← Back
BuildNYC
Two family frame
317 TURNEUR AVENUE
BRONX · Castle Hill-Unionport · BIN 2102225
💬 Discuss this project
2000Year Built
2Stories
B2Building Class
R3-2Zoning
1,902 sfGross Floor Area
2Units
Two family frame · 2,519 sf lot · 0.76 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSolar panel installation on existing3p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Unisolar105/07/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Berger Quality Electrical ConElectrical103/22/2026
Centurion Solar EnergyGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Centurion Solar Energy9475105/07/2025
Building Lifecycle
08/18/2025
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
X01222450-I1
06/25/2025
Permit issued — Solar
X01222450-I1-SL
06/16/2025
Objection resolved — Addressed
05/30/2025
Objection resolved — Addressed
05/22/2025
Objection raised — Scope
12 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offCenturion Solar Energy06/25/2025
BISOTISSUEDPro Custom Solar05/31/2023
BIS—ISSUEDBeechwood RB12/11/2000
BISPLISSUEDL & S Mechanical06/30/2000
BISPLISSUEDL & S Mechanical06/29/2000
BIS—ISSUEDBeechwood RB06/15/2000
BIS—ISSUEDBeechwood RB04/27/2000
2 projects · most recent 04/29/2025
General Wiring
FiledStatusContractorScope
04/29/2025CompleteVillage Electl ContractorsGeneral Wiring
04/08/2025CompleteBerger Quality Electrical Con—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/07/2025Fire-Resistant Penetrations and JointsAndres Arias Londonospecial
05/07/2025Structural Stability – Alterations of existing buildingsAndres Arias Londonospecial
05/07/2025Energy Code Compliance InspectionsAndres Arias Londonoprogress
05/07/2025FinalAndres Arias Londonoprogress
05/07/2025Air barrier - visual inspectionAndres Arias Londonoenergy_progress