← Back
Primarily 1 family with 1 store or office
3165 CONEY ISLAND AVENUE
BROOKLYN · BIN 3245356
💬 Discuss this project
1930Year Built
2Stories
S1Building Class
R6Zoning
3,120 sfGross Floor Area
2Units
6 Open Violations ▸FDNY Report ↗
Primarily 1 family with 1 store or office · Owner of record: CARELAND REALTY, LLC · 1,380 sf lot · 2.26 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanical
Cellar1p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZESTLAND REALTY1607/08/2026
CARELAND REALTY, LLC203/22/2026
TO THE OWNER OF 3165 CONE103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/12/2020$788K—Private party → CARELAND REALTY, LLC$252/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KING DAVID ARCHITECTURE PC412/03/2025
HWL ENGINEERING PC203/06/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
4444 PPPP803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MORELL BUILDERS INCGeneral Contractor207/08/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AG ENGINEERING PLLC8899512/03/2025
CL ENGINEERING P.C.6781102/10/2025
Building Lifecycle
All (84)Filed (6)Permit Issued (3)Signed Off (3)Violation (29)Inspection (4)Objection (16)Special Inspection (23)
01/26/2026
Signed off — Alteration
Providing plumbing plans for commercial space bathroom to replace fixtures with new.
B01179741-I1
01/12/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/05/2026
Signed off — Alteration
Remove and replace the floor system of the 1st Floor; Resolve DOB Violations.
B01176521-I1
01/02/2026
Signed off — Alteration
Proposed partition and finished floor plans for 1st floor commercial space and cellar of existing 2 story mixed use building. PROPOSED 1ST FL TO BE REPLACED AS PER STRUCTURAL PLANS..Proposed to comply with ECB violation # 39093121P, 39136874R.
B01179713-I1
12/26/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/15/2025
Special inspection requirement — Interior lighting power
ARIEL GOLSHAN
12/15/2025
Special inspection requirement — Lighting controls
ARIEL GOLSHAN
12/15/2025
Special inspection requirement — Energy Code Compliance Inspections
ARIEL GOLSHAN
12/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
ARIEL GOLSHAN
12/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ARIEL GOLSHAN
12/11/2025
Special inspection requirement — Maintenance information
ARIEL GOLSHAN
12/11/2025
Special inspection requirement — Energy Code Compliance Inspections
ARIEL GOLSHAN
12/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ARIEL GOLSHAN
12/03/2025
Filed — Alteration
Proposed partition and finished floor plans for 1st floor commercial space and cellar of existing 2 story mixed use building. PROPOSED 1ST FL TO BE REPLACED AS PER STRUCTURAL PLANS..Proposed to comply with ECB violation # 39093121P, 39136874R.
B01179713-P1
12/03/2025
Filed — Alteration
Providing plumbing plans for commercial space bathroom to replace fixtures with new.
B01179741-P1
12/02/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ARIEL GOLSHAN
12/02/2025
Special inspection requirement — Energy Code Compliance Inspections
ARIEL GOLSHAN
12/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
ARIEL GOLSHAN
12/02/2025
Special inspection requirement — Interior lighting power
ARIEL GOLSHAN
12/02/2025
Special inspection requirement — Lighting controls
ARIEL GOLSHAN
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ARIEL GOLSHAN
12/02/2025
Special inspection requirement — Energy Code Compliance Inspections
ARIEL GOLSHAN
12/02/2025
Special inspection requirement — Maintenance information
ARIEL GOLSHAN
03/31/2025
Permit issued — Plumbing
B01179741-I1-PL
03/25/2025
Permit issued — General Construction
B01179713-I1-GC
03/25/2025
Permit issued — Structural
B01176521-I1-ST
03/13/2025
Special inspection requirement — Structural Steel - Details
03/12/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
03/12/2025
Special inspection requirement — Post-installed Anchors
03/06/2025
Filed — Alteration
Remove and replace the floor system of the 1st Floor; Resolve DOB Violations.
B01176521-P1
03/05/2025
Objection resolved — Addressed
03/05/2025
Objection resolved — Addressed
03/05/2025
Special inspection requirement — Wood – Seismic Resistance
03/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/05/2025
Special inspection requirement — Final
03/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/21/2025
Objection resolved — Addressed
02/20/2025
Objection resolved — Addressed
02/19/2025
Objection raised — Scope
02/19/2025
Objection raised — Scope
02/18/2025
Objection raised — Zoning
02/18/2025
Objection raised — Structural
02/18/2025
Objection resolved — Addressed
02/18/2025
Objection raised — Admin
02/18/2025
Objection resolved — Addressed
02/18/2025
Objection raised — Structural
02/18/2025
Objection resolved — Addressed
02/18/2025
Objection raised — Plumbing
02/18/2025
Objection raised — Structural
02/18/2025
Objection resolved — Addressed
02/13/2025
Filed — Alteration
Providing plumbing plans for commercial space bathroom to replace fixtures with new.
B01179741-I1
02/13/2025
Filed — Alteration
Proposed partition and finished floor plans for 1st floor commercial space and cellar of existing 2 story mixed use building. PROPOSED 1ST FL TO BE REPLACED AS PER STRUCTURAL PLANS..Proposed to comply with ECB violation # 39093121P, 39136874R.
B01179713-I1
02/10/2025
Filed — Alteration
Remove and replace the floor system of the 1st Floor; Resolve DOB Violations.
B01176521-I1
01/29/2025
Violation issued (ECB, closed)
Construction
01/29/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/29/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/22/2023
Violation issued (ECB, closed)
Boilers
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING03/31/2025
DOB NOWGeneral ConstructionSigned-offMORELL BUILDERS INC03/25/2025
DOB NOWStructuralSigned-offMORELL BUILDERS INC03/25/2025
BISMHISSUEDBELAM CONSTRUCTION INC12/11/1998
BISOTISSUEDBELAM CONSTRUCTION12/03/1998
1 project · most recent 02/02/2025
General Wiring
FiledStatusContractorScope
02/02/2025Permit IssuedACCURATE ELEC'L CORP.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/12/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/26/2025Pass-Final General Construction Non-Directive 14PassView ↗
12/02/2025Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
12/15/2025Interior lighting powerARIEL GOLSHANenergy_progress
12/15/2025Lighting controlsARIEL GOLSHANenergy_progress
12/15/2025Energy Code Compliance InspectionsARIEL GOLSHANprogress
12/15/2025Fire-Resistance Rated ConstructionARIEL GOLSHANprogress
12/15/2025Fire-Resistant Penetrations and JointsARIEL GOLSHANspecial
12/11/2025Maintenance informationARIEL GOLSHANenergy_progress
12/11/2025Energy Code Compliance InspectionsARIEL GOLSHANprogress
12/11/2025Fire-Resistant Penetrations and JointsARIEL GOLSHANspecial
12/02/2025Fire-Resistant Penetrations and JointsARIEL GOLSHANspecial
12/02/2025Energy Code Compliance InspectionsARIEL GOLSHANprogress
12/02/2025Fire-Resistance Rated ConstructionARIEL GOLSHANprogress
12/02/2025Interior lighting powerARIEL GOLSHANenergy_progress
12/02/2025Lighting controlsARIEL GOLSHANenergy_progress
12/02/2025Fire-Resistant Penetrations and JointsARIEL GOLSHANspecial
12/02/2025Energy Code Compliance InspectionsARIEL GOLSHANprogress
12/02/2025Maintenance informationARIEL GOLSHANenergy_progress
03/13/2025Structural Steel - Details—special
03/12/2025Construction Operations Influencing Adjacent Structures—special
03/12/2025Post-installed Anchors—special
03/05/2025Wood – Seismic Resistance—special
03/05/2025Tenant Protection Plan Compliance—special
03/05/2025Final—progress
03/05/2025Structural Stability – Alterations of existing buildings—special
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/22/2026B01176521-P1Request digital key ↗
08/22/2026B01176521-I1Request digital key ↗
08/22/2026B01179741-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature8
09/24/2026B01179741-I1Open ↗
09/24/2026B01179741-I1Open ↗
09/23/2026B01179713-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/22/2026B01176521-P1Open ↗
08/22/2026B01176521-I1Open ↗
08/22/2026B01179741-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/24/2026B01179741-I1Open ↗
09/23/2026B01179713-P1Open ↗
08/29/2026B01179713-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/22/2026B01176521-P1Open ↗
08/22/2026B01176521-I1Open ↗
08/22/2026B01179741-I1Open ↗
Showing 3 of 6 on file for this type