DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
HPD11/01/2017§ 27-2005, 2007 HMC: REMOVE THE ILLEGAL DOUBLE CYLINDER KEY OPERATED LOCKING DEVICE AT DOOR TO METAL GATE AT ENTRANCE TO BUILDING FRONT
ECB08/27/2008B254,15,32A,34B,36,50,50A,B,C,D.50-MUST PIPE DOWN BACK FLOW PREVENTOR.50A-NEED CLEAN OUT AT BASE OF CHIMNEY.50B-SMOKE PIPE NOT PITCHED.50C-NEED PLANS TO SHOW THAT CHIMNEY IS LARGE ENOUGH FOR TWO BOILERS & WATERNothing owed — awaiting certificate of correction
ECB08/27/2008B154,4A,19B,36,50,50A.50-NEED SHUT OFF FOR EXPANSION TANK.50A-NEED CHECK VALVE BETWEEN PRESSURE REDUCING VALVE & BACKFLOW PREVENTOR.(HOT WATER BOILER).Nothing owed — awaiting certificate of correction
ECB06/27/2006WORK W/O A PERMIT. WORK NOTED AT THE REAR YARD OF PREMISES CONSTRUCTEDA WOOD DECK APROX 20FT X 20FT X 12FT HI W/ STAIRS LEADING TO THE 2ND FL REMEDY:OBTAIN A PERMIT IF FEASIBLE OR RESTORENothing owed — awaiting certificate of correction