← Back
BRONX
3167A AMPERE AVENUE
BRONX · BIN 2130870
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
Floor 2Under Construction6p · 1 filing · 20 docs
Floor 1Under Construction6p · 1 filing · 20 docs
CellarUnder Construction9p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2955 RANDALL AVENUE4009/22/2026
CIBOR CONSTRUCTION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS408/10/2026
FABIAN CRUZ PE PLLC307/22/2026
RAS PE CONSULTING ENGINEERS310/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CIBOR CONSTRUCTION INCGeneral Contractor1707/10/2026
J&M PLBG OF WESTCHESTER IFire Protection207/08/2026
J&M PLUMBING OF WESTCHESTERPlumbing207/08/2026
NEW CENTURY ELEC'L CONTRElectrical103/22/2026
ROY B PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.3171008/10/2026
Building Lifecycle
All (97)Filed (10)Permit Issued (16)Signed Off (6)Inspection (10)Objection (32)Special Inspection (23)
08/10/2026
Filed — New Building
Herewith filed for a new 8'-0" curbcut with 1'-6" splays distance 75' to the corner filed in conjunction with New Building application X00888817-I1
X00888817-P1
08/06/2026
Signed off — Alteration
INSTALLATION OF MECHANICAL SYSTEM FOR A 2 STORY 1 FAMILY RESIDENTIAL BUILDING IN CONJUNCTION WITH X00888817-I1.
X01021085-I1
08/06/2026
Special inspection requirement — Permanent certificate
MAXIM KORNGOLD
08/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MAXIM KORNGOLD
08/06/2026
Special inspection requirement — Electric vehicle service equipment requirements
MAXIM KORNGOLD
08/06/2026
Special inspection requirement — Air barrier — testing
MAXIM KORNGOLD
08/06/2026
Special inspection requirement — Interior lighting power
MAXIM KORNGOLD
08/06/2026
Special inspection requirement — Fenestration areas
MAXIM KORNGOLD
08/06/2026
Special inspection requirement — Air barrier - visual inspection
MAXIM KORNGOLD
08/06/2026
Special inspection requirement — Fenestration air leakage
MAXIM KORNGOLD
08/06/2026
Special inspection requirement — Maintenance information
MAXIM KORNGOLD
08/06/2026
Special inspection requirement — Subgrade Inspections
MAXIM KORNGOLD
08/06/2026
Special inspection requirement — Concrete - Cast-In-Place
MAXIM KORNGOLD
08/06/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MAXIM KORNGOLD
08/06/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
MAXIM KORNGOLD
08/06/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MIKHAIL ZEYGMAN
08/06/2026
Special inspection requirement — Insulation placement and R values
MAXIM KORNGOLD
07/23/2026
Special inspection requirement — Final
MAXIM KORNGOLD
07/23/2026
Special inspection requirement — Mechanical Systems
MAXIM KORNGOLD
07/22/2026
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEM FOR A 2 STORY 1 FAMILY RESIDENTIAL BUILDING IN CONJUNCTION WITH X00888817-I1.
X01021085-P1
07/20/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/17/2026
Special inspection requirement — Final
Maxim Korngold
07/17/2026
Special inspection requirement — Mechanical Systems
Maxim Korngold
07/13/2026
Signed off — New Building
Herewith filed for a new 8'-0" curbcut with 1'-6" splays distance 75' to the corner filed in conjunction with New Building application X00888817-I1
X00888817-S1
07/10/2026
Signed off — New Building
Herewith filed for a new 8'-0" curbcut with 1'-6" splays distance 75' to the corner filed in conjunction with New Building application X00888817-I1
X00888817-S2
07/08/2026
Permit issued — Mechanical Systems
X01021085-I1-MS
07/06/2026
Permit issued — Sprinklers
X01021045-I1-PL
07/01/2026
Signed off — New Building
Herewith filed for a new 8'-0" curbcut with 1'-6" splays distance 75' to the corner filed in conjunction with New Building application X00888817-I1
X00888817-S3
05/29/2026
Signed off — New Building
Herewith filed for a new 8'-0" curbcut with 1'-6" splays distance 75' to the corner filed in conjunction with New Building application X00888817-I1
X00888817-S4
05/26/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/19/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/14/2026
Signed off — New Building
Herewith filed for a new 8'-0" curbcut with 1'-6" splays distance 75' to the corner filed in conjunction with New Building application X00888817-I1
X00888817-S5
04/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/13/2026
Permit issued — Curb Cut
X00888817-S4-CC
03/03/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/18/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
02/11/2026
Permit issued — Sprinklers
X01021045-I1-PL
02/11/2026
Permit issued — Plumbing
X01021045-I1-EW-SP
11/06/2025
Permit issued — General Construction
X00888817-I1-GC
11/05/2025
Permit issued — Construction Fence
X00888817-S5-FN
10/30/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/21/2024
Permit issued — General Construction
X00888817-I1-GC
10/21/2024
Permit issued — Construction Fence
X00888817-S5-FN
08/01/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/25/2024
Permit issued — Plumbing
X01021045-I1-EW-SP
07/22/2024
Permit issued — Plumbing
X01021045-I1-PL
04/19/2024
Permit issued — Foundation
X00888817-S2-FO-EA
04/12/2024
Permit issued — Support of Excavation
X00888817-S1-SE
03/21/2024
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEM FOR A 2 STORY 1 FAMILY RESIDENTIAL BUILDING IN CONJUNCTION WITH X00888817-I1.
X01021085-I1
03/21/2024
Filed — Alteration
X01021045-I1
03/21/2024
Permit issued — General Construction
X00888817-I1-GC
03/21/2024
Permit issued — Construction Fence
X00888817-S5-FN
03/21/2024
Permit issued — Structural
X00888817-S3-ST
03/15/2024
Special inspection requirement — Sprinkler Systems
MAXIM KORNGOLD
03/01/2024
Filed — New Building
Herewith filed for a new 8'-0" curbcut with 1'-6" splays distance 75' to the corner filed in conjunction with New Building application X00888817-I1
X00888817-S5
02/28/2024
Objection resolved — Addressed
02/23/2024
Objection raised — C/O of existing property requi
02/15/2024
Objection resolved — Addressed
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCIBOR CONSTRUCTION INC07/08/2026
DOB NOWSprinklersSigned-offROY B PLUMBING & HEATING07/06/2026
DOB NOWCurb CutSigned-offCIBOR CONSTRUCTION INC03/13/2026
DOB NOWSprinklersSigned-offJ&M PLUMBING OF WESTCHEST02/11/2026
DOB NOWPlumbingSigned-offJ&M PLBG OF WESTCHESTER I02/11/2026
DOB NOWGeneral ConstructionPermit IssuedCIBOR CONSTRUCTION INC11/06/2025
DOB NOWConstruction FencePermit IssuedCIBOR CONSTRUCTION INC11/05/2025
DOB NOWGeneral ConstructionPermit IssuedCIBOR CONSTRUCTION INC10/21/2024
DOB NOWConstruction FenceSigned-offCIBOR CONSTRUCTION INC10/21/2024
DOB NOWPlumbingSigned-offJ&M PLBG OF WESTCHESTER I07/25/2024
DOB NOWPlumbingSigned-offJ&M PLUMBING OF WESTCHEST07/22/2024
DOB NOWFoundationSigned-offCIBOR CONSTRUCTION INC04/19/2024
DOB NOWSupport of ExcavationSigned-offCIBOR CONSTRUCTION INC04/12/2024
DOB NOWGeneral ConstructionPermit IssuedCIBOR CONSTRUCTION INC03/21/2024
DOB NOWConstruction FenceSigned-offCIBOR CONSTRUCTION INC03/21/2024
DOB NOWStructuralSigned-offCIBOR CONSTRUCTION INC03/21/2024
1 project · most recent 07/22/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/22/2026Signed-offCIBOR CONSTRUCTION INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ARUM036GSS5 42,000 BTU · Vrf Outdoor ×1
ARUN024GSS4 27,000 BTU · Vrf Outdoor ×1
Ventilation
Broan 696 50 CFM · Exhaust Fan ×2
1 project · most recent 06/18/2024
General Wiring
FiledStatusContractorScope
06/18/2024CompleteNEW CENTURY ELEC'L CONTRGeneral Wiring
1 project · most recent 08/10/2026
Steel Wood
FiledStatusContractorScope
08/10/2026Signed-offCIBOR CONSTRUCTION INCSteel, Wood
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/20/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/26/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/19/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
04/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/03/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/18/2026Pass-Final PL - UndergroundPassView ↗
10/30/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/16/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
08/06/2026Permanent certificateMAXIM KORNGOLDenergy_progress
08/06/2026Fenestration and door U-factor and product ratingsMAXIM KORNGOLDenergy_progress
08/06/2026Electric vehicle service equipment requirementsMAXIM KORNGOLDenergy_progress
08/06/2026Air barrier — testing MAXIM KORNGOLDenergy_progress
08/06/2026Interior lighting powerMAXIM KORNGOLDenergy_progress
08/06/2026Fenestration areasMAXIM KORNGOLDenergy_progress
08/06/2026Air barrier - visual inspectionMAXIM KORNGOLDenergy_progress
08/06/2026Fenestration air leakageMAXIM KORNGOLDenergy_progress
08/06/2026Maintenance informationMAXIM KORNGOLDenergy_progress
08/06/2026Subgrade InspectionsMAXIM KORNGOLDspecial
08/06/2026Concrete - Cast-In-PlaceMAXIM KORNGOLDspecial
08/06/2026Excavations - Sheeting, Shoring, and BracingMAXIM KORNGOLDspecial
08/06/2026Exterior Insulation and Finish Systems (EIFS)MAXIM KORNGOLDspecial
08/06/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMIKHAIL ZEYGMANspecial
08/06/2026Insulation placement and R valuesMAXIM KORNGOLDenergy_progress
07/23/2026FinalMAXIM KORNGOLDprogress
07/23/2026Mechanical SystemsMAXIM KORNGOLDspecial
07/17/2026FinalMaxim Korngoldprogress
07/17/2026Mechanical SystemsMaxim Korngoldspecial
03/15/2024Sprinkler SystemsMAXIM KORNGOLDspecial
08/15/2023Excavations - Sheeting, Shoring, and BracingMAXIM KORNGOLDspecial
08/15/2023Subgrade InspectionsMAXIM KORNGOLDspecial
08/15/2023Subsurface Investigations (Borings/Test Pits)SAMER ABOU-GHAIDAspecial
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/22/2026X00888817-P1Request digital key ↗
08/22/2026X00888817-S5Request digital key ↗
08/22/2026X00888817-S4Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/22/2026X00888817-P1Open ↗
08/13/2026X00888817-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00888817-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/22/2026X00888817-S3Open ↗
08/22/2026X00888817-P1Open ↗
08/22/2026X00888817-S5Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/19/2026X01021085-P1Open ↗
09/02/2026X00888817-P1Open ↗
09/02/2026X00888817-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/19/2026X01021085-P1Open ↗
09/02/2026X00888817-P1Open ↗
08/31/2026X01021085-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026X00888817-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/22/2026X00888817-P1Open ↗
08/13/2026X00888817-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00888817-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00888817-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00888817-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026X00888817-S1Open ↗
08/13/2026X00888817-S2Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026X00888817-S1Open ↗
08/13/2026X00888817-S2Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026X00888817-S1Open ↗
08/13/2026X00888817-S2Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial2
08/22/2026X00888817-P1Open ↗
08/13/2026X00888817-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/22/2026X00888817-P1Open ↗
08/22/2026X00888817-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/22/2026X00888817-P1Open ↗
08/13/2026X00888817-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026X00888817-S2Open ↗
08/13/2026X00888817-S1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00888817-I1Open ↗