Group03/14/2008
BISPLISSUEDCatman Plumbing03/07/2008
BISMHISSUEDHN Group01/24/2008
BISOTISSUEDHN Group01/24/2008
BISMHISSUEDTFN Development Corp Dba/E.coast12/06/2007
BIS—ISSUEDPreserv BLD Restoration Management05/13/2004
BISEQISSUEDPerimeter Bridge & Scaffold04/13/2004
BISEQISSUEDPerimeter Bridge & Scaffold04/13/2004
BISFPISSUEDActive Fire Control Co/Fire Exti08/08/2003
BISPLISSUEDPinnacle Plumbing & Heating05/29/2003
BISOTISSUEDFarh Contracting ___Corp05/12/2003
BISOTISSUEDH R Ventures04/18/2003
BIS—ISSUEDHB Ventures04/18/2003
BISEQISSUEDNew Century Construction01/31/2003
BIS—ISSUEDBerger Sign Fabrication08/16/2002
BIS—ISSUEDHB Ventures07/16/2002
BISPLISSUEDKBM Brand P & H Co01/07/1998
BISPLISSUEDKBM Brand PLG & Heating Co11/13/1997
BISOTISSUEDH & H BLDNG Consnt11/10/1997
BISOTISSUEDH & H BLDNG Consnt11/10/1997
BIS—ISSUEDGeorge Schwartz Architect07/03/1996
BISPLISSUEDPrime Piping & Heating06/20/1996
BISPLISSUEDPrime Piping & Heating02/28/1996
BISEQISSUEDGeorge Schwarz Arch09/07/1995
BISOTRE-ISSUEDH R Ventures09/07/1995
3 projects · most recent 08/09/2023
General Wiring
FiledStatusContractorScope
08/09/2023CompleteEcny Electrical ContractorsGeneral Wiring
05/31/2023Permit IssuedEcny Electrical ContractorsGeneral Wiring
05/03/2023CompleteBorowide Elect'l Contractors—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/19/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/08/2023Heating SystemsPAUL REVANSspecial
06/08/2023HVAC-R and service water heating equipmentPAUL REVANSenergy_progress
06/08/2023HVAC-R and service water piping design and insulationPAUL REVANSenergy_progress
06/08/2023HVAC-R and service water heating system controlsPAUL REVANSenergy_progress
06/08/2023Maintenance informationPAUL REVANSenergy_progress
02/01/2023FinalHackjong Choiprogress
07/15/2021Fire-Resistant Penetrations and Joints—special
07/15/2021Fire-Resistance Rated Construction—progress
03/30/2021FinalDANIEL MONTROYprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
J.CrewRetailFloor 1
Project M00822030 Alteration · LOC Issued · 02/10/2023
Project M00822054 Alteration · LOC Issued · 02/10/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 117 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/03/2026M00495139-I1Request digital key ↗
09/02/2026M00714241-I1Request digital key ↗
08/31/2026M00822054-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits26
▸BISPLAN / WORK APPROVAL APPLICATION12
09/01/2011110449462Open ↗
08/10/2010120430417Open ↗
01/20/2010120247857Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION8
09/06/2011110449462Open ↗
07/30/2008110225765Open ↗
05/09/2008110191159Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWLPC Approval/Permit4
09/03/2026M00495139-I1Open ↗
08/13/2026M00822054-I1Open ↗
08/13/2026M00822030-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPLACE OF ASSEMBLY1
09/20/2010110461367Open ↗
▸BISPLACE OF ASSEMBLY APPLICATION1
09/20/2010110461367Open ↗
▸Seals & Professional Certifications28
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
09/06/2011110449462Open ↗
09/06/2011110449462Open ↗
09/20/2010110461367Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/03/2026M00495139-I1Open ↗
09/02/2026M00714241-I1Open ↗
08/30/2026M00887837-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
08/05/2010120430417Open ↗
08/05/2010120430417Open ↗
05/19/2008110167854Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026M00887837-I1Open ↗
08/28/2026M00495139-I1Open ↗
08/23/2026M00822030-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/05/2010120430417Open ↗
05/19/2008110167854Open ↗
▸BISPC FULL REPORT2
01/02/2008110043756Open ↗
01/02/2008110043756Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026M00887837-I1Open ↗
▸Trade Schedules & Equipment9
▸BISSELF-CERT PLUMBING NOTICE6
12/08/2008110043756Open ↗
11/26/2008110043756Open ↗
09/26/2008110043756Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING3
02/09/2009110449462Open ↗
02/09/2009110449462Open ↗
11/18/2008110043756Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
02/09/2009110449462Open ↗
▸Environmental & Asbestos12
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
09/20/2010110461367Open ↗
08/05/2010120430417Open ↗
01/20/2010120247857Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
02/09/2009110449462Open ↗
07/24/2008110225765Open ↗
05/19/2008110167854Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/03/2026M00495139-I1Open ↗
08/30/2026M00887837-I1Open ↗
08/13/2026M00822030-I1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs12
▸BISADMINISTRATIVE OBJECTIONS7
08/05/2010120430417Open ↗
01/20/2010120247857Open ↗
02/09/2009110449462Open ↗
Showing 3 of 7 on file for this type
▸BISLANDMARKS APPROVAL4
09/20/2010110449462Open ↗
06/19/2009110449462Open ↗
05/19/2008110167854Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
02/09/2009110449462Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
02/09/2009110449462Open ↗
02/09/2009110449462Open ↗
02/09/2009110449462Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET7
01/20/2010120247857Open ↗
02/09/2009110449462Open ↗
02/09/2009110449462Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION1
09/01/2011110449462Open ↗
▸BISeFiling Job Application Cover Sheet1
08/05/2010120430417Open ↗
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
03/24/2010120247857Open ↗
03/15/2010120247857Open ↗
▸BISPLOT DIAGRAM2
08/05/2010120430417Open ↗
02/09/2009110449462Open ↗
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
09/02/2008110225765Open ↗