HPD12/24/2020§ 27-2028, 2032 ADMIN.CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE ENTIRE APARTMENT LOCATED AT APT FLOOR2, 2nd STORY
Flood zone X500
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Contractors (License-Anchored)
Firm
Trade
Roles
Most Recent
Aurora P & H Cont
Plumbing
1
05/13/2019
Building Lifecycle
07/28/2026
Boiler inspection report filed
Initial · no defects · Accepted
07/28/2025
Boiler inspection report filed
Initial · no defects · Accepted
05/15/2024
Boiler inspection report filed
Initial · no defects · Accepted
10/24/2023
Boiler inspection report filed
Initial · no defects · Accepted
07/27/2022
Boiler inspection report filed
Initial · no defects · Accepted
26 history events on file for this building. Sign in free to see the full history. Sign in · Create account