← Back
Elevator apt, semi-fireproof without stores
Dona Rosita I
317 EAST 148 STREET · Melrose · BIN 2000907
💬 Discuss this project
1910Year Built
4Stories
D1Building Class
C4-4Zoning
17,000 sfGross Floor Area
40Units
Rent Stabilized27 Open Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: H.I.R.E. HOUSING DEVELOPMENT FUND CORPOR ATION · 5,325 sf lot · 3.19 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 10 docs
Bulkhead1p · 1 filing · 10 docs
Basement1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COMUNILIFE2707/08/2026
PLATINUM SERVICES NY407/08/2026
OWNER OF 315-317 E 148 ST103/22/2026
HIRE103/22/2026
ADANIS CONSTRUCTION CO103/22/2026
PERIMETER BRIDGE CO INC103/21/2026
H I R E HDFC803/21/2026
ROSITA ASSOCIATES LIMITED PARTNE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LMDARCHITECT, PC.210/18/2023
ASHRAF CORP106/23/2023
BENDIX ENGINEERING, P.C.103/31/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO203/21/2026
DOMANI CONSULTING103/21/2026
PROFESSIONAL SOLUTIONS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AVANTE CONTRACTING CORPGeneral Contractor1007/08/2026
ANTHONY LUCIANOElectrical103/21/2026
IRVING BAPTISTEElectrical103/21/2026
MELVYN ZWEBNERElectrical103/21/2026
VAN VASSELLElectrical103/21/2026
PLATINUM SERVICES NY LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BENDIX ENGINEERING, P.C.4293103/31/2023
SOCOTEC ENGINEERING4983203/31/2023
Building Lifecycle
All (90)Filed (4)Permit Issued (9)Signed Off (3)Violation (60)Objection (4)Special Inspection (10)
04/30/2026
Violation issued (HPD, open)
A
10/17/2025
Violation issued (HPD, open)
C
05/08/2024
Violation issued (HPD, closed)
B
05/08/2024
Violation issued (HPD, closed)
A
05/08/2024
Violation issued (HPD, open)
C
02/23/2024
Signed off — Alteration
Installation of HVAC equipment in the public basement space. No change to use, egress or occupancy
X00839766-I1
02/20/2024
Signed off — Alteration
PROPOSED PARAPET WALL INTERIOR AND EXTERIOR RESURFACING WITH STUCCO, WORK TO INCLUDE STUCCO RESURFACING OF STAIR AND ELEVATOR EXTERIOR BULKHEADS, ADDITIONALLY 275 LINEAR FEET OF ALUMINUM COPING TO BE REPLACED AS PER PLANS.
X00848508-I1
02/13/2024
Permit issued — Mechanical Systems
X00839766-I1-MS
02/12/2024
Permit issued — General Construction
X00848508-I1-GC
10/20/2023
Objection resolved — Addressed
10/20/2023
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
10/20/2023
Special inspection requirement — Final
LUIS DEPASQUALE
10/18/2023
Filed — Alteration
PROPOSED PARAPET WALL INTERIOR AND EXTERIOR RESURFACING WITH STUCCO, WORK TO INCLUDE STUCCO RESURFACING OF STAIR AND ELEVATOR EXTERIOR BULKHEADS, ADDITIONALLY 275 LINEAR FEET OF ALUMINUM COPING TO BE REPLACED AS PER PLANS.
X00848508-P1
10/18/2023
Objection raised — Other
10/11/2023
Violation issued (HPD, closed)
C
10/06/2023
Violation issued (HPD, open)
C
10/06/2023
Violation issued (HPD, open)
C
10/04/2023
Signed off — Alteration
X00881249-I1
10/04/2023
Violation issued (HPD, closed)
C
10/04/2023
Violation issued (HPD, closed)
A
10/04/2023
Violation issued (HPD, closed)
A
08/10/2023
Permit issued — Mechanical Systems
X00839766-I1-MS
08/09/2023
Permit issued — General Construction
X00848508-I1-GC
06/29/2023
Permit issued — Sidewalk Shed
X00881249-I1-SH
06/23/2023
Filed — Alteration
X00881249-I1
05/30/2023
Permit issued — General Construction
X00848508-I1-GC
05/30/2023
Permit issued — Mechanical Systems
X00839766-I1-MS
05/16/2023
Permit issued — Mechanical Systems
X00839766-I1-MS
05/16/2023
Permit issued — General Construction
X00848508-I1-GC
04/07/2023
Objection raised — Other
04/07/2023
Objection resolved — Addressed
03/31/2023
Filed — Alteration
Installation of HVAC equipment in the public basement space. No change to use, egress or occupancy
X00839766-I1
03/31/2023
Filed — Alteration
PROPOSED PARAPET WALL INTERIOR AND EXTERIOR RESURFACING WITH STUCCO, WORK TO INCLUDE STUCCO RESURFACING OF STAIR AND ELEVATOR EXTERIOR BULKHEADS, ADDITIONALLY 275 LINEAR FEET OF ALUMINUM COPING TO BE REPLACED AS PER PLANS.
X00848508-I1
03/06/2023
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
03/06/2023
Special inspection requirement — Final
Matthew Bendix
03/06/2023
Special inspection requirement — Maintenance information
Matthew Bendix
03/06/2023
Special inspection requirement — Mechanical Systems
Matthew Bendix
03/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Matthew Bendix
03/06/2023
Special inspection requirement — HVAC-R and service water heating system controls
Matthew Bendix
03/06/2023
Special inspection requirement — HVAC-R and service water heating equipment
Matthew Bendix
03/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Bendix
11/15/2022
Violation issued (HPD, closed)
I
11/03/2022
Violation issued (HPD, closed)
I
10/31/2022
Violation issued (HPD, closed)
C
10/31/2022
Violation issued (HPD, closed)
C
10/31/2022
Violation issued (HPD, closed)
C
10/31/2022
Violation issued (HPD, closed)
C
10/31/2022
Violation issued (HPD, closed)
A
10/31/2022
Violation issued (HPD, closed)
B
05/25/2022
Violation issued (HPD, closed)
B
05/25/2022
Violation issued (HPD, open)
C
04/05/2022
Violation issued (HPD, closed)
C
12/23/2021
Violation issued (HPD, open)
C
12/23/2021
Violation issued (HPD, open)
C
12/13/2021
Violation issued (HPD, closed)
B
12/13/2021
Violation issued (HPD, closed)
C
12/13/2021
Violation issued (HPD, closed)
C
12/13/2021
Violation issued (HPD, closed)
B
12/13/2021
Violation issued (HPD, closed)
C
12/13/2021
Violation issued (HPD, closed)
C
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAVANTE CONTRACTING CORP02/13/2024
DOB NOWGeneral ConstructionSigned-offAVANTE CONTRACTING CORP02/12/2024
DOB NOWMechanical SystemsSigned-offAVANTE CONTRACTING CORP08/10/2023
DOB NOWGeneral ConstructionSigned-offAVANTE CONTRACTING CORP08/09/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC06/29/2023
DOB NOWGeneral ConstructionSigned-offAVANTE CONTRACTING CORP05/30/2023
DOB NOWMechanical SystemsSigned-offAVANTE CONTRACTING CORP05/30/2023
DOB NOWMechanical SystemsSigned-offAVANTE CONTRACTING CORP05/16/2023
DOB NOWGeneral ConstructionSigned-offAVANTE CONTRACTING CORP05/16/2023
BISOTISSUEDTWO BROTHERS CONSTRUCTION10/22/2012
BISEQISSUEDROCK SCAFFOLDING CORP04/13/2012
BISOTISSUEDTWO BROTHERS CONSTRUCTION12/15/2011
BISEQISSUEDTWO BROTHERS CONSTRUCTION12/08/2011
BISEQISSUEDTWO BROTHERS CONSTRUCTION05/31/2011
BISPLISSUEDWARD PLUMBING CORP03/28/2011
BISBLISSUEDWARD PLUMBING CORP03/28/2011
BISEQISSUEDPERIMETER BRIDGE & SCAFFO03/02/2011
BISEQISSUEDBILLY CONTRACTORS02/13/2008
BISEQISSUEDBILLY CONTRACTORS02/13/2008
BISSPISSUEDDANICA PLUMBING & HEATING CORP.01/27/1995
BISEQISSUEDADONIS CONSTRUCTION & DEV. CORP11/17/1994
BISEQISSUEDADONIS CONSTRUCTION & DEV. CORP11/17/1994
BISEQISSUEDADONIS CONSTRUCTION & DEV. CORP07/13/1994
BISEQISSUEDADONIS CONSTRUCTION & DEV. CORP07/13/1994
BIS—ISSUEDADONIS CONSTRUCTION & DEV. CORP.07/13/1994
BISEQISSUEDADONIS CONSTRUCTION & DEV. CORP07/13/1994
2 projects · most recent 10/24/2024
General Wiring
FiledStatusContractorScope
10/24/2024Permit IssuedJAM ELECTRICAL CORP—
05/29/2023CompleteILLUMINOUS ELECTRIC CORP.General Wiring
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
10/20/2023Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
10/20/2023FinalLUIS DEPASQUALEprogress
03/06/2023Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
03/06/2023FinalMatthew Bendixprogress
03/06/2023Maintenance informationMatthew Bendixenergy_progress
03/06/2023Mechanical SystemsMatthew Bendixspecial
03/06/2023HVAC-R and service water piping design and insulationMatthew Bendixenergy_progress
03/06/2023HVAC-R and service water heating system controlsMatthew Bendixenergy_progress
03/06/2023HVAC-R and service water heating equipmentMatthew Bendixenergy_progress
03/06/2023Fire-Resistant Penetrations and JointsMatthew Bendixspecial
▾Documents — 109 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026X00839766-I1Request digital key ↗
08/23/2026X00881249-I1Request digital key ↗
08/15/2026X00848508-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits19
▸BISWORK PERMIT APPLICATION11
10/22/2012220146401Open ↗
04/14/2012220118628Open ↗
12/15/2011220146401Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
10/02/2015220481351Open ↗
02/03/2012220121188Open ↗
10/28/2011220146401Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications39
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
10/02/2015220481351Open ↗
01/13/2012220110341Open ↗
10/28/2011220146401Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
10/28/2011220146401Open ↗
05/31/2011220121188Open ↗
05/18/2011220118628Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
10/28/2011220146401Open ↗
05/31/2011220121188Open ↗
05/18/2011220118628Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026X00839766-I1Open ↗
08/23/2026X00881249-I1Open ↗
08/13/2026X00848508-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026X00839766-I1Open ↗
08/29/2026X00839766-I1Open ↗
08/26/2026X00848508-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026X00839766-I1Open ↗
08/29/2026X00839766-I1Open ↗
08/26/2026X00848508-I1Open ↗
▸BISPC FULL REPORT2
02/14/2008210034363Open ↗
02/13/2008210034354Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/19/2011220110341Open ↗
▸BISSCHEDULE B - PLUMBING1
03/29/2011220110341Open ↗
▸Environmental & Asbestos11
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
05/18/2011220118628Open ↗
03/02/2011220106427Open ↗
02/14/2008210034363Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
10/28/2011220146401Open ↗
05/31/2011220121188Open ↗
03/29/2011220110341Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026X00839766-I1Open ↗
08/13/2026X00848508-P1Open ↗
08/13/2026X00848508-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/02/2015220481351Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY3
01/13/2012220110341Open ↗
03/29/2011220110341Open ↗
03/29/2011220110341Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/02/2015220481351Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/13/2012220110341Open ↗
▸Approvals, Objections & Sign-offs15
▸BISADMINISTRATIVE OBJECTIONS7
10/28/2011220146401Open ↗
05/31/2011220121188Open ↗
05/18/2011220118628Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
02/10/2012220110341Open ↗
02/02/2012220110341Open ↗
01/13/2012220110341Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026X00839766-I1Open ↗
08/13/2026X00848508-I1Open ↗
08/13/2026X00848508-P1Open ↗
▸BISSHED LETTER1
04/14/2012220118628Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
10/02/2015220481351Open ↗
02/02/2012220110341Open ↗
01/13/2012220110341Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET6
10/02/2015220481351Open ↗
12/12/2011220110341Open ↗
10/28/2011220146401Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION2
02/03/2012220121188Open ↗
10/19/2011220110341Open ↗
▸Other Documents1
▸DOB NOWDHCR Document1
08/13/2026X00839766-I1Open ↗