← Back
Elevator apt, semi-fireproof without stores
3165 VILLA AVENUE
BRONX · BIN 2017657
💬 Discuss this project
2024Year Built
9Stories
D1Building Class
R8Zoning
37,901 sfGross Floor Area
57Units
Rent Stabilized24 Open Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: VILLA 26 LLC · 6,467 sf lot · 5.86 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire ProtectionEquipment
Roof4p · 4 filings · 20 docs
Bulkhead4p · 2 filings · 20 docs
Floor 95p · 3 filings · 20 docs
Floor 84p · 3 filings · 20 docs
Floor 74p · 3 filings · 20 docs
Floor 64p · 3 filings · 20 docs
Floor 54p · 3 filings · 20 docs
Floor 44p · 3 filings · 20 docs
Floor 35p · 3 filings · 20 docs
Floor 24p · 3 filings · 20 docs
Floor 13p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SPAXEL507/08/2026
TRI BOROUGH SCAFFOLDING607/08/2026
PROPCO1707/08/2026
3165 VILLA1503/21/2026
VILLA 261503/21/2026
3165 AVENUE503/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/29/2023$4.5M—AG-SPAXEL 3165 PROPERTY OWNER, L.L.C. → VILLA 26 LLC— not available
05/21/2020$2.1M—3165-3169 VILLA AVENUE LLC → 3165 VILLA AVENUE LLC— not available
06/07/2017$600K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS203/21/2026
AE DESIGN SOLUTION203/21/2026
EXPEDITING 4 U903/21/2026
SYNERGY BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UA BUILDERS CORPGeneral Contractor1407/08/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor903/21/2026
ENDRE BANYAElectrical603/21/2026
ON STAR MANAGEMENT LLCGeneral Contractor607/08/2026
TFK ELECTRIC CORP 004849General Contractor603/22/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor507/08/2026
PRECISION HOIST & SCAFFO*General Contractor407/08/2026
POWER DIRECT ELECTRIC INCElectrical103/22/2026
BEST MECHANICAL SVCS INCPlumbing107/08/2026
RIGHTWAY PLBG AND HTG INCFire Protection107/08/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616601/23/2024
TOHFAZ UDDIN P.E.2001211/10/2022
Building Lifecycle
All (108)Filed (15)Permit Issued (20)Signed Off (9)Violation (13)Inspection (8)Objection (10)Special Inspection (30)Tax Incentive (3)
07/01/2026
421-a(16) construction completed
03/30/2026
Violation issued (ECB, closed)
Elevators
10/01/2025
Violation issued (ECB, closed)
Elevators
09/03/2024
421-a(16) registration filed
07/10/2024
Signed off — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING JOB #220631341.
X00947589-I1
07/01/2024
Signed off — Alteration
SPRINKLER APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING JOB #220631341.
X00947591-I1
06/20/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/05/2024
Signed off — Alteration
MECHANICAL APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING JOB #220631341.
X00947587-I1
05/28/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/24/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/22/2024
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
X00989959-S1
05/22/2024
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
X00989959-I1
05/13/2024
Signed off — Alteration
FENCE APPLICATION FILED IN CONJUNCTION WITH NB JOB# 220631341.
X00959124-I1
03/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/18/2024
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
03/14/2024
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
03/11/2024
Objection resolved — Addressed
03/11/2024
Objection resolved — Addressed
03/08/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/05/2024
Violation issued (ECB, closed)
Unknown
02/05/2024
Violation issued (ECB, closed)
Construction
02/05/2024
Violation issued (ECB, closed)
Unknown
02/05/2024
Violation issued (ECB, closed)
Unknown
02/01/2024
Signed off — Alteration
Installation of 6,200# temporary single car personnel/material hoist per plan and application submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X00773177-I1
01/29/2024
Objection raised — Scope
01/26/2024
Objection raised — Scope
01/26/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
01/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
01/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
01/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/26/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
01/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/26/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
01/26/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
01/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
01/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
01/26/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
01/26/2024
Special inspection requirement — Heating Systems
FAHAD FATEH
01/26/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
01/26/2024
Special inspection requirement — Final
FAHAD FATEH
01/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
01/26/2024
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
01/26/2024
Special inspection requirement — Shutoff dampers
FAHAD FATEH
01/23/2024
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING JOB #220631341.
X00947589-P1
01/23/2024
Filed — Alteration
SPRINKLER APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING JOB #220631341.
X00947591-P2
01/23/2024
Filed — Alteration
MECHANICAL APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING JOB #220631341.
X00947587-P1
01/21/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
01/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/21/2024
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
01/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/21/2024
Special inspection requirement — Heating Systems
FAHAD FATEH
01/21/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
01/21/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/21/2024
Special inspection requirement — Final
FAHAD FATEH
01/21/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
01/18/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING01/17/2024
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING01/17/2024
DOB NOWProtection and Mechanical MethodsSigned-offCONSOLIDATED SCAFFOLDING01/17/2024
DOB NOWSprinklersSigned-offRIGHTWAY PLBG AND HTG INC12/27/2023
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC12/27/2023
DOB NOWMechanical SystemsSigned-offON STAR MANAGEMENT LLC12/22/2023
DOB NOWConstruction FenceSigned-offON STAR MANAGEMENT LLC12/15/2023
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*08/01/2023
DOB NOWConstruction FenceSigned-offUA BUILDERS CORP01/04/2023
DOB NOWConstruction FenceSigned-offUA BUILDERS CORP09/15/2022
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*08/01/2022
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING07/18/2022
DOB NOWConstruction FenceSigned-offUA BUILDERS CORP09/15/2021
DOB NOWConstruction FenceSigned-offUA BUILDERS CORP07/27/2021
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING07/20/2021
DOB NOWConstruction FenceSigned-offUA BUILDERS CORP03/30/2021
DOB NOWConstruction FenceSigned-offUA BUILDERS CORP10/26/2020
DOB NOWConstruction FenceSigned-offUA BUILDERS CORP10/20/2020
DOB NOWConstruction FenceSigned-offUA BUILDERS CORP07/31/2020
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING07/24/2020
BIS—ISSUEDON STAR MANAGEMENT LLC01/16/2024
BIS—ISSUEDON STAR MANAGEMENT LLC12/15/2023
BIS—ISSUEDUA BUILDERS CORP03/03/2023
BIS—ISSUEDUA BUILDERS CORP06/24/2022
BIS—ISSUEDALL STAR 1 LLC06/07/2022
BIS—ISSUEDUA BUILDERS CORP05/05/2022
BISEQISSUEDUA BUILDERS CORP02/08/2022
BIS—ISSUEDALL STAR 1 LLC11/09/2021
BISEQISSUEDUA BUILDERS CORP11/25/2020
BISOTISSUEDUA BUILDERS CORP10/08/2020
8 projects · most recent 11/01/2024
General Wiring
FiledStatusContractorScope
11/01/2024CompleteTFK ELECTRIC CORPGeneral Wiring
11/01/2024CompleteTFK ELECTRIC CORP58 meters, 58 new_meters
02/21/2024CompleteTFK ELECTRIC CORP—
02/05/2024CompletePOWER DIRECT ELECTRIC INC—
01/22/2024CompleteSOLAS ELECTRICAL CORP—
09/04/2023CompleteTFK ELECTRIC CORP—
08/10/2022CompleteNASH ELECTRIC SERVICES IN—
07/09/2020CompleteV. VASS ELECTRIC CORP—
1 project · most recent 02/08/2018
Fence
FiledStatusContractorScope
02/08/2018——Fence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/20/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/28/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/24/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/14/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
03/08/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/18/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/18/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
03/18/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/18/2024Sprinkler SystemsFAHAD FATEHspecial
01/26/2024Maintenance informationFAHAD FATEHenergy_progress
01/26/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
01/26/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
01/26/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/26/2024Mechanical SystemsFAHAD FATEHspecial
01/26/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/26/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
01/26/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
01/26/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
01/26/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
01/26/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
01/26/2024Maintenance informationFAHAD FATEHenergy_progress
01/26/2024Heating SystemsFAHAD FATEHspecial
01/26/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
01/26/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/26/2024FinalFAHAD FATEHprogress
01/26/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
01/26/2024Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
01/26/2024Shutoff dampersFAHAD FATEHenergy_progress
01/21/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
01/21/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/21/2024Sprinkler SystemsFAHAD FATEHspecial
01/21/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
Latest 25 of 49.
▾Documents — 377 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch13
08/26/2026X00013408-I1Request digital key ↗
08/24/2026X00773177-P1Request digital key ↗
08/24/2026X00773177-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026X00372688-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00372813-I1Request digital key ↗
▸Applications & Permits99
▸BISPLAN / WORK APPROVAL APPLICATION84
08/27/2024220631341Open ↗
08/27/2024220631341Open ↗
12/29/2023220632439Open ↗
Showing 3 of 84 on file for this type
▸BISWORK PERMIT APPLICATION12
01/16/2024220631341Open ↗
12/27/2023220631341Open ↗
12/22/2023220631341Open ↗
Showing 3 of 12 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
12/28/2023240277918Open ↗
Showing 1 of 3 on file for this type
▸Zoning, Tax Lot & Property Records9
▸BISZONING DIAGRAM4
11/29/2023220631341Open ↗
08/19/2021220631341Open ↗
Showing 2 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
11/10/2021220730671Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
11/29/2023220631341Open ↗
▸BISVERIFY TAX LOT1
06/21/2024220631341Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
11/10/2021220730671Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/21/2024220631341Open ↗
▸Seals & Professional Certifications51
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/26/2026X00399229-I1Open ↗
08/26/2026X00372813-I1Open ↗
08/24/2026X00773177-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/29/2026X00947589-P1Open ↗
09/01/2026X00773177-P1Open ↗
09/01/2026X00773177-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/29/2026X00947589-P1Open ↗
09/29/2026X00947589-P1Open ↗
08/26/2026X00947587-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
12/22/2023220631341Open ↗
11/10/2021220730671Open ↗
Showing 2 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRIC CUT-OFF1
11/10/2021220730671Open ↗
▸BISSTANDPIPE WORK PERMIT1
04/26/2022220631341Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
11/28/2023220631341Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
05/21/2024220631341Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
05/21/2024220631341Open ↗
▸Safety & Tenant Protection13
▸BISSTREET TREE CHECKLIST7
12/28/2023240277918Open ↗
11/28/2023220631341Open ↗
Showing 2 of 7 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
02/25/2021240297745Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/22/2023220631341Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
11/10/2021220730671Open ↗
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTenant Protection Plan and Notes1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/10/2021220730671Open ↗
Showing 1 of 2 on file for this type
▸BISRODENT CONTROL1
11/10/2021220730671Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY13
06/23/2024220631341Open ↗
06/23/2024220631341Open ↗
11/28/2023220631341Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/22/2023220631341Open ↗
05/06/2022220631341Open ↗
Showing 2 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
06/21/2024220631341Open ↗
03/03/2021240288979Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00947587-I1Open ↗
08/13/2026X00947589-I1Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
11/25/2024220631341Open ↗
▸Inspections & Test Reports34
▸BISTECHNICAL REPORT: RESPONSIBILITY22
06/23/2024220631341Open ↗
06/23/2024220631341Open ↗
12/13/2023220631341Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
12/27/2023220631341Open ↗
12/27/2023220631341Open ↗
12/22/2023220631341Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION3
11/20/2023220631341Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
12/22/2023220631341Open ↗
05/06/2022220631341Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
04/25/2022220631341Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
06/21/2024220631341Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBORINGS / TEST PITS (TR-4) 27-7201
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs46
▸BISSCHEDULE A - OCCUPANCY / USE21
11/24/2023220631341Open ↗
11/01/2023220631341Open ↗
10/27/2023220631341Open ↗
Showing 3 of 21 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION17
12/28/2023240277918Open ↗
11/28/2023220631341Open ↗
11/28/2023220631341Open ↗
Showing 3 of 17 on file for this type
▸BISSUPERSEDING LETTER4
12/22/2023220631341Open ↗
12/22/2023220631341Open ↗
03/06/2023220631341Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
12/18/2023240278551Open ↗
12/01/2023240278551Open ↗
03/03/2021240288979Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
11/10/2021220730671Open ↗
▸Cost, Insurance & Ownership9
▸BISPROJECT-SPECIFIC GL INSURANCE5
12/22/2023220631341Open ↗
07/06/2022220631341Open ↗
06/09/2022220730671Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/03/2021240288979Open ↗
▸Filing & Intake Forms52
▸BISADDITIONAL INFORMATION30
01/26/2024220631341Open ↗
12/28/2023240277918Open ↗
12/28/2023240277918Open ↗
Showing 3 of 30 on file for this type
▸BISEFILING COVER SHEET8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISBOROUGH INTAKE FORM7
03/06/2023220631341Open ↗
03/06/2023220631341Open ↗
07/06/2022220631341Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
12/28/2023240277918Open ↗
Showing 1 of 2 on file for this type
▸Other Documents6
▸BISPLOT DIAGRAM2
11/29/2023220631341Open ↗
Showing 1 of 2 on file for this type
▸BISSITE SURVEY: FINAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCOMMUNITY BOARD NOTIFICATION1
11/10/2021220730671Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/02/2022220631341Open ↗
▸BISSITE CONNECTION:DEP1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type