1903Year Built
7Stories
R4Building Class
R8Zoning
27,318 sfGross Floor Area
30Units
LL97 CoveredRent Stabilized13 Open Violations 12 unresolved · 1 paperwork only ▸FISP: SWARMPFDNY Report ↗
Condo, residential unit in elevator building · Owner of record: HUDSON COURT CONDO · 6,294 sf lot · 4.34 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingEquipmentGeneral
Roof13p · 2 filings · 11 docs
Floor 711p · 1 filing · 8 docs
Floor 613p · 2 filings · 14 docs
Floor 511p · 1 filing · 8 docs
Floor 411p · 1 filing · 8 docs
Floor 311p · 1 filing · 8 docs
Floor 211p · 1 filing · 8 docs
Floor 113p · 2 filings · 14 docs
Cellar4p · 1 filing · 8 docs
Sub-Basement11p · 2 filings · 15 docs
Site & exterior4p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HUDSON COURT CONDOMINIUM1004/09/2026
UNIVERSAL SYSTEMS INC.703/22/2026
PILON REALTY303/21/2026
PLON REALTY203/21/2026
C O INTELLIGENT MANAGEMENT203/21/2026
INTELLIGENT MANAGEMENT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EUROCELT EXPEDITING, INC403/21/2026
NEW YORK ENGINEERING ASSOCIATES P603/21/2026
HIERARCH-E203/21/2026
JULIAN A. GOMEZ203/21/2026
J A EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MANHATTAN PROFESSIONALGeneral Contractor303/21/2026
UNIVERSAL SYSTEMS INCGeneral Contractor303/21/2026
WARD PLUMBING CORPPlumbing207/08/2026
PETER MICELI PLUMBINGPlumbing203/22/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor104/09/2026
GREGORY PAPANTONIOUElectrical103/21/2026
ABANNO WATERPROOFING INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616108/05/2025
RAND ENGINEERING & ARCHIT266108/05/2025
A2 ARCHITECT, PC2504103/11/2025
NEW YORK ENGINEERING ASSO851107/01/2021
Building Lifecycle
All (115)Filed (9)Permit Issued (7)Signed Off (6)Facade (FISP) (13)Violation (60)Inspection (3)Special Inspection (17)
01/21/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01270762-I1
11/24/2025
Signed off — Alteration
SUSPENDED SCAFFOLD INSTALLATION FOR FACADE REPAIRS AND INSPECTIONS
M01264633-I1
09/03/2025
Permit issued — General Construction
M01097453-I1-GC
08/15/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01270762-I1
08/15/2025
Permit issued — Sidewalk Shed
M01270762-I1-SH
08/08/2025
Permit issued — Suspended Scaffold
M01264633-I1-SC
08/06/2025
Filed — Alteration
SUSPENDED SCAFFOLD INSTALLATION FOR FACADE REPAIRS AND INSPECTIONS
M01264633-I1
08/05/2025
Filed — Alteration
9th Cycle Facade Repairs. No changes to use, egress, or occupancy.
M01097453-I1
08/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Michael Larkin
07/11/2025
Signed off — Alteration
MINOR INTERIOR RENOVATION OF APARTMENT 6F ON THE 6TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01191906-I1
06/04/2025
Violation issued (HPD, closed)
A
04/24/2025
Special inspection requirement — Air barrier - visual inspection
Michael Larkin
03/25/2025
Permit issued — General Construction
M01191906-I1-GC
03/11/2025
Filed — Alteration
MINOR INTERIOR RENOVATION OF APARTMENT 6F ON THE 6TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01191906-I1
03/07/2025
Special inspection requirement — Lighting in dwelling units
Ann Macklin
03/07/2025
Special inspection requirement — Masonry
John Monroe
03/07/2025
Special inspection requirement — Post-installed Anchors
John Monroe
03/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Monroe
03/07/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
John Monroe
03/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
03/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Ann Macklin
03/07/2025
Special inspection requirement — Final
Ann Macklin
09/25/2024
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00379657-I1
08/16/2024
Special inspection requirement — Final
Michael Larkin
08/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
SHAHRIAR QUAYYUM
05/31/2024
Violation issued (HPD, closed)
B
05/31/2024
Violation issued (HPD, closed)
C
04/01/2024
Violation issued (HPD, closed)
A
02/16/2024
Cycle 9 facade report signed — SWARMP
02/12/2024
Signed off — Alteration
CONNECT EXISTING GAS PIPING TO REPLACEMENT BOILER/BURNER. THIS APPLICATION IS A RE-FILING OF JOB# 120911941. APPLICATION BEING REFILED IN ORDER TO OBTAIN PERMITS AND INSPECTIONS. JOB# 120911941 TO BE WITHDRAWN.
M00542596-I1
02/12/2024
Signed off — Alteration
M00542612-I1
12/24/2023
Cycle 9 facade report submitted
11/10/2023
Cycle 9 facade inspection completed
07/19/2023
Violation issued (HPD, closed)
C
03/16/2023
Violation issued (HPD, closed)
A
02/16/2022
Violation issued (HPD, closed)
A
02/04/2022
Violation issued (ECB, closed)
Construction
11/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/18/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/29/2021
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
07/28/2021
Filed — Alteration
CONNECT EXISTING GAS PIPING TO REPLACEMENT BOILER/BURNER. THIS APPLICATION IS A RE-FILING OF JOB# 120911941. APPLICATION BEING REFILED IN ORDER TO OBTAIN PERMITS AND INSPECTIONS. JOB# 120911941 TO BE WITHDRAWN.
M00542596-P1
07/27/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/27/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/15/2021
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/12/2021
Permit issued — Plumbing
M00542596-I1-PL
07/12/2021
Permit issued — Boiler Equipment
M00542612-I1-BE
07/01/2021
Filed — Alteration
CONNECT EXISTING GAS PIPING TO REPLACEMENT BOILER/BURNER. THIS APPLICATION IS A RE-FILING OF JOB# 120911941. APPLICATION BEING REFILED IN ORDER TO OBTAIN PERMITS AND INSPECTIONS. JOB# 120911941 TO BE WITHDRAWN.
M00542596-I1
07/01/2021
Filed — Alteration
M00542612-I1
06/17/2021
Special inspection requirement — Maintenance information
LOUIS ARENA
06/17/2021
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
06/17/2021
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
06/17/2021
Special inspection requirement — Heating Systems
LOUIS ARENA
05/20/2021
Violation issued (ECB, open)
Construction
10/07/2020
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00379657-P1
08/05/2020
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00379657-I1
08/05/2020
Permit issued — Sidewalk Shed
M00379657-I1-SH
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/29/2018
Cycle 8 facade report submitted
11/09/2018
Cycle 8 facade inspection completed
10/28/2018
Cycle 8 facade report signed — SWARMP
Latest 60 of 115 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedABANNO WATERPROOFING INC09/03/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC08/15/2025
DOB NOWSuspended ScaffoldSigned-offABANNO WATERPROOFING INC08/08/2025
DOB NOWGeneral ConstructionSigned-offMANHATTAN PROFESSIONAL03/25/2025
DOB NOWPlumbingSigned-offWARD PLUMBING CORP07/12/2021
DOB NOWBoiler EquipmentSigned-offWARD PLUMBING CORP07/12/2021
DOB NOWSidewalk ShedSigned-offUNIVERSAL SYSTEMS INC08/05/2020
BISOTISSUEDABANNO WATERPROOFING INC10/16/2020
BISOTISSUEDABANNO WATERPROOFING INC09/18/2020
BISEQISSUEDEVEREST SCAFFOLDING INC05/13/2014
BISOTISSUEDL & M RESTORATION INC04/18/2014
BISBLISSUEDWARD PLUMBING CORP12/08/2011
BISPLISSUEDWARD PLUMBING CORP12/08/2011
BISOTISSUEDABBYLARA SERVICES CORP02/27/2008
BISOTISSUEDABBYLARA SERVICES CORP01/09/2008
BISOTISSUEDABANNO BUILDING MAINENANCE INC.07/25/2007
BISEQISSUEDSPRING SCAFFOLDING INC05/31/2002
BISEQISSUEDSPRING SCAFFOLDING INC03/22/2001
BISEQISSUEDSPRING SCAFFOLDING INC11/08/2000
BISPLISSUEDBAY RIDGE P & H INC02/01/1996
4 projects · most recent 08/13/2025
FiledStatusContractorScope
08/13/2025CompleteBOROWIDE ELECT'L CONTR'S—
04/28/2021CompleteKRAFT ELECTRIC CORP—
08/03/2020CompleteTOP SHELF ELECTRIC CORP—
10/28/2019Permit IssuedSTAR ELEC'L CONTRACTORS C—
1 project · most recent 08/05/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/05/2025Permit IssuedABANNO WATERPROOFING INCTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/27/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/27/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/15/2021Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
08/05/2025Energy Code Compliance InspectionsMichael Larkinprogress
04/24/2025Air barrier - visual inspectionMichael Larkinenergy_progress
03/07/2025Lighting in dwelling unitsAnn Macklinenergy_progress
03/07/2025MasonryJohn Monroespecial
03/07/2025Post-installed AnchorsJohn Monroespecial
03/07/2025Structural Stability – Alterations of existing buildingsJohn Monroespecial
03/07/2025Wall Panels, Curtain Walls, and VeneersJohn Monroespecial
03/07/2025Fire-Resistant Penetrations and JointsAnn Macklinspecial
03/07/2025Energy Code Compliance InspectionsAnn Macklinprogress
03/07/2025FinalAnn Macklinprogress
08/16/2024FinalMichael Larkinprogress
08/16/2024Tenant Protection Plan ComplianceSHAHRIAR QUAYYUMspecial
07/29/2021Energy Code Compliance InspectionsLOUIS ARENAprogress
06/17/2021Maintenance informationLOUIS ARENAenergy_progress
06/17/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
06/17/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
06/17/2021Heating SystemsLOUIS ARENAspecial
▾Documents — 108 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch7
09/03/2026M00542612-I1Request digital key ↗
09/03/2026M00542596-I1Request digital key ↗
09/03/2026M00542596-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/04/2026M00379657-I1Request digital key ↗
09/04/2026M00379657-P1Request digital key ↗
▸Applications & Permits19
▸BISPLAN / WORK APPROVAL APPLICATION10
02/22/2024120911941Open ↗
03/03/2022123798907Open ↗
09/10/2020123798907Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION4
09/21/2020123798907Open ↗
04/23/2014121930544Open ↗
12/12/2011120911941Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLPC Approval/Permit4
09/03/2026M00542596-I1Open ↗
08/13/2026M00542596-P1Open ↗
08/13/2026M01191906-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSIDEWALK SHED APPLICATION & PERMIT1
09/16/2020123798907Open ↗
▸Seals & Professional Certifications33
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
01/22/2020123798907Open ↗
01/07/2015121930544Open ↗
01/07/2015121930544Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026M00542612-I1Open ↗
09/23/2026M00542612-I1Open ↗
09/23/2026M00542612-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/04/2026M00379657-P1Open ↗
09/04/2026M00379657-I1Open ↗
09/03/2026M00542596-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026M00542612-I1Open ↗
08/28/2026M01097453-I1Open ↗
08/28/2026M01097453-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/14/2014122006667Open ↗
12/05/2011120911941Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/14/2014122006667Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/05/2011120911941Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
12/05/2011120911941Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
05/03/2012120911941Open ↗
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan2
09/04/2026M00379657-I1Open ↗
09/04/2026M00379657-P1Open ↗
▸BISTenant Protection Plan and Notes1
01/22/2020123798907Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
12/17/2011120911941Open ↗
▸Environmental & Asbestos8
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
09/10/2020123798907Open ↗
04/03/2014121930544Open ↗
02/26/2014121930544Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
12/05/2011120911941Open ↗
12/05/2011120911941Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
09/16/2020123798907Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/22/2026M01097453-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
01/22/2020123798907Open ↗
01/07/2015121930544Open ↗
02/26/2014121930544Open ↗
▸BISTECHNICAL REPORT: ENERGY2
12/05/2011120911941Open ↗
12/05/2011120911941Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/07/2015121930544Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00542612-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00542612-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISLANDMARKS APPROVAL3
04/22/2014121930544Open ↗
12/12/2011120911941Open ↗
—123798907Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/13/2015121930544Open ↗
10/09/2014122006667Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/09/2014122006667Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/05/2011120911941Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
04/07/2022123798907Open ↗
01/22/2020123798907Open ↗
10/30/2014121930544Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION7
04/08/2022123798907Open ↗
09/15/2020123798907Open ↗
09/14/2020123798907Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET4
01/22/2020123798907Open ↗
05/14/2014122006667Open ↗
02/26/2014121930544Open ↗
Showing 3 of 4 on file for this type
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026M01264633-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01264633-I1Open ↗