← Back
Three families
317 56 STREET
BROOKLYN · BIN 3014932
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R6BZoning
3,048 sfGross Floor Area
3Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Three families · Owner of record: GREAT RIVER REALTY LLC · 2,003 sf lot · 1.52 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanical
Floor 33p · 1 filing · 13 docs
Floor 21p · 1 filing · 13 docs
Floor 1
Cellar5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GREAT RIVER REALTY LLC203/22/2026
OWNER OF 317 56TH STREET203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/16/2021$1.4M—— → —$454/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KL INNOVATIVE DESIGN INC503/24/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor107/08/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KL INNOVATIVE DESIGN INC7225503/24/2022
Building Lifecycle
All (69)Filed (5)Permit Issued (2)Signed Off (2)Violation (26)Inspection (5)Special Inspection (29)
05/01/2026
Violation issued (HPD, closed)
A
06/06/2025
Violation issued (HPD, closed)
A
04/08/2024
Violation issued (HPD, closed)
A
03/20/2023
Violation issued (HPD, closed)
A
11/10/2022
Violation issued (HPD, closed)
I
04/19/2022
Signed off — Alteration
INTERIOR RENOVATION OF CELLAR, 1ST, 2ND AND 3RD FLOOR OF EXISTING 3 STORY BUILDING. PARTITION, FLOORING AND PAINTING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00610415-I1
04/18/2022
Signed off — Alteration
INSTALL 2 NEW BOILERS, 2 NEW H.W.H., NEW GAS & PLUMBING FIXTURES, AND REMOVE & CAP OF EXISTING FIXTURES IN THE EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00610446-I1
03/30/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/24/2022
Filed — Alteration
INSTALL 2 NEW BOILERS, 2 NEW H.W.H., NEW GAS & PLUMBING FIXTURES, AND REMOVE & CAP OF EXISTING FIXTURES IN THE EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00610446-P2
03/24/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
HO YIN LAW
03/24/2022
Special inspection requirement — Energy Code Compliance Inspections
HO YIN LAW
03/24/2022
Special inspection requirement — HVAC-R and service water heating equipment
HO YIN LAW
03/24/2022
Special inspection requirement — HVAC-R and service water heating system controls
HO YIN LAW
03/24/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
HO YIN LAW
03/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
HO YIN LAW
03/24/2022
Special inspection requirement — Energy Code Compliance Inspections
HO YIN LAW
03/24/2022
Special inspection requirement — HVAC-R and service water heating equipment
HO YIN LAW
03/24/2022
Special inspection requirement — HVAC-R and service water heating system controls
HO YIN LAW
03/24/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
HO YIN LAW
02/22/2022
Violation issued (HPD, closed)
A
02/22/2022
Violation issued (HPD, closed)
I
01/26/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/26/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/26/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/12/2022
Filed — Alteration
INTERIOR RENOVATION OF CELLAR, 1ST, 2ND AND 3RD FLOOR OF EXISTING 3 STORY BUILDING. PARTITION, FLOORING AND PAINTING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00610415-P1
01/12/2022
Filed — Alteration
INSTALL 2 NEW BOILERS, 2 NEW H.W.H., NEW GAS & PLUMBING FIXTURES, AND REMOVE & CAP OF EXISTING FIXTURES IN THE EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00610446-P1
01/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
HO YIN LAW
01/12/2022
Special inspection requirement — Fire-Resistance Rated Construction
HO YIN LAW
01/12/2022
Special inspection requirement — Energy Code Compliance Inspections
HO YIN LAW
01/12/2022
Special inspection requirement — Final
HO YIN LAW
01/12/2022
Special inspection requirement — Metering
HO YIN LAW
01/12/2022
Special inspection requirement — Insulation placement and R values
HO YIN LAW
01/12/2022
Special inspection requirement — Interior lighting power
HO YIN LAW
01/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
HO YIN LAW
01/11/2022
Special inspection requirement — Energy Code Compliance Inspections
HO YIN LAW
01/11/2022
Special inspection requirement — Final
HO YIN LAW
01/11/2022
Special inspection requirement — Fire-Resistance Rated Construction
HO YIN LAW
01/11/2022
Special inspection requirement — Metering
HO YIN LAW
01/11/2022
Special inspection requirement — Interior lighting power
HO YIN LAW
01/11/2022
Special inspection requirement — Insulation placement and R values
HO YIN LAW
01/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
HO YIN LAW
01/10/2022
Special inspection requirement — Energy Code Compliance Inspections
HO YIN LAW
01/10/2022
Special inspection requirement — HVAC-R and service water heating system controls
HO YIN LAW
01/10/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
HO YIN LAW
01/10/2022
Special inspection requirement — HVAC-R and service water heating equipment
HO YIN LAW
10/14/2021
Permit issued — General Construction
B00610415-I1-GC
10/13/2021
Permit issued — Plumbing
B00610446-I1-PL
10/12/2021
Filed — Alteration
INTERIOR RENOVATION OF CELLAR, 1ST, 2ND AND 3RD FLOOR OF EXISTING 3 STORY BUILDING. PARTITION, FLOORING AND PAINTING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00610415-I1
10/12/2021
Filed — Alteration
INSTALL 2 NEW BOILERS, 2 NEW H.W.H., NEW GAS & PLUMBING FIXTURES, AND REMOVE & CAP OF EXISTING FIXTURES IN THE EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00610446-I1
04/06/2021
Violation issued (HPD, closed)
I
04/06/2021
Violation issued (HPD, closed)
A
10/29/2019
Violation issued (HPD, closed)
I
05/12/2019
Violation issued (HPD, open)
B
10/15/2018
Violation issued (HPD, closed)
I
11/16/2017
Violation issued (HPD, closed)
I
11/02/2016
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
07/05/2015
Violation issued (HPD, open)
B
07/05/2015
Violation issued (HPD, open)
B
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY10/14/2021
DOB NOWPlumbingSigned-offT & T PLUMBING INC10/13/2021
BISPLISSUED24 SEVEN PLUMBING INC03/16/2021
BISOTISSUEDOWNER08/11/2009
BISOTISSUEDSCAMPA CONTRACTING, CORP04/10/2006
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/30/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/24/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/26/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/26/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/26/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
03/24/2022Fire-Resistant Penetrations and JointsHO YIN LAWspecial
03/24/2022Energy Code Compliance InspectionsHO YIN LAWprogress
03/24/2022HVAC-R and service water heating equipmentHO YIN LAWenergy_progress
03/24/2022HVAC-R and service water heating system controlsHO YIN LAWenergy_progress
03/24/2022HVAC-R and service water piping design and insulationHO YIN LAWenergy_progress
03/24/2022Fire-Resistant Penetrations and JointsHO YIN LAWspecial
03/24/2022Energy Code Compliance InspectionsHO YIN LAWprogress
03/24/2022HVAC-R and service water heating equipmentHO YIN LAWenergy_progress
03/24/2022HVAC-R and service water heating system controlsHO YIN LAWenergy_progress
03/24/2022HVAC-R and service water piping design and insulationHO YIN LAWenergy_progress
01/12/2022Fire-Resistant Penetrations and JointsHO YIN LAWspecial
01/12/2022Fire-Resistance Rated ConstructionHO YIN LAWprogress
01/12/2022Energy Code Compliance InspectionsHO YIN LAWprogress
01/12/2022FinalHO YIN LAWprogress
01/12/2022MeteringHO YIN LAWenergy_progress
01/12/2022Insulation placement and R valuesHO YIN LAWenergy_progress
01/12/2022Interior lighting powerHO YIN LAWenergy_progress
01/11/2022Fire-Resistant Penetrations and JointsHO YIN LAWspecial
01/11/2022Energy Code Compliance InspectionsHO YIN LAWprogress
01/11/2022FinalHO YIN LAWprogress
01/11/2022Fire-Resistance Rated ConstructionHO YIN LAWprogress
01/11/2022MeteringHO YIN LAWenergy_progress
01/11/2022Interior lighting powerHO YIN LAWenergy_progress
01/11/2022Insulation placement and R valuesHO YIN LAWenergy_progress
01/10/2022Fire-Resistant Penetrations and JointsHO YIN LAWspecial
Latest 25 of 29.
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00610415-P1Request digital key ↗
09/01/2026B00610415-I1Request digital key ↗
08/30/2026B00610446-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION3
03/16/2021320013551Open ↗
08/11/2009320013551Open ↗
08/11/2009320013551Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
04/23/2009320013551Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature10
09/13/2026B00610446-I1Open ↗
09/13/2026B00610446-I1Open ↗
09/02/2026B00610446-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00610415-P1Open ↗
09/01/2026B00610415-I1Open ↗
08/30/2026B00610446-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/13/2026B00610446-I1Open ↗
09/02/2026B00610446-P2Open ↗
08/28/2026B00610415-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/23/2009320013551Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/23/2009320013551Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
04/23/2009320013551Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
04/23/2009320013551Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00610415-I1Open ↗
09/01/2026B00610415-P1Open ↗
08/30/2026B00610446-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/23/2009320013551Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/30/2026B00610446-I1Open ↗
08/13/2026B00610415-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
04/23/2009320013551Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/23/2009320013551Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
03/16/2021320013551Open ↗
08/11/2009320013551Open ↗
08/11/2009320013551Open ↗
▸BISEFILING COVER SHEET1
04/23/2009320013551Open ↗