DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
ECB02/08/20052 51) BOILER WAS OPERATING WITHOUT A LICENSED STATIONARY ENGINEER.Nothing owed — awaiting certificate of correction
ECB02/08/20052 51 2) BIOLER WAS OPERATING WITHOUT A LICENSED STAIRWAY ENGINEER.Nothing owed — awaiting certificate of correction
ECB02/08/20051 1) OPERATION OF BOILER #8099-01 WITHOUT THE BUILDING DEPT. LIFTING THE SEAL ON THE BOILER.Nothing owed — awaiting certificate of correction
ECB02/01/200551/2 51)BOILER SEALED 2)NO LICENSED ENGINEER ON DUTYNothing owed — awaiting certificate of correction
ECB02/01/200551/2 51 BOILER SEALED 2 NO LICENCED ON DUTYNothing owed — awaiting certificate of correction
ECB01/24/20052 18A 38 51 50A 50B 2 NO LICENSED ENGINEER ON DUTY 50A) PIPE DOWN THE SAFETY VALVE DISCHARGE TO A SAFE POINT. 50B) REVERSE THE VALVES ON THEBOTTOM BLOWDOWN LINE SO THAT THE QUICK OPENING VALVE IS CLOSEST TO THENothing owed — awaiting certificate of correction
ECB01/24/200550 50 THERE IS NO LOG KEPT OF DAY TO DAY BOILER PLANT OPERATIONS, OF THE TWO HIGH PRESSURE BOILERS.Nothing owed — awaiting certificate of correction
ECB01/24/20052/51 18A 38 50A 50B 50C CYCLOTHERM 1988 51) CEASE USE 2) NO LICENSED ENGINEER ON DUTY. 50A) INSTALL A DOOR ON THE BOILER ROOM IN FRONT OF THE #2 BOILER 50B) PIPE SAFETY VALVE DOWN SO THAT IT DISCHARGES TO PIT.Nothing owed — awaiting certificate of correction